Appendix B—Universe of Projects and Programs
B.1 Introduction
One of the primary outcomes of the LRTP process is to create a list of major capital expansion projects and a set of programs for implementation during the next-25 years. Thus, the MPO created a Universe of Projects and Programs list to identify all potential projects and programs. This appendix contains that list for both highway and transit projects.
Each project is associated with one of the six established MPO programs:
The MPO used the “Universe” list to develop a draft list of projects and programs for public review and the final list to include in this LRTP. The Universe of Projects and Programs includes the following projects that:
The projects in the Universe list are presented in three categories and sorted by program type. Table B.1 lists all major infrastructure projects that were included in the last LRTP, Paths to a Sustainable Region. Table B.2 lists all projects that add capacity to the transportation system or that cost more than $20 million. These projects must be listed in the LRTP before they can be programmed for construction in the TIP. Table B.3 lists all projects that do not add capacity to the transportation system and cost less than $20 million. These projects can be programmed directly in the TIP without being mentioned in the LRTP. They generally fall into one of the programs that are included in the LRTP and are listed above.
Information in each of the tables includes:
TABLE B.1
Universe of Projects and Programs List
Project Type | Investment Program | PROJIS | Proponent(s) | Project Name | TIP/ LRTP Status |
CTPS Study | Estimated Cost | Project Length | 2015-2018 TIP |
---|---|---|---|---|---|---|---|---|---|
Currently Listed in Paths to a Sustainable Region | |||||||||
Arterial and Intersection | Bottleneck | 5399 | Salem | Reconstruction of Bridge Street, from Flint Street to Washington Street | LRTP 2016-20 |
N/A | $16,613,000 | 0.4 | N/A |
Arterial and Intersection | Bottleneck | 601630 | Weymouth | Route 18 Widening | LRTP 2016-20 |
N/A | $59,000,000 | 4.0 | X |
Arterial and Intersection | Bottleneck | 604935 | Woburn | Montvale Avenue Widening | LRTP 2016-20 |
N/A | $4,225,256 | X | |
Arterial and Intersection | Major Infrastructure | 29492 | Bedford | Middlesex Turnpike Phase III | LRTP 2016-20 |
N/A | $26,935,171 | X | |
Arterial and Intersection | Major Infrastructure | 606226 | Boston | Reconstruction of Rutherford Avenue, from City Square to Sullivan Square | LRTP 2016-20 |
N/A | $109,967,000 | 2.9 | N/A |
Arterial and Intersection | Major Infrastructure | 606109 | Framingham | Intersection Improvements at Route 126/135/MBTA & CSX Railroad | LRTP 2026-30 |
N/A | $115,000,000 | 0.2 | N/A |
Arterial and Intersection | Major Infrastructure | 606635 | Newton, Needham (MassDOT) | Reconstruction of Highland Avenue, Needham Street & Charles River Bridge, from Webster Street to Route 9 | LRTP 2021-25 |
N/A | $18,000,000 | 3.0 | N/A |
Bicycle and Pedestrian | Bike Network | N/A | Stow, Hudson | Assabet River Rail Trail | LRTP 2016-20 |
N/A | $16,285,600 | 3.6 | N/A |
Bridge | 604996 | Woburn | Bridge Replacement, New Boston Street over MBTA | LRTP 2016-20 |
N/A | $8,297,198 | 0.3 | N/A | |
Major Highway | Bottleneck | N/A | Braintree (MassDOT) | I-93/Route 3 Interchange (Braintree Split) | LRTP 2031-35 |
2006 | $53,289,000 | N/A | N/A |
Major Highway | Major Infrastructure | 605012 | Malden, Revere, Saugus (MassDOT) | Reconstruction & Widening on Route 1, from Route 60 to Route 99 | LRTP 2031-35 |
N/A | $236,078,000 | 2.1 | N/A |
Major Highway | Major Infrastructure | 605605 (608097; 608096) | Reading, Stoneham, Wakefield, Woburn (MassDOT) | Interchange Improvements to I-93/I-95 ((1) Washington Street Bridge over I-95 (2) Improvements along Route 128/I-95 MB Add-a-Lane/Exit 38/Route 28 Re-configuration (3) Modifications to Interchange 38 in Reading, Stoneham and Wakefield) |
LRTP 2026-30 |
N/A | $339,100,000 | 16.5 | N/A |
Major Highway | Major Infrastructure | 87790 | Canton, Dedham, Norwood (MassDOT) | Interchange Improvements at I-95/I-93 (Non-Federal Funds) | LRTP 2016-2020 | $177,414,000 | X | ||
Major Highway | Major Infrastructure | 606146 | Canton, Norwood, Westwood (MassDOT) | Ramp Construction on I-95 (NB) and Improvements on Dedham Street/Canton Street (Non-Federal Funds) | LRTP 2013-2015 | $51,000,000 | X | ||
Transit | Transit Capacity | N/A | MPO | Green Line Extension Phase II from College Avenue to Mystic Valley Parkway/Route 16 | LRTP 2016-2025 | N/A | $190,000,000 | X | |
Project Type | Investment Program | PROJIS | Proponent(s) | Project Name | TIP/ LRTP Status |
CTPS Study | Estimated Cost | Project Length | 2015-2018 TIP |
Projects that add capacity to the system/Cost more than $20 million | |||||||||
Arterial and Intersection | Bottleneck | N/A | Brookline, Newton | Route 9 Capacity Improvements | Conceptual | N/A | N/A | N/A | N/A |
Arterial and Intersection | Bottleneck | 604619 | Lexington | Route 4/225 (Bedford Street) and Hartwell Avenue | Pre-TIP | N/A | $23,221,000 | N/A | N/A |
Arterial and Intersection | Interchange | N/A | Revere (MassDOT) | Mahoney Circle Grade Separation | Conceptual | N/A | $60,000,000 | N/A | N/A |
Arterial and Intersection | Interchange | N/A | Revere (MassDOT) | Route 1/Route 16 Connector | Conceptual | N/A | N/A | N/A | N/A |
Arterial and Intersection | Interchange | N/A | Revere (MassDOT) | Route 1A/Route 16 Connector | Conceptual | N/A | N/A | N/A | N/A |
Arterial and Intersection | Intersection Improvements | N/A | MassPort, MassDOT, MBTA, Boston | South Boston Transportation Study - Cypher Street extension from D Street to E Street and reconstruct and extend E Street from Cypher Street to Summer Street | Conceptual | 2015 | $9,700,000 | N/A | |
Arterial and Intersection | Intersection Improvements | N/A | MassPort, MassDOT, MBTA, Boston | South Boston Transportation Study - New Summer Street north/south connector to Northern Avenue/Haul Road/Drydock Avenue | Conceptual | 2015 | N/A | N/A | |
