Appendix B—Universe of Projects and Programs

 

B.1      Introduction

One of the primary outcomes of the LRTP process is to create a list of major capital expansion projects and a set of programs for implementation during the next-25 years. Thus, the MPO created a Universe of Projects and Programs list to identify all potential projects and programs. This appendix contains that list for both highway and transit projects.

 

Each project is associated with one of the six established MPO programs:

  1. Intersection Improvements
  2. Complete Streets
  3. Bicycle Network and Pedestrian Connections
  4. Community Transportation and Parking
  5. Major Infrastructure
  6. Transit

 

The MPO used the “Universe” list to develop a draft list of projects and programs for public review and the final list to include in this LRTP. The Universe of Projects and Programs includes the following projects that:

 

The projects in the Universe list are presented in three categories and sorted by program type. Table B.1 lists all major infrastructure projects that were included in the last LRTP, Paths to a Sustainable Region. Table B.2 lists all projects that add capacity to the transportation system or that cost more than $20 million. These projects must be listed in the LRTP before they can be programmed for construction in the TIP. Table B.3 lists all projects that do not add capacity to the transportation system and cost less than $20 million. These projects can be programmed directly in the TIP without being mentioned in the LRTP. They generally fall into one of the programs that are included in the LRTP and are listed above.

 

Information in each of the tables includes:

  1. Project Type (the project falls into one of the following categories):
  2. Investment Program (the project falls into one of the following programs):
  3. PROJIS Number: projects in MassDOT’s project-tracking system are given a number; projects not in the system have no number.
  4. Project Proponent: project sponsor
  5. Project Name
  6. TIP/LRTP Status (one of the following):
  7. CTPS Study: past UPWP-funded studies or reports were conducted within the project area
  8. Estimated Cost
  9. Project Length in miles
  10. Whether it is included in the 2015–2018 TIP

 

 

