FFY 2016 Federal Funds Obligation Report, Boston Region MPO and Statewide Projects

These tables list the transportation projects on which federal funds were expended during FFY 2016 (October 1, 2015 - September 30, 2016). Table 1 includes transportation projects located entirely within the Boston Region MPO area. Table 2 includes statewide transportation improvement programs and transportation projects that span the Boston Region MPO area and neighboring MPO regions.

TABLE 1 - Boston – FFY 2016 Federal Funds Obligations by MPO

Project ID Project Description Date Sum of Obligation
606146 CANTON- NORWOOD- WESTWOOD- DEDHAM STREET/I-95 INTERCHANGE RECONSTRUCTION INCLUDING REHABILITATION/REPLACEMENT OF 5 BRIDGES 07/22/2016  $13,524,207.82
601579 WAYLAND- SIGNAL & INTERSECTION IMPROVEMENTS AT ROUTE 27 (MAIN STREET) AND ROUTE 30 (COMMONWEALTH ROAD) 01/08/2016  $2,034,182.80
607498 QUINCY- BRIDGE MAINTENANCE OF Q-01-051 ON ROUTE 3 03/25/2016  $1,622,025.96
603917 MEDFORD- STONEHAM- WOBURN- READING- HIGHWAY LIGHTING REHABILITATION ON I-93 (PHASE II) 03/25/2016  $12,000,000.00
607755 WEYMOUTH- INTERSECTION & SIGNAL IMPROVEMENTS AT 2 LOCATIONS: SR 53 (WASHINGTON STREET) AT MUTTON LANE & PLEASANT STREET 07/29/2016  $1,053,342.76
FBD COMMUTER FERRY TO BOSTON, WINTHROP, MASSACHUSETTS  09/14/2016  $87,262.00
608180 WELLESLEY- RESURFACING ON ROUTE 9, FROM LIMIT OF ADD-A-LANE TO EAST OF OVERBROOK INTERSECTION 08/05/2016  $6,673,271.32
600867 BOSTON- BRIDGE REHABILITATION, B-16-237, MASSACHUSETTS AVENUE (ROUTE 2A) OVER COMMONWEALTH AVENUE 08/12/2016  $8,047,694.51
608000 BEDFORD- IMPROVEMENTS AT JOHN GLENN MIDDLE (SRTS) 08/19/2016  $1,015,292.34
607685 BRAINTREE- SUPERSTRUCTURE REPLACEMENT, B-21-060 AND B-21-061, ST 3 (SB) AND ST 3 (NB) OVER RAMP C (QUINCY ADAMS)  08/19/2016  $7,971,613.87
608281 FRAMINGHAM- NATICK- ADAPTIVE SIGNAL CONTROL ON ROUTE 9 (WORCESTER ROAD) 08/19/2016  $564,389.45