Arterial and Intersection | Intersection Improvements | N/A | MassDOT | Route 1 Intersection Signalization (Corridorwide) | Conceptual | N/A | N/A | N/A | N/A |
Arterial and Intersection | Major Infrastructure | 602091 | Concord | Improvements & Upgrades to Concord Rotary (Routes 2/2A/119) | Pre-TIP | 1995 | $98,900,000 | N/A | N/A |
Arterial and Intersection | Major Infrastructure | 607981 | Somerville (MassDOT) | McGrath Boulevard Project | Pre-TIP | N/A | $65,000,000 | N/A | N/A |
Arterial and Intersection | Major Infrastructure | N/A | CTPS Study | Route 30 (Cochituate Road) in Framingham and Natick | Conceptual | 2013 | N/A | N/A | N/A |
Arterial and Intersection | N/A | Boston | Boardman Street at Route 1A | Conceptual | 1990 | $13,686,000 | 0.1 | N/A | |
Arterial and Intersection | N/A | Milford | Veteran's Memorial Drive/Alternate Route | Conceptual | N/A | N/A | N/A | N/A | |
Arterial and Intersection | N/A | Rockland | Completion of the S. Weymouth Naval Air Station - Widening Reservoir Park Drive and Hingham Street | Conceptual | N/A | N/A | N/A | N/A | |
Freight | Freight Movement | N/A | Boston | Charlestown Haul Road | Conceptual | N/A | N/A | N/A | N/A |
Freight | Freight Movement | N/A | Boston | Conley Rail Service | Conceptual | N/A | N/A | N/A | N/A |
Major Highway | Bottleneck | N/A | CTPS Study | Extend I-93 High-Occupancy Vehicle Lane into the City (Somerville) | Conceptual | N/A | N/A | N/A | N/A |
Major Highway | Bottleneck | N/A | CTPS Study | I-495 Capacity Improvements (Littleton to Wrentham) | Conceptual | N/A | N/A | N/A | N/A |
Major Highway | Bottleneck | N/A | CTPS Study | I-93 Capacity Improvements (Boston to Braintree) | Conceptual | N/A | N/A | N/A | N/A |
Major Highway | Bottleneck | N/A | CTPS Study | I-95 Capacity Improvements (Canton to Foxborough) | Conceptual | N/A | N/A | N/A | N/A |
Major Highway | Bottleneck | N/A | CTPS Study | Route 128 Capacity Improvements (Lynnfield to Peabody) | Conceptual | N/A | N/A | N/A | N/A |
Major Highway | Bottleneck | N/A | CTPS Study | Route 128 HOV (Wellesley to Woburn) | Conceptual | N/A | N/A | N/A | N/A |
Major Highway | Bottleneck | N/A | CTPS Study | Route 2 Capacity Improvements (Acton to Lexington) | Conceptual | N/A | N/A | N/A | N/A |
Major Highway | Bottleneck | N/A | CTPS Study | Route 24 Capacity Improvements (Taunton to Randolph) | Conceptual | N/A | N/A | N/A | N/A |
Major Highway | Bottleneck | N/A | CTPS Study | Interstate 93 Capacity Improvements (Somerville to Woburn) | Conceptual | N/A | N/A | N/A | N/A |
Major Highway | Bottleneck | 604638 | Danvers, Peabody (MassDOT) | Mainline Improvements on Route 128 (Phase II) | Pre-TIP | N/A | $23,776,000 | 1.7 | N/A |
Bridge | Interchange | 605313 | Natick | Bridge Replacement, Route 27 (North Main Street) over Route 9 (Worcester Street) and Interchange Improvements | Pre-TIP | N/A | $25,793,370 | N/A | N/A |
Major Highway | Interchange | 607977 | Hopkinton, Westborough (MassDOT) | Reconstruction of I-90/I-495 Interchange | Pre-TIP | N/A | $220,000,000 | 2.0 | N/A |
Major Highway | Interchange | N/A | Newton | New Route 128 Ramp to Riverside Station | Conceptual | N/A | N/A | N/A | N/A |
Major Highway | Interchange | N/A | Wilmington | I-93/Route 125/Ballardvale Road | Conceptual | N/A | N/A | N/A | N/A |
Major Highway | Interchange | 607727 | Beverly | Interchange Reconstruction at Route 128/Exit 19 at Brimbal Avenue (Phase II) | Pre-TIP | N/A | $23,000,000 | N/A | N/A |
Major Highway | Interchange | N/A | Boston | Massachusetts Turnpike Back Bay Exit | Conceptual | N/A | N/A | N/A | N/A |
Major Highway | Interchange | 603345 | Hudson, Marlborough (MassDOT) | Reconstruction on Routes I-290 and 495 and Bridge Replacement | Pre-TIP | N/A | $100,000,000 | 2.0 | N/A |
Major Highway | Interchange | N/A | Randolph | I-93/Route 24 Interchange | Conceptual | N/A | N/A | N/A | N/A |
Major Highway | Interchange | 601513 | Saugus (MassDOT) | Interchange Reconstruction at Walnut Street & Route 1 (Phase II) | Pre-TIP | N/A | $18,612,130 | 1.2 | N/A |
Major Highway | Interchange | 607701 | Southborough, Westborough (MassDOT) | Improvements on Route 9 at I-495 Interchange, from Computer Drive/Research Drive to Route 9/Crystal Road Intersection | Pre-TIP | N/A | $25,000,000 | 4.4 | N/A |
Major Highway | Interchange | Boston (MassDOT) | Allston Interstate 90 Massachusetts Turnpike Interchange Improvement Program | Pre-TIP | $260,000,000 | ||||
Major Highway | Bridge | Boston | South Boston Transportation Study - Northern Avenue Bridge reconstruction | Conceptual | N/A | ||||
Major Highway | Major Infrastructure | 608128 | MassDOT | Boston-Southeast Expressway Modification (Southampton Interchange) | Conceptual | N/A | $143,750,000 | N/A | |
Major Highway | Major Infrastructure | N/A | MassDOT | Route 3 South Express Toll Lanes | Conceptual | N/A | $800,000,000 | N/A | |
Transit | Transit Capacity | N/A | CTPS Study | Build New Busways to Alewife Station (Cambridge) | Conceptual | N/A | N/A | N/A | N/A |
Transit | Transit Capacity | N/A | CTPS Study | Construction of new commuter rail stations in Milford and/or Hopedale on the Franklin Line | Conceptual | 2012 | $126-150 million (capital) $3.1-4.3 (operating) | N/A | N/A |
Transit | Transit Capacity | N/A | MassDOT/MBTA | South Station Expansion Project | Conceptual | N/A | N/A | N/A | N/A |
Transit | Transit Capacity | N/A | MassDOT/MBTA | New Worcester Line Commuter Rail Station in Allston (West Station) | Conceptual | N/A | $200,000,000 | N/A | N/A |
Transit | Transit Capacity | N/A | MassPort, MassDOT, MBTA | T Under D (South Boston) | Conceptual | N/A | N/A | N/A | N/A |
Transit | Transit Capacity | N/A | MassPort, MassDOT, MBTA, Boston | South Boston Transportation Study - Extension of Silver Line to Dudley Square | Conceptual | 2015 | N/A | N/A | |