TABLE B.1

Universe of Projects and Programs List

 
Project Type Investment Program PROJIS Proponent(s) Project Name TIP/
LRTP Status 
CTPS Study Estimated Cost Project Length 2015-2018 TIP
Currently Listed in Paths to a Sustainable Region                
Arterial and Intersection Bottleneck 5399 Salem Reconstruction of Bridge Street, from Flint Street to Washington Street LRTP
2016-20
N/A $16,613,000 0.4 N/A
Arterial and Intersection Bottleneck 601630 Weymouth Route 18 Widening LRTP
2016-20
N/A $59,000,000 4.0 X
Arterial and Intersection Bottleneck 604935 Woburn Montvale Avenue Widening LRTP
2016-20
N/A $4,225,256   X
Arterial and Intersection Major Infrastructure 29492 Bedford Middlesex Turnpike Phase III LRTP
2016-20
N/A $26,935,171   X
Arterial and Intersection Major Infrastructure 606226 Boston Reconstruction of Rutherford Avenue, from City Square to Sullivan Square LRTP
2016-20
N/A $109,967,000 2.9 N/A
Arterial and Intersection Major Infrastructure 606109 Framingham Intersection Improvements at Route 126/135/MBTA & CSX Railroad LRTP
2026-30
N/A $115,000,000 0.2 N/A
Arterial and Intersection Major Infrastructure 606635 Newton, Needham (MassDOT) Reconstruction of Highland Avenue, Needham Street & Charles River Bridge, from Webster Street to Route 9 LRTP
2021-25
N/A $18,000,000 3.0 N/A
Bicycle and Pedestrian Bike Network N/A Stow, Hudson Assabet River Rail Trail LRTP
2016-20
N/A $16,285,600 3.6 N/A
Bridge   604996 Woburn Bridge Replacement, New Boston Street over MBTA LRTP
2016-20
N/A $8,297,198 0.3 N/A
Major Highway Bottleneck N/A Braintree (MassDOT) I-93/Route 3 Interchange (Braintree Split) LRTP
2031-35
2006 $53,289,000 N/A N/A
Major Highway Major Infrastructure 605012 Malden, Revere, Saugus (MassDOT) Reconstruction & Widening on Route 1, from Route 60 to Route 99 LRTP
2031-35
N/A $236,078,000 2.1 N/A
Major Highway Major Infrastructure 605605 (608097; 608096) Reading, Stoneham, Wakefield, Woburn (MassDOT) Interchange Improvements to I-93/I-95
((1) Washington Street Bridge over I-95 (2) Improvements along Route 128/I-95 MB Add-a-Lane/Exit 38/Route 28 Re-configuration (3) Modifications to Interchange 38 in Reading, Stoneham and Wakefield)
LRTP
2026-30
N/A $339,100,000 16.5 N/A
Major Highway Major Infrastructure 87790 Canton, Dedham, Norwood (MassDOT) Interchange Improvements at I-95/I-93 (Non-Federal Funds) LRTP    2016-2020   $177,414,000   X
Major Highway Major Infrastructure 606146 Canton, Norwood, Westwood (MassDOT) Ramp Construction on I-95 (NB) and Improvements on Dedham Street/Canton Street (Non-Federal Funds) LRTP      2013-2015   $51,000,000   X
Transit Transit Capacity N/A MPO   Green Line Extension Phase II from College Avenue to Mystic Valley Parkway/Route 16 LRTP             2016-2025 N/A $190,000,000   X
Project Type Investment Program PROJIS Proponent(s) Project Name TIP/
LRTP Status 
CTPS Study Estimated Cost Project Length 2015-2018 TIP
Projects that add capacity to the system/Cost more than $20 million              
Arterial and Intersection Bottleneck N/A Brookline, Newton Route 9 Capacity Improvements  Conceptual N/A N/A N/A N/A
Arterial and Intersection Bottleneck 604619 Lexington Route 4/225 (Bedford Street) and Hartwell Avenue Pre-TIP N/A $23,221,000 N/A N/A
Arterial and Intersection Interchange N/A Revere (MassDOT) Mahoney Circle Grade Separation Conceptual N/A $60,000,000 N/A N/A
Arterial and Intersection Interchange N/A Revere (MassDOT) Route 1/Route 16 Connector Conceptual N/A N/A N/A N/A
Arterial and Intersection Interchange N/A Revere (MassDOT) Route 1A/Route 16 Connector Conceptual N/A N/A N/A N/A
Arterial and Intersection Intersection Improvements N/A MassPort, MassDOT, MBTA, Boston South Boston Transportation Study - Cypher Street extension from D Street to E Street and reconstruct and extend E Street from Cypher Street to Summer Street Conceptual 2015 $9,700,000 N/A  
Arterial and Intersection Intersection Improvements N/A MassPort, MassDOT, MBTA, Boston South Boston Transportation Study - New Summer Street north/south connector to Northern Avenue/Haul Road/Drydock Avenue Conceptual 2015 N/A N/A  
Arterial and Intersection Intersection Improvements N/A MassDOT Route 1 Intersection Signalization (Corridorwide) Conceptual N/A N/A N/A N/A
Arterial and Intersection Major Infrastructure 602091 Concord Improvements & Upgrades to Concord Rotary (Routes 2/2A/119) Pre-TIP 1995 $98,900,000 N/A N/A
Arterial and Intersection Major Infrastructure 607981 Somerville (MassDOT) McGrath Boulevard Project Pre-TIP N/A $65,000,000 N/A N/A
Arterial and Intersection Major Infrastructure N/A CTPS Study Route 30 (Cochituate Road) in Framingham and Natick Conceptual 2013 N/A N/A N/A
Arterial and Intersection   N/A Boston Boardman Street at Route 1A Conceptual 1990 $13,686,000 0.1 N/A
Arterial and Intersection   N/A Milford Veteran's Memorial Drive/Alternate Route Conceptual N/A N/A N/A N/A
Arterial and Intersection   N/A Rockland Completion of the S. Weymouth Naval Air Station - Widening Reservoir Park Drive and Hingham Street Conceptual N/A N/A N/A N/A
Freight Freight Movement N/A Boston Charlestown Haul Road Conceptual N/A N/A N/A N/A
Freight Freight Movement N/A Boston Conley Rail Service  Conceptual N/A N/A N/A N/A
Major Highway Bottleneck N/A CTPS Study Extend I-93 High-Occupancy Vehicle Lane into the City (Somerville) Conceptual N/A N/A N/A N/A
Major Highway Bottleneck N/A CTPS Study I-495 Capacity Improvements (Littleton to Wrentham) Conceptual N/A N/A N/A N/A
Major Highway Bottleneck N/A CTPS Study I-93 Capacity Improvements (Boston to Braintree) Conceptual N/A N/A N/A N/A
Major Highway Bottleneck N/A CTPS Study I-95 Capacity Improvements (Canton to Foxborough) Conceptual N/A N/A N/A N/A
Major Highway Bottleneck N/A CTPS Study Route 128 Capacity Improvements (Lynnfield to Peabody) Conceptual N/A N/A N/A N/A
