These tables list the transportation projects on which federal funds were expended during FFY 2016 (October 1, 2015 - September 30, 2016). Table 1 includes transportation projects located entirely within the Boston Region MPO area. Table 2 includes statewide transportation improvement programs and transportation projects that span the Boston Region MPO area and neighboring MPO regions.
Project ID | Project Description | Date | Sum of Obligation |
606146 | CANTON- NORWOOD- WESTWOOD- DEDHAM STREET/I-95 INTERCHANGE RECONSTRUCTION INCLUDING REHABILITATION/REPLACEMENT OF 5 BRIDGES | 07/22/2016 | $13,524,207.82 |
601579 | WAYLAND- SIGNAL & INTERSECTION IMPROVEMENTS AT ROUTE 27 (MAIN STREET) AND ROUTE 30 (COMMONWEALTH ROAD) | 01/08/2016 | $2,034,182.80 |
607498 | QUINCY- BRIDGE MAINTENANCE OF Q-01-051 ON ROUTE 3 | 03/25/2016 | $1,622,025.96 |
603917 | MEDFORD- STONEHAM- WOBURN- READING- HIGHWAY LIGHTING REHABILITATION ON I-93 (PHASE II) | 03/25/2016 | $12,000,000.00 |
607755 | WEYMOUTH- INTERSECTION & SIGNAL IMPROVEMENTS AT 2 LOCATIONS: SR 53 (WASHINGTON STREET) AT MUTTON LANE & PLEASANT STREET | 07/29/2016 | $1,053,342.76 |
FBD | COMMUTER FERRY TO BOSTON, WINTHROP, MASSACHUSETTS | 09/14/2016 | $87,262.00 |
608180 | WELLESLEY- RESURFACING ON ROUTE 9, FROM LIMIT OF ADD-A-LANE TO EAST OF OVERBROOK INTERSECTION | 08/05/2016 | $6,673,271.32 |
600867 | BOSTON- BRIDGE REHABILITATION, B-16-237, MASSACHUSETTS AVENUE (ROUTE 2A) OVER COMMONWEALTH AVENUE | 08/12/2016 | $8,047,694.51 |
608000 | BEDFORD- IMPROVEMENTS AT JOHN GLENN MIDDLE (SRTS) | 08/19/2016 | $1,015,292.34 |
607685 | BRAINTREE- SUPERSTRUCTURE REPLACEMENT, B-21-060 AND B-21-061, ST 3 (SB) AND ST 3 (NB) OVER RAMP C (QUINCY ADAMS) | 08/19/2016 | $7,971,613.87 |
608281 | FRAMINGHAM- NATICK- ADAPTIVE SIGNAL CONTROL ON ROUTE 9 (WORCESTER ROAD) | 08/19/2016 | $564,389.45 |
604652 | STONEHAM- WINCHESTER- WOBURN- TRI-COMMUNITY BIKEWAY INCLUDING NEW BRIDGE, W-43-029, OVER THE ABERJONA RIVER | 08/19/2016 | $4,736,786.56 |
605189 | CONCORD- BRUCE FREEMAN RAIL TRAIL CONSTRUCTION, FROM COMMONWEALTH AVENUE TO POWDER MILL ROAD, INCLUDES 2 RAILROAD BRIDGES, C-19-036 & C-19-038 AND 1 CULVERT, C-19-015 (PHASE II-C) | 08/26/2016 | $7,408,117.44 |
605721 | WEYMOUTH- INTERSECTION IMPROVEMENTS @ MIDDLE STREET, LIBBEY INDUSTRIAL PARKWAY AND TARA DRIVE | 08/26/2016 | $934,867.28 |
606117 | BOSTON- TRAFFIC SIGNAL IMPROVEMENTS AT 9 LOCATIONS | 08/26/2016 | $3,574,346.96 |
605733 | BOSTON- HIGHWAY LIGHTING SYSTEM REPLACEMENT ON I-93, FROM SOUTHAMPTON STREET TO NEPONSET AVENUE | 08/26/2016 | $2,922,656.19 |