Transit | Transit Capacity | N/A | Private - New Balance | Brighton Landing Commuter Rail Station | Pre-TIP | $25,000,000 | N/A | ||
Transit | Transit Capacity | N/A | MassDOT/MBTA | Maintenance Facilities | Conceptual | N/A | N/A | N/A | N/A |
Transit | Transit Capacity | N/A | MassDOT/MBTA | Orient Heights Maintenance Facility Renovation Phase III | Conceptual | N/A | N/A | N/A | N/A |
Transit | Transit Capacity | N/A | Waltham | Fitchburg Commuter Rail - Multi-Modal Transit Center | N/A | N/A | N/A | N/A | |
Transit | Transit Extension | N/A | MassDOT/MBTA | Urban Rail Service (DMU or EMU) "A" - Riverside to South Station via Worcester CR ROW | Conceptual | N/A | N/A | N/A | N/A |
Transit | Transit Extension | N/A | MassDOT/MBTA | Urban Rail Service (DMU or EMU) "B" - Allston to North Station via Grand Junction ROW thru Cambridge | Conceptual | N/A | N/A | N/A | N/A |
Transit | Transit Extension | N/A | MassDOT/MBTA | Urban Rail Service (DMU or EMU) "C" - Back Bay to the Convention Center (BCEC) via Worcester CR ROW | Conceptual | N/A | N/A | N/A | N/A |
Transit | Transit Extension | N/A | MassDOT/MBTA | Urban Rail Service (DMU or EMU) "D" - Route 128 Station to South Station via Fairmount CR ROW | Conceptual | N/A | N/A | N/A | N/A |
Transit | Transit Extension | N/A | MassDOT/MBTA | Urban Rail Service (DMU or EMU) "E" - Lynn to North Station via Newburyport/Rockport CR ROW | Conceptual | N/A | N/A | N/A | N/A |
Transit | Transit Extension | N/A | MassDOT/MBTA | Urban Rail Service (DMU or EMU) "F" - Anderson/Woburn to North Station via Lowell CR ROW | Conceptual | N/A | N/A | N/A | N/A |
Transit | Transit Extension | N/A | MassDOT/MBTA | Operate Weekday Commuter Rail Service to Foxboro | Conceptual | N/A | N/A | N/A | N/A |
Transit | Transit Extension | N/A | MVPC | Bus on Shoulder | Conceptual | 2014 | N/A | N/A | |
Transit | Transit Extension | N/A | Public Input | Improved Cross-Town or Circumferential Transit | Conceptual | N/A | N/A | N/A | N/A |
Transit | Transit Extension | N/A | Public Input | Improved connections between North and South Station | Conceptual | N/A | N/A | N/A | N/A |
Transit | Transit Modernization | N/A | Natick | Natick Center MBTA Commuter Rail Station Upgrades | Conceptual | N/A | N/A | N/A | N/A |
Transit | Transit Modernization | N/A | Quincy | Quincy Center Multimodal MBTA Station | Conceptual | N/A | N/A | N/A | N/A |
Transit | N/A | N/A | MassDOT/MBTA | Improved Inner Harbor Ferry | Conceptual | N/A | N/A | N/A | N/A |
Transit | N/A | N/A | MassDOT/MBTA | Improved Ferry Service from South Shore Communities to Boston | Conceptual | N/A | N/A | N/A | N/A |
Transit | Ferry Service | N/A | MassPort, MassDOT, MBTA, Boston | South Boston Transportation Study - New or expanded ferry service and water transportation infrastructure | Conceptual | 2015 | N/A | N/A | |
Transit | Ferry Service | N/A | Winn Resort/ Revere | Water transportation vessels and dock facilities | Conceptual | N/A | N/A | ||
Project Type | Investment Program | PROJIS | Proponent(s) | Project Name | TIP/ LRTP Status |
CTPS Study | Estimated Cost | Project Length | 2015-2018 TIP |
Projects that do not add capacity to the system/Cost under $20 million | |||||||||
Arterial and Intersection | Complete Streets | 604123 | Ashland | Reconstruction on Route 126 (Pond Street), from the Framingham T.L. to the Holliston T.L. | Pre-TIP | N/A | $13,277,000 | 1.7 | N/A |
Arterial and Intersection | Complete Streets | 606453 | Boston | Improvements on Boylston Street, from Intersection of Brookline Avenue & Park Drive to Ipswich Street | Pre-TIP | N/A | $6,555,000 | 0.6 | N/A |
Arterial and Intersection | Complete Streets | 601274 | Boston | Reconstruction of Tremont Street, from Court Street to Boylston Street | Pre-TIP | N/A | $2,681,260 | 0.6 | N/A |
Arterial and Intersection | Complete Streets | N/A | Chelsea | Reconstruction of Beacham and Williams Street, from Spruce Street to the Everett City Line | Conceptual | N/A | N/A | 0.5 | N/A |
Arterial and Intersection | Complete Streets | 608007 | Cohasset | Corridor Improvements and Related Work on Justice Cushing Highway (Route 3A), from Beechwood Street to the Scituate Town Line | Pre-TIP | 2013 | $4,000,200 | 0.8 | N/A |
Arterial and Intersection | Complete Streets | 606896 | CTPS Study | Route 203 (Gallivan Street in Boston) | Conceptual | 2012 | $11,500,000 | N/A | N/A |
Arterial and Intersection | Complete Streets | 606897 | CTPS Study | Route 203 (Morton Street in Boston) | Conceptual | 2012 | $11,500,000 | N/A | N/A |
Arterial and Intersection | Complete Streets | N/A | CTPS Study | Route 114 in Danvers | Conceptual | 2012 | N/A | N/A | |
Arterial and Intersection | Complete Streets | N/A | CTPS Study | Reading - Main Street (Route 28) from South Street to Washington Street | Conceptual | 2013 | N/A | N/A | N/A |
Arterial and Intersection | Complete Streets | 602310 | Danvers | Reconstruction on Collins Street, from Sylvan Street to Centre & Holten Streets | Pre-TIP | N/A | $7,300,000 | 0.9 | N/A |
Arterial and Intersection | Complete Streets | N/A | Everett | Beacham Street | Conceptual | N/A | N/A | N/A | |
Arterial and Intersection | Complete Streets | 607652 | Everett | Reconstruction of Ferry Street, South Ferry Street and a Portion of Elm Street | Pre-TIP | 2013 | $6,440,000 | 1.6 | N/A |
Arterial and Intersection | Complete Streets | 601359 | Franklin | Reconstruction of Pleasant Street, from Main Street to Chestnut Street | Pre-TIP | N/A | $5,378,680 | 2.4 | N/A |
Arterial and Intersection | Complete Streets | 604377 | Gloucester | Washington Street And Railroad Avenue | Pre-TIP | N/A | $4,600,000 | 1.3 | N/A |
Arterial and Intersection | Complete Streets | 607309 | Hingham | Reconstruction and Related Work on Derby Street from Pond Park Road to Cushing Street | Pre-TIP | N/A | $3,840,661 | 0.8 | N/A |
Arterial and Intersection | Complete Streets | 606501 | Holbrook | Reconstruction of Union Street (Route 139), from Linfield Street to Centre Street/Water Street | Pre-TIP | N/A | $2,471,136 | 0.9 | N/A |