Major Highway Bottleneck N/A CTPS Study Route 128 HOV (Wellesley to Woburn) Conceptual N/A N/A N/A N/A
Major Highway Bottleneck N/A CTPS Study Route 2 Capacity Improvements (Acton to Lexington) Conceptual N/A N/A N/A N/A
Major Highway Bottleneck N/A CTPS Study Route 24 Capacity Improvements (Taunton to Randolph) Conceptual N/A N/A N/A N/A
Major Highway Bottleneck N/A CTPS Study Interstate 93 Capacity Improvements (Somerville to Woburn) Conceptual N/A N/A N/A N/A
Major Highway Bottleneck 604638 Danvers, Peabody (MassDOT) Mainline Improvements on Route 128 (Phase II) Pre-TIP N/A $23,776,000 1.7 N/A
Bridge Interchange  605313 Natick Bridge Replacement, Route 27 (North Main Street) over Route 9 (Worcester Street) and Interchange Improvements Pre-TIP N/A $25,793,370 N/A N/A
Major Highway Interchange 607977 Hopkinton, Westborough (MassDOT) Reconstruction of I-90/I-495 Interchange Pre-TIP N/A $220,000,000 2.0 N/A
Major Highway Interchange N/A Newton New Route 128 Ramp to Riverside Station  Conceptual N/A N/A N/A N/A
Major Highway Interchange N/A Wilmington I-93/Route 125/Ballardvale Road Conceptual N/A N/A N/A N/A
Major Highway Interchange  607727 Beverly Interchange Reconstruction at Route 128/Exit 19 at Brimbal Avenue (Phase II) Pre-TIP N/A $23,000,000 N/A N/A
Major Highway Interchange  N/A Boston Massachusetts Turnpike Back Bay Exit  Conceptual N/A N/A N/A N/A
Major Highway Interchange  603345 Hudson, Marlborough (MassDOT) Reconstruction on Routes I-290 and 495 and Bridge Replacement Pre-TIP N/A $100,000,000 2.0 N/A
Major Highway Interchange  N/A Randolph I-93/Route 24 Interchange Conceptual N/A N/A N/A N/A
Major Highway Interchange  601513 Saugus (MassDOT) Interchange Reconstruction at Walnut Street & Route 1 (Phase II) Pre-TIP N/A $18,612,130 1.2 N/A
Major Highway Interchange  607701 Southborough, Westborough (MassDOT) Improvements on Route 9 at I-495 Interchange, from Computer Drive/Research Drive to Route 9/Crystal Road Intersection Pre-TIP N/A $25,000,000 4.4 N/A
Major Highway Interchange    Boston (MassDOT) Allston Interstate 90 Massachusetts Turnpike Interchange Improvement Program Pre-TIP   $260,000,000    
Major Highway Bridge   Boston South Boston Transportation Study - Northern Avenue Bridge reconstruction Conceptual   N/A    
Major Highway Major Infrastructure 608128 MassDOT Boston-Southeast Expressway Modification (Southampton Interchange) Conceptual N/A $143,750,000   N/A
Major Highway Major Infrastructure N/A MassDOT Route 3 South Express Toll Lanes Conceptual N/A $800,000,000   N/A
Transit Transit Capacity N/A CTPS Study Build New Busways to Alewife Station (Cambridge) Conceptual N/A N/A N/A N/A
Transit Transit Capacity N/A CTPS Study Construction of new commuter rail stations in Milford and/or Hopedale on the Franklin Line Conceptual 2012 $126-150 million (capital) $3.1-4.3 (operating) N/A N/A
Transit Transit Capacity N/A MassDOT/MBTA South Station Expansion Project Conceptual N/A N/A N/A N/A
Transit Transit Capacity N/A MassDOT/MBTA New Worcester Line Commuter Rail Station in Allston (West Station) Conceptual N/A $200,000,000 N/A N/A
Transit Transit Capacity N/A MassPort, MassDOT, MBTA T Under D (South Boston) Conceptual N/A N/A N/A N/A
Transit Transit Capacity N/A MassPort, MassDOT, MBTA, Boston South Boston Transportation Study - Extension of Silver Line to Dudley Square Conceptual 2015 N/A N/A  
Transit Transit Capacity N/A Private - New Balance Brighton Landing Commuter Rail Station Pre-TIP   $25,000,000 N/A  
Transit Transit Capacity N/A MassDOT/MBTA Maintenance Facilities Conceptual N/A N/A N/A N/A
Transit Transit Capacity N/A MassDOT/MBTA Orient Heights Maintenance Facility Renovation Phase III Conceptual N/A N/A N/A N/A
Transit Transit Capacity N/A Waltham Fitchburg Commuter Rail - Multi-Modal Transit Center N/A N/A N/A N/A
Transit Transit Extension N/A MassDOT/MBTA Urban Rail Service (DMU or EMU) "A" - Riverside to South Station via Worcester CR ROW Conceptual N/A N/A N/A N/A
Transit Transit Extension N/A MassDOT/MBTA Urban Rail Service (DMU or EMU) "B" - Allston to North Station via Grand Junction ROW thru Cambridge Conceptual N/A N/A N/A N/A
Transit Transit Extension N/A MassDOT/MBTA Urban Rail Service (DMU or EMU) "C" - Back Bay to the Convention Center (BCEC) via Worcester CR ROW Conceptual N/A N/A N/A N/A
Transit Transit Extension N/A MassDOT/MBTA Urban Rail Service (DMU or EMU) "D" - Route 128 Station to South Station via Fairmount CR ROW Conceptual N/A N/A N/A N/A
Transit Transit Extension N/A MassDOT/MBTA Urban Rail Service (DMU or EMU) "E" - Lynn to North Station via Newburyport/Rockport CR ROW Conceptual N/A N/A N/A N/A
Transit Transit Extension N/A MassDOT/MBTA Urban Rail Service (DMU or EMU) "F" - Anderson/Woburn to North Station via Lowell CR ROW Conceptual N/A N/A N/A N/A
Transit Transit Extension N/A MassDOT/MBTA Operate Weekday Commuter Rail Service to Foxboro Conceptual N/A N/A N/A N/A
Transit Transit Extension N/A MVPC Bus on Shoulder Conceptual 2014 N/A   N/A
Transit Transit Extension N/A Public Input Improved Cross-Town or Circumferential Transit Conceptual N/A N/A N/A N/A
Transit Transit Extension N/A Public Input Improved connections between North and South Station Conceptual N/A N/A N/A N/A
Transit Transit Modernization N/A Natick Natick Center MBTA Commuter Rail Station Upgrades Conceptual N/A N/A N/A N/A
Transit Transit Modernization N/A Quincy Quincy Center Multimodal MBTA Station Conceptual N/A N/A N/A N/A
Transit N/A N/A MassDOT/MBTA Improved Inner Harbor Ferry Conceptual N/A N/A N/A N/A
Transit N/A N/A MassDOT/MBTA Improved Ferry Service from South Shore Communities to Boston Conceptual N/A N/A N/A N/A
Transit Ferry Service N/A MassPort, MassDOT, MBTA, Boston South Boston Transportation Study - New or expanded ferry service and water transportation infrastructure Conceptual 2015 N/A N/A  