604652 STONEHAM- WINCHESTER- WOBURN- TRI-COMMUNITY BIKEWAY INCLUDING NEW BRIDGE, W-43-029, OVER THE ABERJONA RIVER 08/19/2016  $4,736,786.56
605189 CONCORD- BRUCE FREEMAN RAIL TRAIL CONSTRUCTION, FROM COMMONWEALTH AVENUE TO POWDER MILL ROAD, INCLUDES 2 RAILROAD BRIDGES, C-19-036 & C-19-038 AND 1 CULVERT, C-19-015 (PHASE II-C) 08/26/2016  $7,408,117.44
605721 WEYMOUTH- INTERSECTION IMPROVEMENTS @ MIDDLE STREET, LIBBEY INDUSTRIAL PARKWAY AND TARA DRIVE 08/26/2016  $934,867.28
606117 BOSTON- TRAFFIC SIGNAL IMPROVEMENTS AT 9 LOCATIONS 08/26/2016  $3,574,346.96
605733 BOSTON- HIGHWAY LIGHTING SYSTEM REPLACEMENT ON I-93, FROM SOUTHAMPTON STREET TO NEPONSET AVENUE 08/26/2016  $2,922,656.19
607409 LEXINGTON- RECONSTRUCTION ON MASSACHUSETTS AVENUE, FROM MARRETT ROAD TO PLEASANT STREET 09/09/2016  $4,859,055.78
607998 EVERETT- IMPROVEMENTS AT MADELAINE ENGLISH (SRTS) 09/09/2016  $725,251.82
603711 NEEDHAM- WELLESLEY- 6 BRIDGE LOCATIONS ON I-95/ROUTE 128: N-04-020, N-04-021, N-04-022, N-04-026, N-04-027, N-04-037 & W-13-023 (ADD-A-LANE - CONTRACT V) 09/13/2016  $18,309,378.40
607345 COHASSET- SUPERSTRUCTURE REPLACEMENT & SUBSTRUCTURE REHABILITATION, C-17-002, ATLANTIC AVENUE OVER LITTLE HARBOR INLET 09/15/2016  $3,745,473.06
608059 SALEM- STORMWATER IMPROVEMENTS ALONG ROUTE 107 (SALEM BYPASS ROAD) 09/15/2016  $234,416.50
603008 WOBURN- BRIDGE REPLACEMENT, W-43-003, SALEM STREET OVER MBTA 09/19/2016  $6,234,956.56
606553 HANOVER- NORWELL- BRIDGE REPLACEMENT, H-06-010, ST 3 OVER ST 123 (WEBSTER STREET) & N-24-003, ST 3 OVER HIGH STREET 09/19/2016  $32,757,346.89
605664 MARSHFIELD- RESURFACING & RELATED WORK ON ROUTE 3A 09/20/2016  $3,482,460.21
608538 MARLBOROUGH- BRIDGE PRESERVATION, M-06-009, US 20 (OLD BOSTON ROAD) OVER I-495 (NB & SB) 09/20/2016  $1,375,020.48
601630 WEYMOUTH- ABINGTON- RECONSTRUCTION & WIDENING ON ROUTE 18 (MAIN STREET) FROM HIGHLAND PLACE TO ROUTE 139 (4.0 MILES) INCLUDES REPLACING W-32-013, ROUTE 18 OVER THE OLD COLONY RAILROAD (MBTA) 09/23/2016  $14,108,623.26
Grand Total     $160,002,040.22