Arterial and Intersection | Complete Streets | 606043 | Hopkinton | Signal & Intersection Improvements on Route 135 | Pre-TIP | N/A | $7,235,377 | 0.8 | N/A |
Arterial and Intersection | Complete Streets | 601607 | Hull | Reconstruction of Atlantic Avenue and Related Work, from Nantasket Avenue to Cohasset Town Line | Pre-TIP | N/A | $5,175,277 | 1.3 | N/A |
Arterial and Intersection | Complete Streets | 607409 | Lexington | Reconstruction on Massachusetts Avenue, from Marrett Road to Pleasant Street | Pre-TIP | 2008 | $4,899,166 | 0.7 | N/A |
Arterial and Intersection | Complete Streets | 602077 | Lynn | Reconstruction on Route 129 (Lynnfield Street), from Great Woods Road to Wyoma Square | Pre-TIP | N/A | $3,457,578 | 1.0 | N/A |
Arterial and Intersection | Complete Streets | 604810 | Marlborough | Route 85 | TIP - 2016 | N/A | $5,144,104 | 1.1 | X |
Arterial and Intersection | Complete Streets | 607428 | Milford | Resurfacing & Intersection Improvements on Route 16 (Main Street), from Water Street to the Hopedale T.L. | Pre-TIP | N/A | $5,417,832 | 0.6 | N/A |
Arterial and Intersection | Complete Streets | 608045 | Milford | Rehabilitation on Route 16, from Route 109 to Beaver Street | Pre-TIP | N/A | $2,700,000 | 0.6 | N/A |
Arterial and Intersection | Complete Streets | 604206 | Milton | Rehabilitation of Central Avenue, from Brook Road to Eliot Street | Pre-TIP | N/A | $2,535,886 | 0.9 | N/A |
Arterial and Intersection | Complete Streets | 605034 | Natick | Reconstruction of Route 27 (North Main Street), from North Avenue to the Wayland Town Line | Pre-TIP | N/A | $13,090,726 | 2.2 | N/A |
Arterial and Intersection | Complete Streets | 601704 | Newton | Reconstruction & Signal Improvements on Walnut Street, from Homer Street to Route 9 | Pre-TIP | N/A | $4,648,360 | 1.3 | N/A |
Arterial and Intersection | Complete Streets | 600932 | Newton | Reconstruction on Route 30 (Commonwealth Avenue), from Weston Town Line to Auburn Street | Pre-TIP | N/A | $2,208,000 | 1.2 | N/A |
Arterial and Intersection | Complete Streets | N/A | CTPS Study | Washington Street - Chestnut Street to Church Street | Conceptual | 2015 | $15,000,000 | 2.0 | N/A |
Arterial and Intersection | Complete Streets | 605708 | Sharon | Signal and Intersection Improvements on South Main Street | Pre-TIP | N/A | $2,984,345 | 0.8 | N/A |
Arterial and Intersection | Complete Streets | 604989 | Southborough | Route 30 | TIP - 2017 | N/A | $6,345,000 | N/A | |
Arterial and Intersection | Complete Streets | 602261 | Walpole (MassDOT) | Reconstruction of Route 1A (Main Street), from the Norwood Town Line to Route 27 | Pre-TIP | N/A | $15,886,000 | 2.1 | N/A |
Arterial and Intersection | Complete Streets | 600671 | Walpole (MassDOT) | Reconstruction of Route 1A, from Common Street to the Norfolk Town Line | Pre-TIP | N/A | $15,000,000 | 1.9 | N/A |
Arterial and Intersection | Complete Streets | 607777 | Watertown | Rehabilitation of Mount Auburn Street (Route 16) | Pre-TIP | N/A | $12,233,125 | 1.8 | N/A |
Arterial and Intersection | Complete Streets | 608051 | Wilmington | Reconstruction on Route 38 (Main Street), from Route 62 to the Woburn City Line | Pre-TIP | N/A | $9,108,000 | 2.1 | N/A |
Arterial and Intersection | Complete Streets | 607244 | Winthrop | Reconstruction and Related Work along Winthrop Street and Revere Street Corridor | Pre-TIP | N/A | $5,040,000 | 1.8 | N/A |
Arterial and Intersection | Complete Streets | 607340 | Wellesley | Route 9 Corridor Reconstruction | Pre-TIP | $16,462,400 | 4.8 | ||
Arterial and Intersection | Complete Streets | 604745 | Wrentham | Reconstruction of Taunton Street (Route 152) | Pre-TIP | N/A | $3,945,871 | 0.9 | N/A |
Arterial and Intersection | Intersection Improvements | 607748 | Acton | Intersection and Signal Improvements on State Route 2 and State Route 111 (Massachusetts Avenue) at Piper Road and Taylor Road | Pre-TIP | N/A | $520,000 | 0.1 | N/A |
Arterial and Intersection | Intersection Improvements | N/A | Ashland | Intersection Improvements at Frankland Road and West Union Street (Route 135) | Conceptual | N/A | N/A | 0.1 | N/A |
Arterial and Intersection | Intersection Improvements | 606117 | Boston | Traffic Signal Improvements at 11 Locations | Pre-TIP | N/A | $3,036,200 | 0.6 | N/A |
Arterial and Intersection | Intersection Improvements | 605110 | Brookline | Intersection and Signal Improvements at Route 9 & Village Square (Gateway East) | TIP | N/A | $5,070,387 | N/A | |
Arterial and Intersection | Intersection Improvements | N/A | Winn Resort/ Cambridge | Intersection Improvements at Land Boulevard/O'Brien Highway | Conceptual | N/A | |||
Arterial and Intersection | Intersection Improvements | N/A | CTPS Study | Franklin/West Street, Braintree Intersection improvements | Conceptual | 2013 | N/A | N/A | X |
Arterial and Intersection | Intersection Improvements | N/A | CTPS Study | Marshfield - Careswell Street (Route 139) and Webster Street Intersection | Conceptual | 2012 | N/A | N/A | N/A |
Arterial and Intersection | Intersection Improvements | N/A | CTPS Study | Milford - Route 140 at South Main Street | Conceptual | 2013 | N/A | N/A | |
Arterial and Intersection | Intersection Improvements | N/A | CTPS Study | Reconstruct Intersection at Southern Artery (Route 3A) at Sea Street/Coddington Street and at McGrath Highway/Field Street, Quincy | Conceptual | 2012 | $750,000-1,0000,000 | N/A | N/A |
Arterial and Intersection | Intersection Improvements | N/A | CTPS Study | Revere - Crescent Avenue and Winthrop Avenue Intersection | Conceptual | 2012 | N/A | N/A | N/A |
Arterial and Intersection | Intersection Improvements | N/A | CTPS Study | Revere - Safety Improvements for Pedestrians at Park Avenue and Dale Street Intersection | Conceptual | 2013 | N/A | N/A | N/A |
Arterial and Intersection | Intersection Improvements | N/A | CTPS Study | Intersection Improvements Turnpike Road (Route 9) at Central Street/Oak Hill Road in Southborough | Conceptual | 2012 | N/A | N/A | N/A |