Transit Ferry Service N/A Winn Resort/ Revere Water transportation vessels and dock facilities Conceptual   N/A N/A  
Project Type Investment Program PROJIS Proponent(s) Project Name TIP/
LRTP Status 
CTPS Study Estimated Cost Project Length 2015-2018 TIP
Projects that do not add capacity to the system/Cost under $20 million              
Arterial and Intersection Complete Streets 604123 Ashland Reconstruction on Route 126 (Pond Street), from the Framingham T.L. to the Holliston T.L. Pre-TIP N/A $13,277,000 1.7 N/A
Arterial and Intersection Complete Streets 606453 Boston Improvements on Boylston Street, from Intersection of Brookline Avenue & Park Drive to Ipswich Street Pre-TIP N/A $6,555,000 0.6 N/A
Arterial and Intersection Complete Streets 601274 Boston Reconstruction of Tremont Street, from Court Street to Boylston Street Pre-TIP N/A $2,681,260 0.6 N/A
Arterial and Intersection Complete Streets N/A Chelsea Reconstruction of Beacham and Williams Street, from Spruce Street to the Everett City Line Conceptual N/A N/A 0.5 N/A
Arterial and Intersection Complete Streets 608007 Cohasset Corridor Improvements and Related Work on Justice Cushing Highway (Route 3A), from Beechwood Street to the Scituate Town Line Pre-TIP 2013 $4,000,200 0.8 N/A
Arterial and Intersection Complete Streets 606896 CTPS Study Route 203 (Gallivan Street in Boston) Conceptual 2012 $11,500,000 N/A N/A
Arterial and Intersection Complete Streets 606897 CTPS Study Route 203 (Morton Street in Boston) Conceptual 2012 $11,500,000 N/A N/A
Arterial and Intersection Complete Streets N/A CTPS Study Route 114 in Danvers Conceptual 2012 N/A   N/A
Arterial and Intersection Complete Streets N/A CTPS Study Reading - Main Street (Route 28) from South Street to Washington Street Conceptual 2013 N/A N/A N/A
Arterial and Intersection Complete Streets 602310 Danvers Reconstruction on Collins Street, from Sylvan Street to Centre & Holten Streets Pre-TIP N/A $7,300,000 0.9 N/A
Arterial and Intersection Complete Streets N/A Everett Beacham Street Conceptual N/A N/A   N/A
Arterial and Intersection Complete Streets 607652 Everett Reconstruction of Ferry Street, South Ferry Street and a Portion of Elm Street Pre-TIP 2013 $6,440,000 1.6 N/A
Arterial and Intersection Complete Streets 601359 Franklin Reconstruction of Pleasant Street, from Main Street to Chestnut Street Pre-TIP N/A $5,378,680 2.4 N/A
Arterial and Intersection Complete Streets 604377 Gloucester Washington Street And Railroad Avenue Pre-TIP N/A $4,600,000 1.3 N/A
Arterial and Intersection Complete Streets 607309 Hingham Reconstruction and Related Work on Derby Street from Pond Park Road to Cushing Street Pre-TIP N/A $3,840,661 0.8 N/A
Arterial and Intersection Complete Streets 606501 Holbrook Reconstruction of Union Street (Route 139), from Linfield Street to Centre Street/Water Street Pre-TIP N/A $2,471,136 0.9 N/A
Arterial and Intersection Complete Streets 606043 Hopkinton Signal & Intersection Improvements on Route 135 Pre-TIP N/A $7,235,377 0.8 N/A
Arterial and Intersection Complete Streets 601607 Hull Reconstruction of Atlantic Avenue and Related Work, from Nantasket Avenue to Cohasset Town Line Pre-TIP N/A $5,175,277 1.3 N/A
Arterial and Intersection Complete Streets 607409 Lexington Reconstruction on Massachusetts Avenue, from Marrett Road to Pleasant Street Pre-TIP 2008 $4,899,166 0.7 N/A
Arterial and Intersection Complete Streets 602077 Lynn Reconstruction on Route 129 (Lynnfield Street), from Great Woods Road to Wyoma Square Pre-TIP N/A $3,457,578 1.0 N/A
Arterial and Intersection Complete Streets 604810 Marlborough Route 85   TIP - 2016 N/A $5,144,104 1.1 X
Arterial and Intersection Complete Streets 607428 Milford Resurfacing & Intersection Improvements on Route 16 (Main Street), from Water Street  to the Hopedale T.L. Pre-TIP N/A $5,417,832 0.6 N/A
Arterial and Intersection Complete Streets 608045 Milford Rehabilitation on Route 16, from Route 109 to Beaver Street Pre-TIP N/A $2,700,000 0.6 N/A
Arterial and Intersection Complete Streets 604206 Milton Rehabilitation of Central Avenue, from Brook Road to Eliot Street Pre-TIP N/A $2,535,886 0.9 N/A
Arterial and Intersection Complete Streets 605034 Natick Reconstruction of Route 27 (North Main Street), from North Avenue to the Wayland Town Line Pre-TIP N/A $13,090,726 2.2 N/A
Arterial and Intersection Complete Streets 601704 Newton Reconstruction & Signal Improvements on Walnut Street, from Homer Street to Route 9 Pre-TIP N/A $4,648,360 1.3 N/A
Arterial and Intersection Complete Streets 600932 Newton Reconstruction on Route 30 (Commonwealth Avenue), from Weston Town Line to Auburn Street Pre-TIP N/A $2,208,000 1.2 N/A
Arterial and Intersection Complete Streets N/A CTPS Study Washington Street - Chestnut Street to Church Street Conceptual 2015 $15,000,000 2.0 N/A
Arterial and Intersection Complete Streets 605708 Sharon Signal and Intersection Improvements on South Main Street Pre-TIP N/A $2,984,345 0.8 N/A
Arterial and Intersection Complete Streets 604989 Southborough Route 30 TIP - 2017 N/A $6,345,000   N/A
Arterial and Intersection Complete Streets 602261 Walpole (MassDOT) Reconstruction of Route 1A (Main Street), from the Norwood Town Line to Route 27 Pre-TIP N/A $15,886,000 2.1 N/A
Arterial and Intersection Complete Streets 600671 Walpole (MassDOT) Reconstruction of Route 1A, from Common Street to the Norfolk Town Line Pre-TIP N/A $15,000,000 1.9 N/A
Arterial and Intersection Complete Streets 607777 Watertown Rehabilitation of Mount Auburn Street (Route 16) Pre-TIP N/A $12,233,125 1.8 N/A
Arterial and Intersection Complete Streets 608051 Wilmington Reconstruction on Route 38 (Main Street), from Route 62 to the Woburn City Line Pre-TIP N/A $9,108,000 2.1 N/A
Arterial and Intersection Complete Streets 607244 Winthrop Reconstruction and Related Work along Winthrop Street and Revere Street Corridor Pre-TIP N/A $5,040,000 1.8 N/A