607409 | LEXINGTON- RECONSTRUCTION ON MASSACHUSETTS AVENUE, FROM MARRETT ROAD TO PLEASANT STREET | 09/09/2016 | $4,859,055.78 |
607998 | EVERETT- IMPROVEMENTS AT MADELAINE ENGLISH (SRTS) | 09/09/2016 | $725,251.82 |
603711 | NEEDHAM- WELLESLEY- 6 BRIDGE LOCATIONS ON I-95/ROUTE 128: N-04-020, N-04-021, N-04-022, N-04-026, N-04-027, N-04-037 & W-13-023 (ADD-A-LANE - CONTRACT V) | 09/13/2016 | $18,309,378.40 |
607345 | COHASSET- SUPERSTRUCTURE REPLACEMENT & SUBSTRUCTURE REHABILITATION, C-17-002, ATLANTIC AVENUE OVER LITTLE HARBOR INLET | 09/15/2016 | $3,745,473.06 |
608059 | SALEM- STORMWATER IMPROVEMENTS ALONG ROUTE 107 (SALEM BYPASS ROAD) | 09/15/2016 | $234,416.50 |
603008 | WOBURN- BRIDGE REPLACEMENT, W-43-003, SALEM STREET OVER MBTA | 09/19/2016 | $6,234,956.56 |
606553 | HANOVER- NORWELL- BRIDGE REPLACEMENT, H-06-010, ST 3 OVER ST 123 (WEBSTER STREET) & N-24-003, ST 3 OVER HIGH STREET | 09/19/2016 | $32,757,346.89 |
605664 | MARSHFIELD- RESURFACING & RELATED WORK ON ROUTE 3A | 09/20/2016 | $3,482,460.21 |
608538 | MARLBOROUGH- BRIDGE PRESERVATION, M-06-009, US 20 (OLD BOSTON ROAD) OVER I-495 (NB & SB) | 09/20/2016 | $1,375,020.48 |
601630 | WEYMOUTH- ABINGTON- RECONSTRUCTION & WIDENING ON ROUTE 18 (MAIN STREET) FROM HIGHLAND PLACE TO ROUTE 139 (4.0 MILES) INCLUDES REPLACING W-32-013, ROUTE 18 OVER THE OLD COLONY RAILROAD (MBTA) | 09/23/2016 | $14,108,623.26 |
Grand Total | $160,002,040.22 |
Project ID | Project Description | Date | Sum of Obligation |
PLANNING | ON THE JOB TRAINING SUPPORTIVE SERVICES - 2016 OJT/SS | 09/15/2016 | $105,538.91 |
PLANNING | DISADVANTAGED BUSINESS ENTERPRISE SUPPORTIVE SERVICES | 09/15/2016 | $200,069.00 |
SHSP | STATEWIDE- VARIOUS SAFETY STRATEGIES TO BE DETERMINED BASED ON 2013 SHSP AND UPDATES | 12/14/2015 | ($30,168.53) |
SHSP | STATEWIDE- VARIOUS SAFETY STRATEGIES TO BE DETERMINED BASED ON 2013 SHSP AND UPDATES | 07/29/2016 | $153,000.00 |
SHSP | STATEWIDE- VARIOUS SAFETY STRATEGIES TO BE DETERMINED BASED ON 2013 SHSP AND UPDATES | 09/27/2016 | $331,687.22 |
608031 | STATEWIDE- ITS DESIGN CONSULTANT SERVICES | 01/12/2016 | $400,000.00 |
608031 | STATEWIDE- ITS DESIGN CONSULTANT SERVICES | 05/10/2016 | $400,000.00 |
608031 | STATEWIDE- ITS DESIGN CONSULTANT SERVICES | 09/19/2016 | $750,000.00 |
607513 | DISTRICT 5- BRIDGE CLEANING AND RELATED WORK ALONG I-95, I-195 AND I-295 CORRIDORS | 02/04/2016 | $1,636,931.20 |