Arterial and Intersection | Intersection Improvements | 606002 | Duxbury | Signal Installation at Route 3 (NB & SB) Ramps & Route 3A (Tremont St) | Pre-TIP | N/A | $2,400,000 | 0.5 | N/A |
Arterial and Intersection | Intersection Improvements | N/A | Duxbury | Intersection Improvements at Route 3A and Route 139 | Conceptual | N/A | N/A | 0.1 | N/A |
Arterial and Intersection | Intersection Improvements | 605168 | Hingham | Intersection Improvements at Route 3A/Summer Street Rotary | Pre-TIP | N/A | $1,780,644 | 0.1 | N/A |
Arterial and Intersection | Intersection Improvements | 600518 | Hingham (MassDOT) | Intersection Improvements at Derby Street, Whiting Street (Route 53) and Gardner Street | Pre-TIP | 2003 | $2,827,048 | 0.4 | N/A |
Arterial and Intersection | Intersection Improvements | 607255 | Holbrook | Intersection improvements and related work at Weymouth Street/Pine Street/Sycamore Street | Pre-TIP | 2011 | $1,016,544 | N/A | |
Arterial and Intersection | Intersection Improvements | N/A | Holbrook | Intersection Improvements at South Franklin Street and King Road | Conceptual | N/A | N/A | 0.1 | N/A |
Arterial and Intersection | Intersection Improvements | N/A | Hudson | Intersection Improvements at Lincoln Street and Cox Street and Packard Street | Conceptual | 2011 | N/A | 0.1 | N/A |
Arterial and Intersection | Intersection Improvements | N/A | Hudson | Upgrades to the Route 85 and Route 62 Rotary | Conceptual | N/A | N/A | 0.1 | N/A |
Arterial and Intersection | Intersection Improvements | N/A | Lynn | Intersection Improvements at Boston Street and Hamilton Street | Conceptual | N/A | N/A | 0.1 | N/A |
Arterial and Intersection | Intersection Improvements | N/A | Lynn | Intersection Improvements at Route 1A Lynnway and Blossom Street | Conceptual | N/A | N/A | 0.1 | N/A |
Arterial and Intersection | Intersection Improvements | N/A | Lynn | Intersection Improvements at Route 1A Lynnway and Market Street | Conceptual | N/A | N/A | 0.1 | N/A |
Arterial and Intersection | Intersection Improvements | 604231 | Marlborough | Intersection & Signal Improvements on Route 20 (East Main Street/Boston Post Road) at Concord Road | Pre-TIP | N/A | $1,706,600 | 0.2 | N/A |
Arterial and Intersection | Intersection Improvements | N/A | MassDOT | Route 1 Intersection Signalization (Corridorwide) | Conceptual | N/A | N/A | N/A | N/A |
Arterial and Intersection | Intersection Improvements | N/A | Medfield | Intersection Improvements at Route 109 and Hartford Street | Conceptual | N/A | N/A | 0.1 | N/A |
Arterial and Intersection | Intersection Improvements | N/A | Milton | Intersection Improvements at Blue Hills Parkway and Brook Road | Conceptual | N/A | N/A | 0.1 | N/A |
Arterial and Intersection | Intersection Improvements | 605857 | Norwood | Intersection Improvements at Route 1 & University Avenue/Everett Street | Pre-TIP | 1999 | $3,780,000 | 0.2 | N/A |
Arterial and Intersection | Intersection Improvements | 606130 | Norwood | Intersection Improvements at Route 1A & Upland Road/Washington Street & Prospect Street/Fulton Street | Pre-TIP | N/A | $3,275,390 | 0.2 | N/A |
Arterial and Intersection | Intersection Improvements | N/A | Peabody | Signalize Intersection of Central Street and Tremont Street | Conceptual | N/A | N/A | 0.1 | N/A |
Arterial and Intersection | Intersection Improvements | N/A | Randolph | Route 28 (N. Main Street) and Liberty Street Intersections | Conceptual | N/A | N/A | 0.1 | N/A |
Arterial and Intersection | Intersection Improvements | N/A | Randolph | Route 28 (N. Main Street) and West Street Intersection | Conceptual | N/A | N/A | 0.1 | N/A |
Arterial and Intersection | Intersection Improvements | N/A | Somerville | Intersection Improvements at Cross Street and Pearl Street | Conceptual | N/A | N/A | 0.1 | N/A |
Arterial and Intersection | Intersection Improvements | N/A | Somerville | Intersection Improvements at Powderhouse Boulevard and Packard Avenue | Conceptual | N/A | N/A | 0.1 | N/A |
Arterial and Intersection | Intersection Improvements | N/A | Winn Resort/ Somerville | Intersection Improvements at (1) I-93 SB Off-Ramp/I-93 NB On-Ramp/Mystic Avenue (2) I-93 Off-Ramp/McGrath Highway (3) Mystic Avenue/McGrath Highway (4) Mystic Avenue/I-93 SB On-Ramp (5) Broadway/McGrath Highway (6) Mystic Avenue/I-93 NB On-Ramp | Conceptual | N/A | |||
Arterial and Intersection | Intersection Improvements | 607249 | Sudbury | Intersection Improvements at Route 20 and Landham Road | Pre-TIP | 2010 | $1,980,000 | 0.1 | N/A |
Arterial and Intersection | Intersection Improvements | N/A | Sudbury | Intersection Improvements at Route 20 and Horsepond Road | Conceptual | N/A | N/A | 0.1 | N/A |
Arterial and Intersection | Intersection Improvements | N/A | Sudbury | Intersection Improvements at Route 20 and Wayside Inn Road | Conceptual | N/A | N/A | 0.1 | N/A |
Arterial and Intersection | Intersection Improvements | N/A | Waltham | Intersection Improvements at Lexington Street and Glen Meadow | Conceptual | N/A | N/A | 0.1 | N/A |
Arterial and Intersection | Intersection Improvements | N/A | Waltham | Intersection Improvements at Moody Street and Maple Street and High Street | Conceptual | N/A | N/A | 0.2 | N/A |
Arterial and Intersection | Intersection Improvements | N/A | Waltham | Intersection Improvements at Totten Pond Road and Lexington Street and Bacon Street | Conceptual | N/A | N/A | 0.5 | N/A |
Arterial and Intersection | Intersection Improvements | N/A | Waltham | Intersection Improvements at Trapelo Road and Forest Street | Conceptual | N/A | N/A | 0.1 | N/A |
Arterial and Intersection | Intersection Improvements | 601579 | Wayland | Signal and intersection improvements at Route 27 (Main Street) and Route 30 (Commonwealth Road) | TIP | 2008 | $2,479,451 | N/A | N/A |
Arterial and Intersection | Intersection Improvements | 605721 | Weymouth | Intersection Improvements at Middle Street, Libbey Industrial Parkway and Tara Drive | Pre-TIP | 2003 | $937,326 | 0.1 | N/A |