Arterial and Intersection Complete Streets 607340 Wellesley Route 9 Corridor Reconstruction Pre-TIP   $16,462,400 4.8  
Arterial and Intersection Complete Streets 604745 Wrentham Reconstruction of Taunton Street (Route 152) Pre-TIP N/A $3,945,871 0.9 N/A
Arterial and Intersection Intersection Improvements 607748 Acton Intersection and Signal Improvements on State Route 2 and State Route 111 (Massachusetts Avenue) at Piper Road and Taylor Road Pre-TIP N/A $520,000 0.1 N/A
Arterial and Intersection Intersection Improvements N/A Ashland Intersection Improvements at Frankland Road and West Union Street (Route 135)  Conceptual N/A N/A 0.1 N/A
Arterial and Intersection Intersection Improvements 606117 Boston Traffic Signal Improvements at 11 Locations Pre-TIP N/A $3,036,200 0.6 N/A
Arterial and Intersection Intersection Improvements 605110 Brookline  Intersection and Signal Improvements at Route 9 & Village Square (Gateway East) TIP N/A $5,070,387   N/A
Arterial and Intersection Intersection Improvements N/A Winn Resort/ Cambridge Intersection Improvements at Land Boulevard/O'Brien Highway Conceptual   N/A    
Arterial and Intersection Intersection Improvements N/A CTPS Study Franklin/West Street, Braintree Intersection improvements  Conceptual 2013 N/A N/A X
Arterial and Intersection Intersection Improvements N/A CTPS Study Marshfield - Careswell Street (Route 139) and Webster Street Intersection Conceptual 2012 N/A N/A N/A
Arterial and Intersection Intersection Improvements N/A CTPS Study Milford - Route 140 at South Main Street Conceptual 2013   N/A N/A
Arterial and Intersection Intersection Improvements N/A CTPS Study Reconstruct Intersection at Southern Artery (Route 3A) at Sea Street/Coddington Street and at McGrath Highway/Field Street, Quincy Conceptual 2012 $750,000-1,0000,000 N/A N/A
Arterial and Intersection Intersection Improvements N/A CTPS Study Revere - Crescent Avenue and Winthrop Avenue Intersection  Conceptual 2012 N/A N/A N/A
Arterial and Intersection Intersection Improvements N/A CTPS Study Revere - Safety Improvements for Pedestrians at Park Avenue and Dale Street Intersection Conceptual 2013 N/A N/A N/A
Arterial and Intersection Intersection Improvements N/A CTPS Study Intersection Improvements Turnpike Road (Route 9) at Central Street/Oak Hill Road in Southborough Conceptual 2012 N/A N/A N/A
Arterial and Intersection Intersection Improvements 606002 Duxbury Signal Installation at Route 3 (NB & SB) Ramps & Route 3A (Tremont St) Pre-TIP N/A $2,400,000 0.5 N/A
Arterial and Intersection Intersection Improvements N/A Duxbury Intersection Improvements at Route 3A and Route 139 Conceptual N/A N/A 0.1 N/A
Arterial and Intersection Intersection Improvements 605168 Hingham Intersection Improvements at Route 3A/Summer Street Rotary Pre-TIP N/A $1,780,644 0.1 N/A
Arterial and Intersection Intersection Improvements 600518 Hingham (MassDOT) Intersection Improvements at Derby Street, Whiting Street (Route 53) and Gardner Street Pre-TIP 2003 $2,827,048 0.4 N/A
Arterial and Intersection Intersection Improvements 607255 Holbrook Intersection improvements and related work at Weymouth Street/Pine Street/Sycamore Street Pre-TIP 2011 $1,016,544   N/A
Arterial and Intersection Intersection Improvements N/A Holbrook Intersection Improvements at South Franklin Street and King Road Conceptual N/A N/A 0.1 N/A
Arterial and Intersection Intersection Improvements N/A Hudson Intersection Improvements at Lincoln Street and Cox Street and Packard Street Conceptual 2011 N/A 0.1 N/A
Arterial and Intersection Intersection Improvements N/A Hudson Upgrades to the Route 85 and Route 62 Rotary Conceptual N/A N/A 0.1 N/A
Arterial and Intersection Intersection Improvements N/A Lynn Intersection Improvements at Boston Street and Hamilton Street Conceptual N/A N/A 0.1 N/A
Arterial and Intersection Intersection Improvements N/A Lynn Intersection Improvements at Route 1A Lynnway and Blossom Street Conceptual N/A N/A 0.1 N/A
Arterial and Intersection Intersection Improvements N/A Lynn Intersection Improvements at Route 1A Lynnway and Market Street Conceptual N/A N/A 0.1 N/A
Arterial and Intersection Intersection Improvements 604231 Marlborough Intersection & Signal Improvements on Route 20 (East Main Street/Boston Post Road) at Concord Road Pre-TIP N/A $1,706,600 0.2 N/A
Arterial and Intersection Intersection Improvements N/A MassDOT Route 1 Intersection Signalization (Corridorwide) Conceptual N/A N/A N/A N/A
Arterial and Intersection Intersection Improvements N/A Medfield Intersection Improvements at Route 109 and Hartford Street Conceptual N/A N/A 0.1 N/A
Arterial and Intersection Intersection Improvements N/A Milton Intersection Improvements at Blue Hills Parkway and Brook Road Conceptual N/A N/A 0.1 N/A
Arterial and Intersection Intersection Improvements 605857 Norwood Intersection Improvements at Route 1 & University Avenue/Everett Street Pre-TIP 1999 $3,780,000 0.2 N/A
Arterial and Intersection Intersection Improvements 606130 Norwood Intersection Improvements at Route 1A & Upland Road/Washington Street & Prospect Street/Fulton Street Pre-TIP N/A $3,275,390 0.2 N/A
Arterial and Intersection Intersection Improvements N/A Peabody Signalize Intersection of Central Street and Tremont Street Conceptual N/A N/A 0.1 N/A
Arterial and Intersection Intersection Improvements N/A Randolph Route 28 (N. Main Street) and Liberty Street Intersections Conceptual N/A N/A 0.1 N/A
Arterial and Intersection Intersection Improvements N/A Randolph Route 28 (N. Main Street) and West Street Intersection Conceptual N/A N/A 0.1 N/A
Arterial and Intersection Intersection Improvements N/A Somerville Intersection Improvements at Cross Street and Pearl Street Conceptual N/A N/A 0.1 N/A