608060 | GARDNER- SHREWSBURY- STORMWATER IMPROVEMENTS ALONG ROUTE 68 AND ROUTE 70 | 03/04/2016 | $589,756.80 |
606176 | FRANKLIN- WRENTHAM- PLAINVILLE- FOXBOROUGH- MANSFIELD- INTERSTATE MAINTENANCE & RELATED WORK ON I-495 (NB & SB) | 03/18/2016 | $5,714,114.37 |
607035 | DISTRICT 1- ADA RETROFITS AT VARIOUS LOCATIONS | 03/25/2016 | $285,467.98 |
606620 | RAYNHAM TO BOLTON- GUIDE & TRAFFIC SIGN REPLACEMENT ON I-495 | 03/25/2016 | $7,759,498.75 |
608022 | BRIMFIELD- STURBRIDGE- RESURFACING & RELATED WORK ON ROUTE 20, BEGINNING EAST OF NEW HOLLAND ROAD (MM 87.8), ENDING WEST OF GALILEO DRIVE (MM 91.9) | 05/27/2016 | $3,159,238.08 |
607036 | DISTRICT 2- ADA RETROFITS AT VARIOUS LOCATIONS | 05/27/2016 | $718,540.75 |
605592 | STURBRIDGE- HOLLAND- INTERSTATE MAINTENANCE & RELATED WORK ON I-84 | 06/10/2016 | $14,705,239.93 |
SRT | STATEWIDE RECREATIONAL TRAILS | 03/22/2016 | $4,859,055.78 |
SRT | STATEWIDE RECREATIONAL TRAILS | 04/19/2016 | $2,108.00 |
SRT | STATEWIDE RECREATIONAL TRAILS | 09/02/2016 | $1,172,512.00 |
82865 | MASSRIDES TRAVEL OPTIONS | 06/16/2016 | $160,000.00 |
82865 | MASSRIDES TRAVEL OPTIONS | 09/22/2016 | $7,426,789.60 |
RRC | STATEWIDE RR GRADE CROSSINGS | 09/27/2016 | $7,061,398.36 |
BRI | BRIDGE INSPECTION | 09/19/2016 | $5,236,800.00 |
BRI | BRIDGE INSPECTION | 09/22/2016 | $12,219,200.00 |
606995 | CHELMSFORD- CONCORD- LOWELL- PEABODY- STORMWATER IMPROVEMENTS ALONG ROUTE 2, ROUTE 128, AND ROUTE 3 | 08/26/2016 | $1,074,976.16 |
606927 | STATEWIDE- REPLACEMENT OF VARIABLE MESSAGE SIGNS (VMS) | 08/26/2016 | $2,704,861.25 |
607482 | DISTRICT 5- DISTRICT 6- ITS CONSTRUCTION ON ROUTE 3, FROM BRAINTREE TO PLYMOUTH | 09/09/2016 | $4,291,653.20 |
607495 | DISTRICT 5- RETROREFLECTIVE SIGN UPGRADE ON SECONDARY ROADS | 09/09/2016 | $945,208.01 |
608398 | DISTRICT 4- RETROREFLECTIVE SIGN UPGRADES ON SECONDARY ROADS | 09/09/2016 | $646,878.60 |
607524 | BELCHERTOWN- WARREN- BRIDGE DEMOLITION OF B-05-023, WILSON STREET OVER NECRR, & W-07-012, OLD BOSTON POST ROAD OVER NAULTAUG BROOK | 09/09/2016 | $584,325.00 |
607918 | DISTRICT 5- GUIDE & TRAFFIC SIGN REPLACEMENT & RELATED WORK ON A SECTION OF US ROUTE 6 (MID-CAPE HIGHWAY) | 09/15/2016 | $1,784,174.40 |
29492 | BEDFORD- BILLERICA- MIDDLESEX TURNPIKE IMPROVEMENTS, FROM CROSBY DRIVE NORTH TO MANNING ROAD, INCLUDES RECONSTRUCTION OF B-04-006 (PHASE III) | 09/22/2016 | $22,637,079.00 |
97941 | SHRP2 - IMPLEMENTATION ASSISTANCE PROGRAM PLANWORKS - SOUTHEASTERN REGIONAL PLANNING AND ECONOMIC DEVELOPMENT DISTRICT | 09/26/2016 | $100,000.00 |
Grand Total | $104,936,637.04 |