Arterial and Intersection | Intersection Improvements | N/A | Wilmington | Intersection Improvements at Salem Street (Route 62) and Middlesex Avenue and High Street | Conceptual | N/A | N/A | 0.1 | N/A |
Arterial and Intersection | Intersection Improvements | 608067 | Woburn | Intersection Reconstruction at Route 3 and Bedford Road and South Bedford Street | Pre-TIP | N/A | $1,440,000 | N/A | N/A |
Arterial and Intersection | N/A | N/A | Arlington | Reconstruct Massachusetts Avenue (Phase 2), from Pond Lane to Water Street | Conceptual | N/A | N/A | 0.3 | N/A |
Arterial and Intersection | N/A | N/A | Bedford | Reconstruct South Road, from Washington Street (Elm Brook) to Summer Street | Conceptual | N/A | N/A | 0.9 | N/A |
Arterial and Intersection | N/A | N/A | Bedford | Reconstruct Wiggins Avenue | Conceptual | N/A | N/A | 0.9 | N/A |
Arterial and Intersection | N/A | N/A | Bellingham | Reconstruct Maple Street, from Route 126 to Route 140 | Conceptual | N/A | N/A | 2.8 | N/A |
Arterial and Intersection | N/A | N/A | Bellingham | Reconstruct Pulaski Boulevard (Route 126), from South Main Street to the Blackstone Town Line | Conceptual | N/A | N/A | 0.7 | N/A |
Arterial and Intersection | N/A | N/A | Bellingham | Reconstruct Route 126 (South Main Street), from Pulaski Boulevard to Route 140 | Conceptual | N/A | N/A | 4.6 | N/A |
Arterial and Intersection | N/A | N/A | Bellingham | Reconstruct Hartford Avenue, from North Main Street (Route 126) to the Mendon Town Line | Conceptual | N/A | N/A | 1.6 | N/A |
Arterial and Intersection | N/A | N/A | Bolton | Reconstruct Route 85 (Hudson Road) | Conceptual | N/A | N/A | 1.6 | N/A |
Arterial and Intersection | N/A | 53001 | Boston | Northern Avenue Connector Roads (Phase 1) | Conceptual | N/A | N/A | N/A | N/A |
Arterial and Intersection | N/A | N/A | Boston | South Huntington Avenue | Conceptual | N/A | N/A | 0.2 | N/A |
Arterial and Intersection | N/A | N/A | Boston | Huntington Avenue | Conceptual | N/A | N/A | 1.3 | N/A |
Arterial and Intersection | N/A | N/A | Boston | Huntington Avenue | Conceptual | N/A | N/A | 0.3 | N/A |
Arterial and Intersection | Intersection Improvements | N/A | Winn Resort/ Boston | Intersection Improvements at (1) Alford Street/Main Street/Sever Street/Cambridge Street (2) Cambridge Street/I-93 NB Off-Ramp (3) Dexter Street/Alford Street (4) Rutherford Avenue/Route 1 | Conceptual | N/A | |||
Arterial and Intersection | N/A | N/A | Burlington | Route 62 (Wilmington Road) | Conceptual | N/A | N/A | 1.6 | N/A |
Arterial and Intersection | N/A | N/A | Burlington | Wheeler Road | Conceptual | N/A | N/A | 0.7 | N/A |
Arterial and Intersection | N/A | N/A | Burlington | South Bedford Street | Conceptual | N/A | N/A | 0.6 | N/A |
Arterial and Intersection | N/A | N/A | Chelsea | Reconstruct Spruce Street, from Everett Avenue and Sixth Street | Conceptual | N/A | N/A | 0.2 | N/A |
Arterial and Intersection | N/A | N/A | Chelsea | Reconstruct Broadway, from City Hall Ave to the Revere City Line | Conceptual | N/A | $10,000,000 | 1.0 | N/A |
Arterial and Intersection | N/A | N/A | Chelsea | Spruce Street/Second Street/Carter Street Improvements | Conceptual | N/A | $8,000,000 | 1.2 | N/A |
Arterial and Intersection | Intersection Improvements | N/A | Winn Resort/ Chelsea | Intersection Improvements at (1) Route 16/Washington Avenue (2) Route 16/Everett Avenue (3) Route 16/Webster Avenue | Conceptual | N/A | |||
Arterial and Intersection | N/A | N/A | Concord | Reconstruction of Route 117 (Fitchburg Turnpike) | Conceptual | N/A | N/A | 1.0 | N/A |
Arterial and Intersection | N/A | N/A | Concord | Reconstruction of Route 62 (Main St), Phase 3 | Conceptual | N/A | N/A | 0.8 | N/A |
Arterial and Intersection | N/A | N/A | Concord | Cambridge Turnpike | Conceptual | N/A | N/A | N/A | N/A |
Arterial and Intersection | N/A | N/A | CTPS Study | Route 138 Corridor (Canton, Milton, Stoughton) | Conceptual | N/A | N/A | N/A | N/A |
Arterial and Intersection | N/A | N/A | Danvers | Improve Railroad Crossing at the Intersection of Holten Street and Burroughs Street | Conceptual | N/A | N/A | 0.1 | N/A |
Arterial and Intersection | N/A | N/A | Everett | Reconstruction of Main Street, from Sweetser Circle to the Malden City Line | Conceptual | N/A | N/A | 0.9 | N/A |
Arterial and Intersection | Intersection Improvements | N/A | Winn Resort/ Everett | Intersection Improvements at (1) Revere Beach Parkway/Mystic View Road/Santilli Highway/Route 99 Connector Improvements (2) Route 16/Broadway/Main Street (3) Broadway/Beacham Street (4) Broadway/Horizon Way (5) Broadway/Lynde Street (6) Broadway/Thorndike Street (7) Bow Street/Mystic Street (8) Bow Street/Lynde Street (9) Bow Street/Thorndike Street (10) Beacham Street/Robin Street (11) Broadway/Bowdoin Street (12) Broadway/Norwood Street/Chelsea Street (13) Ferry Street/Broadway | Conceptual | N/A | |||
Arterial and Intersection | N/A | N/A | Framingham | Reconstruct Route 126 (Hollis Street), from Irving Street to the Ashland town line | Conceptual | N/A | N/A | 1.2 | N/A |
Arterial and Intersection | N/A | N/A | Framingham | Reconstruction of Route 126, from Route 9 to Lincoln Street | Conceptual | 2000 | N/A | 1.2 | N/A |
Arterial and Intersection | N/A | N/A | Framingham | Route 9/Route 126 Interchange | Conceptual | N/A | N/A | N/A | N/A |
Arterial and Intersection | N/A | N/A | Franklin | Reconstruct Chestnut Street, from Route 140 to Pleasant Street | Conceptual | N/A | N/A | 2.1 | N/A |
Arterial and Intersection | N/A | N/A | Franklin | Reconstruct Summer Street, from Route 140 to Wrentham Town Line | Conceptual | N/A | N/A | 2.5 | N/A |
Arterial and Intersection | N/A | 607774 | Franklin | Resurfacing and Intersection Improvements on Route 140, from Beaver Street to I-495 Ramps | Conceptual | N/A | $4,200,000 | N/A | N/A |