Arterial and Intersection Intersection Improvements N/A Somerville Intersection Improvements at Powderhouse Boulevard and Packard Avenue Conceptual N/A N/A 0.1 N/A
Arterial and Intersection Intersection Improvements N/A Winn Resort/ Somerville Intersection Improvements at (1) I-93 SB Off-Ramp/I-93 NB On-Ramp/Mystic Avenue (2) I-93 Off-Ramp/McGrath Highway (3) Mystic Avenue/McGrath Highway (4) Mystic Avenue/I-93 SB On-Ramp (5) Broadway/McGrath Highway (6) Mystic Avenue/I-93 NB On-Ramp Conceptual   N/A    
Arterial and Intersection Intersection Improvements 607249 Sudbury Intersection Improvements at Route 20 and Landham Road Pre-TIP 2010 $1,980,000 0.1 N/A
Arterial and Intersection Intersection Improvements N/A Sudbury Intersection Improvements at Route 20 and Horsepond Road Conceptual N/A N/A 0.1 N/A
Arterial and Intersection Intersection Improvements N/A Sudbury Intersection Improvements at Route 20 and Wayside Inn Road Conceptual N/A N/A 0.1 N/A
Arterial and Intersection Intersection Improvements N/A Waltham Intersection Improvements at Lexington Street and Glen Meadow Conceptual N/A N/A 0.1 N/A
Arterial and Intersection Intersection Improvements N/A Waltham Intersection Improvements at Moody Street and Maple Street and High Street Conceptual N/A N/A 0.2 N/A
Arterial and Intersection Intersection Improvements N/A Waltham Intersection Improvements at Totten Pond Road and Lexington Street and Bacon Street Conceptual N/A N/A 0.5 N/A
Arterial and Intersection Intersection Improvements N/A Waltham Intersection Improvements at Trapelo Road and Forest Street Conceptual N/A N/A 0.1 N/A
Arterial and Intersection Intersection Improvements 601579 Wayland Signal and intersection improvements at Route 27 (Main Street) and Route 30 (Commonwealth Road) TIP 2008 $2,479,451 N/A N/A
Arterial and Intersection Intersection Improvements 605721 Weymouth Intersection Improvements at Middle Street, Libbey Industrial Parkway and Tara Drive Pre-TIP 2003 $937,326 0.1 N/A
Arterial and Intersection Intersection Improvements N/A Wilmington Intersection Improvements at Salem Street (Route 62) and Middlesex Avenue and High Street Conceptual N/A N/A 0.1 N/A
Arterial and Intersection Intersection Improvements 608067 Woburn Intersection Reconstruction at Route 3 and Bedford Road and South Bedford Street Pre-TIP N/A $1,440,000 N/A N/A
Arterial and Intersection N/A N/A Arlington Reconstruct Massachusetts Avenue (Phase 2), from Pond Lane to Water Street Conceptual N/A N/A 0.3 N/A
Arterial and Intersection N/A N/A Bedford Reconstruct South Road, from Washington Street (Elm Brook) to Summer Street Conceptual N/A N/A 0.9 N/A
Arterial and Intersection N/A N/A Bedford Reconstruct Wiggins Avenue Conceptual N/A N/A 0.9 N/A
Arterial and Intersection N/A N/A Bellingham Reconstruct Maple Street, from Route 126 to Route 140 Conceptual N/A N/A 2.8 N/A
Arterial and Intersection N/A N/A Bellingham Reconstruct Pulaski Boulevard (Route 126), from South Main Street to the Blackstone Town Line Conceptual N/A N/A 0.7 N/A
Arterial and Intersection N/A N/A Bellingham Reconstruct Route 126 (South Main Street), from Pulaski Boulevard to Route 140 Conceptual N/A N/A 4.6 N/A
Arterial and Intersection N/A N/A Bellingham Reconstruct Hartford Avenue, from North Main Street (Route 126) to the Mendon Town Line Conceptual N/A N/A 1.6 N/A
Arterial and Intersection N/A N/A Bolton Reconstruct Route 85 (Hudson Road) Conceptual N/A N/A 1.6 N/A
Arterial and Intersection N/A 53001 Boston Northern Avenue Connector Roads (Phase 1) Conceptual N/A N/A N/A N/A
Arterial and Intersection N/A N/A Boston South Huntington Avenue Conceptual N/A N/A 0.2 N/A
Arterial and Intersection N/A N/A Boston Huntington Avenue Conceptual N/A N/A 1.3 N/A
Arterial and Intersection N/A N/A Boston Huntington Avenue Conceptual N/A N/A 0.3 N/A
Arterial and Intersection Intersection Improvements N/A Winn Resort/ Boston Intersection Improvements at (1) Alford Street/Main Street/Sever Street/Cambridge Street (2) Cambridge Street/I-93 NB Off-Ramp (3) Dexter Street/Alford Street (4) Rutherford Avenue/Route 1 Conceptual   N/A    
Arterial and Intersection N/A N/A Burlington Route 62 (Wilmington Road) Conceptual N/A N/A 1.6 N/A
Arterial and Intersection N/A N/A Burlington Wheeler Road Conceptual N/A N/A 0.7 N/A
Arterial and Intersection N/A N/A Burlington South Bedford Street Conceptual N/A N/A 0.6 N/A
Arterial and Intersection N/A N/A Chelsea Reconstruct Spruce Street, from Everett Avenue and Sixth Street Conceptual N/A N/A 0.2 N/A
Arterial and Intersection N/A N/A Chelsea Reconstruct Broadway, from City Hall Ave to the Revere City Line Conceptual N/A $10,000,000 1.0 N/A
Arterial and Intersection N/A N/A Chelsea Spruce Street/Second Street/Carter Street Improvements Conceptual N/A $8,000,000 1.2 N/A
Arterial and Intersection Intersection Improvements N/A Winn Resort/ Chelsea Intersection Improvements at (1) Route 16/Washington Avenue (2) Route 16/Everett Avenue (3) Route 16/Webster Avenue Conceptual   N/A    
Arterial and Intersection N/A N/A Concord Reconstruction of Route 117 (Fitchburg Turnpike) Conceptual N/A N/A 1.0 N/A
Arterial and Intersection N/A N/A Concord Reconstruction of Route 62 (Main St), Phase 3 Conceptual N/A N/A 0.8 N/A
Arterial and Intersection N/A N/A Concord Cambridge Turnpike Conceptual N/A N/A N/A N/A
Arterial and Intersection N/A N/A CTPS Study Route 138 Corridor (Canton, Milton, Stoughton) Conceptual N/A N/A N/A N/A
Arterial and Intersection N/A N/A Danvers Improve Railroad Crossing at the Intersection of Holten Street and Burroughs Street Conceptual N/A N/A 0.1 N/A
Arterial and Intersection N/A N/A Everett Reconstruction of Main Street, from Sweetser Circle to the Malden City Line Conceptual N/A N/A 0.9 N/A