 

TABLE 2 - Statewide – FFY 2016 Federal Funds Obligations by MPO

Project ID Project Description Date Sum of Obligation
PLANNING ON THE JOB TRAINING SUPPORTIVE SERVICES - 2016 OJT/SS 09/15/2016  $105,538.91
PLANNING DISADVANTAGED BUSINESS ENTERPRISE SUPPORTIVE SERVICES 09/15/2016  $200,069.00
SHSP STATEWIDE- VARIOUS SAFETY STRATEGIES TO BE DETERMINED BASED ON 2013 SHSP AND UPDATES  12/14/2015  ($30,168.53)
SHSP STATEWIDE- VARIOUS SAFETY STRATEGIES TO BE DETERMINED BASED ON 2013 SHSP AND UPDATES  07/29/2016  $153,000.00
SHSP STATEWIDE- VARIOUS SAFETY STRATEGIES TO BE DETERMINED BASED ON 2013 SHSP AND UPDATES  09/27/2016  $331,687.22
608031 STATEWIDE- ITS DESIGN CONSULTANT SERVICES 01/12/2016  $400,000.00
608031 STATEWIDE- ITS DESIGN CONSULTANT SERVICES 05/10/2016  $400,000.00
608031 STATEWIDE- ITS DESIGN CONSULTANT SERVICES 09/19/2016  $750,000.00
607513 DISTRICT 5- BRIDGE CLEANING AND RELATED WORK ALONG I-95, I-195 AND I-295 CORRIDORS 02/04/2016  $1,636,931.20
608060 GARDNER- SHREWSBURY- STORMWATER IMPROVEMENTS ALONG ROUTE 68 AND ROUTE 70 03/04/2016  $589,756.80
606176 FRANKLIN- WRENTHAM- PLAINVILLE- FOXBOROUGH- MANSFIELD- INTERSTATE MAINTENANCE & RELATED WORK ON I-495 (NB & SB) 03/18/2016  $5,714,114.37
607035 DISTRICT 1- ADA RETROFITS AT VARIOUS LOCATIONS 03/25/2016  $285,467.98
606620 RAYNHAM TO BOLTON- GUIDE & TRAFFIC SIGN REPLACEMENT ON I-495 03/25/2016  $7,759,498.75
608022 BRIMFIELD- STURBRIDGE- RESURFACING & RELATED WORK ON ROUTE 20, BEGINNING EAST OF NEW HOLLAND ROAD (MM 87.8), ENDING WEST OF GALILEO DRIVE (MM 91.9)  05/27/2016  $3,159,238.08
607036 DISTRICT 2- ADA RETROFITS AT VARIOUS LOCATIONS 05/27/2016  $718,540.75
605592 STURBRIDGE- HOLLAND- INTERSTATE MAINTENANCE & RELATED WORK ON I-84 06/10/2016  $14,705,239.93
SRT STATEWIDE RECREATIONAL TRAILS 03/22/2016 $4,859,055.78
SRT STATEWIDE RECREATIONAL TRAILS 04/19/2016 $2,108.00
SRT STATEWIDE RECREATIONAL TRAILS 09/02/2016  $1,172,512.00
82865 MASSRIDES TRAVEL OPTIONS 06/16/2016  $160,000.00
82865 MASSRIDES TRAVEL OPTIONS 09/22/2016  $7,426,789.60
RRC STATEWIDE RR GRADE CROSSINGS 09/27/2016  $7,061,398.36
BRI BRIDGE INSPECTION 09/19/2016  $5,236,800.00
BRI BRIDGE INSPECTION 09/22/2016  $12,219,200.00
606995 CHELMSFORD- CONCORD- LOWELL- PEABODY- STORMWATER IMPROVEMENTS ALONG ROUTE 2, ROUTE 128, AND ROUTE 3 08/26/2016  $1,074,976.16
606927 STATEWIDE- REPLACEMENT OF VARIABLE MESSAGE SIGNS (VMS) 08/26/2016  $2,704,861.25
607482 DISTRICT 5- DISTRICT 6- ITS CONSTRUCTION ON ROUTE 3, FROM BRAINTREE TO PLYMOUTH 09/09/2016  $4,291,653.20
607495 DISTRICT 5- RETROREFLECTIVE SIGN UPGRADE ON SECONDARY ROADS 09/09/2016  $945,208.01
608398 DISTRICT 4- RETROREFLECTIVE SIGN UPGRADES ON SECONDARY ROADS 09/09/2016  $646,878.60
607524 BELCHERTOWN- WARREN- BRIDGE DEMOLITION OF B-05-023, WILSON STREET OVER NECRR, & W-07-012, OLD BOSTON POST ROAD OVER NAULTAUG BROOK 09/09/2016  $584,325.00
607918 DISTRICT 5- GUIDE & TRAFFIC SIGN REPLACEMENT & RELATED WORK ON A SECTION OF US ROUTE 6 (MID-CAPE HIGHWAY) 09/15/2016  $1,784,174.40
29492 BEDFORD- BILLERICA- MIDDLESEX TURNPIKE IMPROVEMENTS, FROM CROSBY DRIVE NORTH TO MANNING ROAD, INCLUDES RECONSTRUCTION OF B-04-006 (PHASE III) 09/22/2016  $22,637,079.00
97941 SHRP2 - IMPLEMENTATION ASSISTANCE PROGRAM PLANWORKS - SOUTHEASTERN REGIONAL PLANNING AND ECONOMIC DEVELOPMENT DISTRICT 09/26/2016  $100,000.00
Grand Total     $104,936,637.04