Arterial and Intersection | N/A | N/A | Franklin | Reconstruct Washington Street, from Bellingham Town Line to Prospect Street | Conceptual | N/A | N/A | 1.7 | N/A |
Arterial and Intersection | N/A | N/A | Gloucester | Gloucester Rotary | Conceptual | N/A | N/A | N/A | N/A |
Arterial and Intersection | N/A | N/A | Hudson | South Street | Conceptual | N/A | N/A | 0.3 | N/A |
Arterial and Intersection | N/A | N/A | Hull | Manomet Avenue | Conceptual | N/A | N/A | 1.0 | N/A |
Arterial and Intersection | N/A | N/A | Hull | Samoset Avenue | Conceptual | N/A | N/A | 1.1 | N/A |
Arterial and Intersection | N/A | 605743 | Ipswich | Resurfacing & Related Work on Central & South Main Streets | Pre-TIP | N/A | $2,624,154 | 0.6 | N/A |
Arterial and Intersection | N/A | N/A | Lexington | Waltham St | Conceptual | N/A | N/A | N/A | N/A |
Arterial and Intersection | N/A | N/A | Lexington | Hayden Ave | Conceptual | N/A | N/A | 1.0 | N/A |
Arterial and Intersection | N/A | N/A | Littleton | Harvard Street | Conceptual | N/A | N/A | 1.6 | N/A |
Arterial and Intersection | N/A | N/A | Lynn | Broad Street/Lewis Street/Route 129 | Conceptual | N/A | N/A | 6.7 | N/A |
Arterial and Intersection | N/A | N/A | Lynn | Route 129 (Boston St./Washington St.) | Conceptual | N/A | N/A | 0.1 | N/A |
Arterial and Intersection | N/A | N/A | Lynn | Route 1A Lynn (GE Bridge Nahant Rotary) | Conceptual | N/A | N/A | 2.4 | N/A |
Arterial and Intersection | N/A | N/A | Marlborough | Route 85 North (Bolton Street) | Conceptual | 2001 | N/A | 2.0 | N/A |
Arterial and Intersection | N/A | 604811 | Marlborough | Reconstruction of Route 20 (East Main Street), from Main Street Easterly to Lincoln Street | Pre-TIP | N/A | $2,252,930 | 0.3 | N/A |
Arterial and Intersection | N/A | N/A | Medfield | South Street | Conceptual | N/A | N/A | 1.3 | N/A |
Arterial and Intersection | N/A | N/A | Medford | Medford Square Phase 2 Improvements | Conceptual | N/A | N/A | 0.1 | N/A |
Arterial and Intersection | Intersection Improvements | N/A | Winn Resort/ Medford | Intersection Improvements at (1) Mystic Valley Parkway/Fellsway/Middlesex Avenue (2) Mystic Valley Parkway/Route 16 Connector (3) Mystic Valley Parkway/Mystic Avenue | Conceptual | N/A | |||
Arterial and Intersection | N/A | N/A | Medway | Route 109 (Milford Street) | Conceptual | N/A | N/A | 2.4 | N/A |
Arterial and Intersection | N/A | N/A | Melrose | Reconstruct Lebanon Street, from Main Street to the Malden City Line | Conceptual | N/A | N/A | 1.0 | N/A |
Arterial and Intersection | N/A | N/A | Melrose | Reconstruct Swains Pond Avenue, from Maple Terrace to the Malden City Line | Conceptual | N/A | N/A | 0.1 | N/A |
Arterial and Intersection | N/A | N/A | Melrose | Reconstruct Swains Pond Avenue, from Grove Street to Wheeler Avenue | Conceptual | N/A | N/A | 0.3 | N/A |
Arterial and Intersection | N/A | N/A | Melrose | Wyoming Avenue | Conceptual | N/A | N/A | 0.7 | N/A |
Arterial and Intersection | N/A | N/A | MPO Identified Need | Route 1A Salem to Revere | Conceptual | N/A | N/A | N/A | |
Arterial and Intersection | N/A | N/A | MPO Identified Need | Route 107 Western Ave at | Conceptual | N/A | N/A | N/A | |
Arterial and Intersection | N/A | N/A | MPO Identified Need | Route 114 Peabody, Salem | Conceptual | N/A | N/A | N/A | |
Arterial and Intersection | N/A | N/A | MPO Identified Need | Route 16 Fresh Pond Parkway and Alewife Brook Parkway | Conceptual | N/A | N/A | N/A | N/A |
Arterial and Intersection | N/A | N/A | MPO Identified Need | Memorial Drive Cambridge | Conceptual | N/A | N/A | N/A | N/A |
Arterial and Intersection | N/A | N/A | MPO Identified Need | Route 3A Marshfield to Quincy | Conceptual | N/A | N/A | N/A | N/A |
Arterial and Intersection | N/A | N/A | MPO Identified Need | Route 28 Milton to Randolph | Conceptual | N/A | N/A | N/A | N/A |
Arterial and Intersection | N/A | N/A | MPO Identified Need | Route 138 Milton | Conceptual | N/A | N/A | N/A | N/A |
Arterial and Intersection | N/A | N/A | MPO Identified Need | Route 9 Southborough to Newton | Conceptual | N/A | N/A | N/A | N/A |
Arterial and Intersection | N/A | N/A | MPO Identified Need | Route 16 Holliston to Newton | Conceptual | N/A | N/A | N/A | N/A |
Arterial and Intersection | N/A | N/A | MPO Identified Need | Route 20 Weston | Conceptual | N/A | N/A | N/A | N/A |
Arterial and Intersection | N/A | N/A | MPO Identified Need | Route 60 Improvements Arlington | Conceptual | N/A | N/A | N/A | N/A |
Arterial and Intersection | N/A | N/A | MPO Identified Need | Route 30 Framingham | Conceptual | N/A | N/A | N/A | N/A |
Arterial and Intersection | N/A | N/A | MPO Identified Need | Route 99 Everett | Conceptual | N/A | N/A | N/A | N/A |
Arterial and Intersection | N/A | N/A | MPO Identified Need | Route 129 Wilmington to Reading | Conceptual | N/A | N/A | N/A | N/A |
Arterial and Intersection | N/A | N/A | MPO Identified Need | Route 135 Wellesley to Natick | Conceptual | N/A | N/A | N/A | N/A |
Arterial and Intersection | N/A | N/A | Needham | Highland Avenue | Conceptual | N/A | N/A | 1.3 | N/A |
Arterial and Intersection | N/A | N/A | Newton | Washington St., Phase 2 (Perkins Street to Commonwealth Avenue) | Conceptual | N/A | N/A | 0.5 | N/A |
Arterial and Intersection | N/A | N/A | North Reading | Park Street Improvements | Conceptual | N/A | N/A | 0.7 | N/A |
Arterial and Intersection | N/A | N/A | Randolph | Reconstruction of Oak Street, from Devine Road to North Street | Conceptual | N/A | N/A | 1.2 | N/A |
Arterial and Intersection | N/A | N/A | Reading | Haverhill Street Reconstruction | Conceptual | N/A | N/A | 2.5 | N/A |
Arterial and Intersection | N/A | N/A | Reading | Streetscape Improvements on Haven & High Streets | Conceptual | N/A | N/A | 0.7 | N/A |
Arterial and Intersection | Intersection Improvements | N/A | Winn Resort/ Revere | Intersection Improvements at Route 16/Route 1A/Route 60 | Conceptual | N/A | |||
Arterial and Intersection | N/A | N/A | Rockland | VFW Drive, Weymouth Street, Hingham Street | Conceptual | N/A | N/A | 4.3 | N/A |