Arterial and Intersection Intersection Improvements N/A Winn Resort/ Everett Intersection Improvements at (1) Revere Beach Parkway/Mystic View Road/Santilli Highway/Route 99 Connector Improvements (2) Route 16/Broadway/Main Street (3) Broadway/Beacham Street (4) Broadway/Horizon Way (5) Broadway/Lynde Street (6) Broadway/Thorndike Street (7) Bow Street/Mystic Street (8) Bow Street/Lynde Street (9) Bow Street/Thorndike Street (10) Beacham Street/Robin Street (11) Broadway/Bowdoin Street (12) Broadway/Norwood Street/Chelsea Street (13) Ferry Street/Broadway Conceptual   N/A    
Arterial and Intersection N/A N/A Framingham Reconstruct Route 126 (Hollis Street), from Irving Street to the Ashland town line Conceptual N/A N/A 1.2 N/A
Arterial and Intersection N/A N/A Framingham Reconstruction of Route 126, from Route 9 to Lincoln Street Conceptual 2000 N/A 1.2 N/A
Arterial and Intersection N/A N/A Framingham Route 9/Route 126 Interchange Conceptual N/A N/A N/A N/A
Arterial and Intersection N/A N/A Franklin Reconstruct Chestnut Street, from Route 140 to Pleasant Street Conceptual N/A N/A 2.1 N/A
Arterial and Intersection N/A N/A Franklin Reconstruct Summer Street, from Route 140 to Wrentham Town Line Conceptual N/A N/A 2.5 N/A
Arterial and Intersection N/A 607774 Franklin Resurfacing and Intersection Improvements on Route 140, from Beaver Street to I-495 Ramps Conceptual N/A $4,200,000 N/A N/A
Arterial and Intersection N/A N/A Franklin Reconstruct Washington Street, from Bellingham Town Line to Prospect Street Conceptual N/A N/A 1.7 N/A
Arterial and Intersection N/A N/A Gloucester Gloucester Rotary Conceptual N/A N/A N/A N/A
Arterial and Intersection N/A N/A Hudson South Street Conceptual N/A N/A 0.3 N/A
Arterial and Intersection N/A N/A Hull Manomet Avenue Conceptual N/A N/A 1.0 N/A
Arterial and Intersection N/A N/A Hull Samoset Avenue Conceptual N/A N/A 1.1 N/A
Arterial and Intersection N/A 605743 Ipswich Resurfacing & Related Work on Central & South Main Streets Pre-TIP N/A $2,624,154 0.6 N/A
Arterial and Intersection N/A N/A Lexington Waltham St Conceptual N/A N/A N/A N/A
Arterial and Intersection N/A N/A Lexington Hayden Ave Conceptual N/A N/A 1.0 N/A
Arterial and Intersection N/A N/A Littleton Harvard Street Conceptual N/A N/A 1.6 N/A
Arterial and Intersection N/A N/A Lynn Broad Street/Lewis Street/Route 129 Conceptual N/A N/A 6.7 N/A
Arterial and Intersection N/A N/A Lynn Route 129 (Boston St./Washington St.) Conceptual N/A N/A 0.1 N/A
Arterial and Intersection N/A N/A Lynn Route 1A Lynn (GE Bridge Nahant Rotary) Conceptual N/A N/A 2.4 N/A
Arterial and Intersection N/A N/A Marlborough Route 85 North (Bolton Street) Conceptual 2001 N/A 2.0 N/A
Arterial and Intersection N/A 604811 Marlborough Reconstruction of Route 20 (East Main Street), from Main Street Easterly to Lincoln Street Pre-TIP N/A $2,252,930 0.3 N/A
Arterial and Intersection N/A N/A Medfield South Street Conceptual N/A N/A 1.3 N/A
Arterial and Intersection N/A N/A Medford Medford Square Phase 2 Improvements Conceptual N/A N/A 0.1 N/A
Arterial and Intersection Intersection Improvements N/A Winn Resort/ Medford Intersection Improvements at (1) Mystic Valley Parkway/Fellsway/Middlesex Avenue (2) Mystic Valley Parkway/Route 16 Connector (3) Mystic Valley Parkway/Mystic Avenue Conceptual   N/A    
Arterial and Intersection N/A N/A Medway Route 109 (Milford Street) Conceptual N/A N/A 2.4 N/A
Arterial and Intersection N/A N/A Melrose Reconstruct Lebanon Street, from Main Street to the Malden City Line Conceptual N/A N/A 1.0 N/A
Arterial and Intersection N/A N/A Melrose Reconstruct Swains Pond Avenue, from Maple Terrace to the Malden City Line Conceptual N/A N/A 0.1 N/A
Arterial and Intersection N/A N/A Melrose Reconstruct Swains Pond Avenue, from Grove Street to Wheeler Avenue Conceptual N/A N/A 0.3 N/A
Arterial and Intersection N/A N/A Melrose Wyoming Avenue Conceptual N/A N/A 0.7 N/A
Arterial and Intersection N/A N/A MPO Identified Need Route 1A Salem to Revere Conceptual N/A N/A   N/A
Arterial and Intersection N/A N/A MPO Identified Need Route 107 Western Ave at Conceptual N/A N/A   N/A
Arterial and Intersection N/A N/A MPO Identified Need Route 114 Peabody, Salem Conceptual N/A N/A   N/A
Arterial and Intersection N/A N/A MPO Identified Need Route 16 Fresh Pond Parkway and Alewife Brook Parkway Conceptual N/A N/A N/A N/A
Arterial and Intersection N/A N/A MPO Identified Need Memorial Drive Cambridge Conceptual N/A N/A N/A N/A
Arterial and Intersection N/A N/A MPO Identified Need Route 3A Marshfield to Quincy Conceptual N/A N/A N/A N/A
Arterial and Intersection N/A N/A MPO Identified Need Route 28 Milton to Randolph Conceptual N/A N/A N/A N/A
Arterial and Intersection N/A N/A MPO Identified Need Route 138 Milton Conceptual N/A N/A N/A N/A
Arterial and Intersection N/A N/A MPO Identified Need Route 9 Southborough to Newton Conceptual N/A N/A N/A N/A
Arterial and Intersection N/A N/A MPO Identified Need Route 16 Holliston to Newton Conceptual N/A N/A N/A N/A
Arterial and Intersection N/A N/A MPO Identified Need Route 20 Weston Conceptual N/A N/A N/A N/A
Arterial and Intersection N/A N/A MPO Identified Need Route 60 Improvements Arlington Conceptual N/A N/A N/A N/A
Arterial and Intersection N/A N/A MPO Identified Need Route 30 Framingham Conceptual N/A N/A N/A N/A
Arterial and Intersection N/A N/A MPO Identified Need Route 99 Everett Conceptual N/A N/A N/A N/A
Arterial and Intersection N/A N/A MPO Identified Need Route 129 Wilmington to Reading Conceptual N/A N/A N/A N/A
Arterial and Intersection N/A N/A MPO Identified Need Route 135 Wellesley to Natick Conceptual N/A N/A N/A N/A
Arterial and Intersection N/A N/A Needham Highland Avenue Conceptual N/A N/A 1.3 N/A
Arterial and Intersection N/A N/A Newton Washington St., Phase 2 (Perkins Street to Commonwealth Avenue) Conceptual N/A N/A 0.5 N/A
Arterial and Intersection N/A N/A North Reading Park Street Improvements Conceptual N/A N/A 0.7 N/A
Arterial and Intersection N/A N/A Randolph Reconstruction of Oak Street, from Devine Road to North Street  Conceptual N/A N/A 1.2 N/A
Arterial and Intersection N/A N/A Reading Haverhill Street Reconstruction Conceptual N/A N/A 2.5 N/A
Arterial and Intersection N/A N/A Reading Streetscape Improvements on Haven & High Streets Conceptual N/A N/A 0.7 N/A
Arterial and Intersection Intersection Improvements N/A Winn Resort/ Revere Intersection Improvements at Route 16/Route 1A/Route 60  Conceptual   N/A    
Arterial and Intersection N/A N/A Rockland VFW Drive, Weymouth Street, Hingham Street Conceptual N/A N/A 4.3 N/A
Arterial and Intersection N/A N/A Somerville Broadway East Somerville CMAQ Conceptual N/A N/A 0.1 N/A
Arterial and Intersection N/A N/A Southborough Cordaville Road/Route 85 Rehabilitation Conceptual N/A N/A 2.6 N/A
Arterial and Intersection N/A N/A Sudbury Old Sudbury Road (Route 27) Conceptual N/A N/A 0.1 N/A
Arterial and Intersection N/A N/A Walpole Walpole Central Business District Conceptual N/A N/A N/A N/A
Arterial and Intersection N/A N/A Walpole Elm St Improvements Conceptual N/A N/A 1.5 N/A
Arterial and Intersection N/A N/A Waltham Wyman Street Conceptual N/A N/A 1.0 N/A
Arterial and Intersection N/A N/A Woburn Route 38 (Main St.) Traffic Lights Conceptual N/A N/A 0.9 N/A
Arterial and Intersection N/A N/A   Air Force Road Rehabilitation Conceptual N/A N/A 0.4 N/A
Arterial and Intersection N/A N/A   Main St Reconstruction and Pedestrian Improvement Conceptual N/A N/A 5.2 N/A
Bicycle and Pedestrian Bike Network 607738 Bedford Minuteman Bikeway Extension, from Loomis Street to the Concord T.L. Pre-TIP N/A $4,006,200 2.0 N/A
Bicycle and Pedestrian Bike Network N/A Berlin, Hudson, Sudbury, Waltham, Wayland, Weston Mass Central Trail "Wayside Trail" from Waltham to Berlin Conceptual 1997 N/A 24.4 N/A
Bicycle and Pedestrian Bike Network N/A Boston Linking the Corridors Conceptual N/A N/A 2.0 N/A
Bicycle and Pedestrian Bike Network 607888 Boston Multi-use Path Construction on New Fenway Pre-TIP N/A $1,702,618 0.4 N/A
Bicycle and Pedestrian Bike Network N/A Boxborough Route 111 Trail Conceptual N/A N/A 0.1 N/A
Bicycle and Pedestrian Bike Network 606316 Brookline  Pedestrian bridge rehabilitation over MBTA off Carlton Street TIP N/A $1,776,396   N/A
Bicycle and Pedestrian Bike Network N/A Brookline  Emerald Necklace Bicycle and Pedestrian Crossings at Route 9 Conceptual N/A $1,680,000 0.2 N/A
Bicycle and Pedestrian Bike Network N/A Lexington West Lexington Greenway Conceptual N/A N/A 4.4 N/A
Bicycle and Pedestrian Bike Network N/A Lynn, Malden, Revere & Saugus Bike to the Sea (Northern Strand) Conceptual 1996 N/A 8.4 N/A
Bicycle and Pedestrian Bike Network N/A Medford Mystic River Linear Park Conceptual N/A N/A 1.6 N/A
Bicycle and Pedestrian Bike Network 607732 Natick Cochituate Rail Trail, Phase Two Pre-TIP 2000 $5,417,832 2.4 N/A
Bicycle and Pedestrian Bike Network N/A Peabody and Salem Riverwalk/Greenway, Peabody Square to Salem Train Depot  Conceptual N/A N/A N/A N/A
Bicycle and Pedestrian Bike Network N/A Salem Canal Street Bikeway Conceptual N/A $2,368,000 1.5 N/A
Bicycle and Pedestrian Bike Network N/A Scituate Scituate Greenway Conceptual N/A N/A 2.6 N/A
Bicycle and Pedestrian Bike Network N/A Scituate Pathway for all of Scituate and linking Commuter Rail Conceptual N/A N/A 17.1 N/A
Bicycle and Pedestrian Bike Network N/A Sudbury Bruce Freeman Rail Trail, Phase 2D Conceptual N/A N/A 4.4 N/A
Bicycle and Pedestrian Bike Network N/A Sudbury Bruce Freeman Rail Trail, Phase 2E Conceptual N/A N/A 1.3 N/A
Bicycle and Pedestrian Bike Network N/A Woburn Woburn Loop Bikeway Project Conceptual N/A N/A 0.8 N/A
Bicycle and Pedestrian Clean Air and Mobility N/A Inner Core Hubway Expansion Conceptual N/A N/A N/A N/A
Bicycle and Pedestrian Pedestrian Connections 604993 Cambridge Innovation Boulevard Streetscape & Pedestrian Improvements, Between Main Street & Binney Street (Phase I) Pre-TIP N/A $1,500,000 0.3 N/A
Bicycle and Pedestrian Pedestrian Connections 607901 Dedham Pedestrian Improvements along Elm Street & Rustcraft Road Corridors Pre-TIP N/A $3,312,000 N/A N/A
Bicycle and Pedestrian Pedestrian Connections 607899 Dedham Pedestrian Improvements along Bussey Street Pre-TIP N/A $2,592,000 1.5 N/A
Bicycle and Pedestrian Pedestrian Connections 608006 Framingham Pedestrian Hybrid Beacon Installation at Route 9 and Maynard Road Pre-TIP N/A $886,228 N/A N/A
Enhancement N/A N/A Boston Harbor Islands National Park Access Conceptual N/A N/A N/A N/A
Enhancement N/A N/A Boston Harbor Islands National Park and Long Island Pier Reconstruction Conceptual N/A N/A 0.3 N/A
Enhancement N/A N/A Boston Long Island Pier Reconstruction Conceptual N/A N/A 0.1 N/A
Enhancement N/A N/A Boston Long Island Pier Conceptual N/A N/A 0.2 N/A
Enhancement N/A N/A Medford Medford Square Parking Conceptual N/A N/A 0.4 N/A
Enhancement N/A N/A Medford Medford Square Water Taxi Landing and Related Park Improvements Conceptual N/A N/A N/A N/A
Freight Arterial and Intersection N/A Winn Resort/ Everett Lower Broadway Truck Route Conceptual   N/A    
Major Highway Interchange  604862 Bellingham Ramp Construction and Relocation, I-495 at Route 126 Pre-TIP N/A $15,000,000 0.6 N/A
Major Highway Interchange  N/A MassDOT Coney Street Interchange with Route 95 Conceptual N/A N/A 0.6 N/A
Major Highway Interchange  N/A Newton I-90/Interchange 17 Conceptual N/A N/A N/A N/A
Major Highway Interchange  607940 Newton Improvements of Route 128/I-95 & Grove Street Pre-TIP N/A $10,000,055 N/A N/A
Major Highway Interchange  N/A Rockland Route 3/Union St. Conceptual N/A N/A N/A N/A
Major Highway Interchange  N/A Weston Route 30/I-90 Interchange  Conceptual N/A N/A N/A N/A
Major Highway Interchange  603739 Wrentham Construction of I-495/Route 1A Ramps Pre-TIP N/A $4,002,192 0.1 N/A