Arterial and Intersection | N/A | N/A | Somerville | Broadway East Somerville CMAQ | Conceptual | N/A | N/A | 0.1 | N/A |
Arterial and Intersection | N/A | N/A | Southborough | Cordaville Road/Route 85 Rehabilitation | Conceptual | N/A | N/A | 2.6 | N/A |
Arterial and Intersection | N/A | N/A | Sudbury | Old Sudbury Road (Route 27) | Conceptual | N/A | N/A | 0.1 | N/A |
Arterial and Intersection | N/A | N/A | Walpole | Walpole Central Business District | Conceptual | N/A | N/A | N/A | N/A |
Arterial and Intersection | N/A | N/A | Walpole | Elm St Improvements | Conceptual | N/A | N/A | 1.5 | N/A |
Arterial and Intersection | N/A | N/A | Waltham | Wyman Street | Conceptual | N/A | N/A | 1.0 | N/A |
Arterial and Intersection | N/A | N/A | Woburn | Route 38 (Main St.) Traffic Lights | Conceptual | N/A | N/A | 0.9 | N/A |
Arterial and Intersection | N/A | N/A | Air Force Road Rehabilitation | Conceptual | N/A | N/A | 0.4 | N/A | |
Arterial and Intersection | N/A | N/A | Main St Reconstruction and Pedestrian Improvement | Conceptual | N/A | N/A | 5.2 | N/A | |
Bicycle and Pedestrian | Bike Network | 607738 | Bedford | Minuteman Bikeway Extension, from Loomis Street to the Concord T.L. | Pre-TIP | N/A | $4,006,200 | 2.0 | N/A |
Bicycle and Pedestrian | Bike Network | N/A | Berlin, Hudson, Sudbury, Waltham, Wayland, Weston | Mass Central Trail "Wayside Trail" from Waltham to Berlin | Conceptual | 1997 | N/A | 24.4 | N/A |
Bicycle and Pedestrian | Bike Network | N/A | Boston | Linking the Corridors | Conceptual | N/A | N/A | 2.0 | N/A |
Bicycle and Pedestrian | Bike Network | 607888 | Boston | Multi-use Path Construction on New Fenway | Pre-TIP | N/A | $1,702,618 | 0.4 | N/A |
Bicycle and Pedestrian | Bike Network | N/A | Boxborough | Route 111 Trail | Conceptual | N/A | N/A | 0.1 | N/A |
Bicycle and Pedestrian | Bike Network | 606316 | Brookline | Pedestrian bridge rehabilitation over MBTA off Carlton Street | TIP | N/A | $1,776,396 | N/A | |
Bicycle and Pedestrian | Bike Network | N/A | Brookline | Emerald Necklace Bicycle and Pedestrian Crossings at Route 9 | Conceptual | N/A | $1,680,000 | 0.2 | N/A |
Bicycle and Pedestrian | Bike Network | N/A | Lexington | West Lexington Greenway | Conceptual | N/A | N/A | 4.4 | N/A |
Bicycle and Pedestrian | Bike Network | N/A | Lynn, Malden, Revere & Saugus | Bike to the Sea (Northern Strand) | Conceptual | 1996 | N/A | 8.4 | N/A |
Bicycle and Pedestrian | Bike Network | N/A | Medford | Mystic River Linear Park | Conceptual | N/A | N/A | 1.6 | N/A |
Bicycle and Pedestrian | Bike Network | 607732 | Natick | Cochituate Rail Trail, Phase Two | Pre-TIP | 2000 | $5,417,832 | 2.4 | N/A |
Bicycle and Pedestrian | Bike Network | N/A | Peabody and Salem | Riverwalk/Greenway, Peabody Square to Salem Train Depot | Conceptual | N/A | N/A | N/A | N/A |
Bicycle and Pedestrian | Bike Network | N/A | Salem | Canal Street Bikeway | Conceptual | N/A | $2,368,000 | 1.5 | N/A |
Bicycle and Pedestrian | Bike Network | N/A | Scituate | Scituate Greenway | Conceptual | N/A | N/A | 2.6 | N/A |
Bicycle and Pedestrian | Bike Network | N/A | Scituate | Pathway for all of Scituate and linking Commuter Rail | Conceptual | N/A | N/A | 17.1 | N/A |
Bicycle and Pedestrian | Bike Network | N/A | Sudbury | Bruce Freeman Rail Trail, Phase 2D | Conceptual | N/A | N/A | 4.4 | N/A |
Bicycle and Pedestrian | Bike Network | N/A | Sudbury | Bruce Freeman Rail Trail, Phase 2E | Conceptual | N/A | N/A | 1.3 | N/A |
Bicycle and Pedestrian | Bike Network | N/A | Woburn | Woburn Loop Bikeway Project | Conceptual | N/A | N/A | 0.8 | N/A |
Bicycle and Pedestrian | Clean Air and Mobility | N/A | Inner Core | Hubway Expansion | Conceptual | N/A | N/A | N/A | N/A |
Bicycle and Pedestrian | Pedestrian Connections | 604993 | Cambridge | Innovation Boulevard Streetscape & Pedestrian Improvements, Between Main Street & Binney Street (Phase I) | Pre-TIP | N/A | $1,500,000 | 0.3 | N/A |
Bicycle and Pedestrian | Pedestrian Connections | 607901 | Dedham | Pedestrian Improvements along Elm Street & Rustcraft Road Corridors | Pre-TIP | N/A | $3,312,000 | N/A | N/A |
Bicycle and Pedestrian | Pedestrian Connections | 607899 | Dedham | Pedestrian Improvements along Bussey Street | Pre-TIP | N/A | $2,592,000 | 1.5 | N/A |
Bicycle and Pedestrian | Pedestrian Connections | 608006 | Framingham | Pedestrian Hybrid Beacon Installation at Route 9 and Maynard Road | Pre-TIP | N/A | $886,228 | N/A | N/A |
Enhancement | N/A | N/A | Boston | Harbor Islands National Park Access | Conceptual | N/A | N/A | N/A | N/A |
Enhancement | N/A | N/A | Boston | Harbor Islands National Park and Long Island Pier Reconstruction | Conceptual | N/A | N/A | 0.3 | N/A |
Enhancement | N/A | N/A | Boston | Long Island Pier Reconstruction | Conceptual | N/A | N/A | 0.1 | N/A |
Enhancement | N/A | N/A | Boston | Long Island Pier | Conceptual | N/A | N/A | 0.2 | N/A |
Enhancement | N/A | N/A | Medford | Medford Square Parking | Conceptual | N/A | N/A | 0.4 | N/A |
Enhancement | N/A | N/A | Medford | Medford Square Water Taxi Landing and Related Park Improvements | Conceptual | N/A | N/A | N/A | N/A |
Freight | Arterial and Intersection | N/A | Winn Resort/ Everett | Lower Broadway Truck Route | Conceptual | N/A | |||
Major Highway | Interchange | 604862 | Bellingham | Ramp Construction and Relocation, I-495 at Route 126 | Pre-TIP | N/A | $15,000,000 | 0.6 | N/A |
Major Highway | Interchange | N/A | MassDOT | Coney Street Interchange with Route 95 | Conceptual | N/A | N/A | 0.6 | N/A |
Major Highway | Interchange | N/A | Newton | I-90/Interchange 17 | Conceptual | N/A | N/A | N/A | N/A |
Major Highway | Interchange | 607940 | Newton | Improvements of Route 128/I-95 & Grove Street | Pre-TIP | N/A | $10,000,055 | N/A | N/A |
Major Highway | Interchange | N/A | Rockland | Route 3/Union St. | Conceptual | N/A | N/A | N/A | N/A |
Major Highway | Interchange | N/A | Weston | Route 30/I-90 Interchange | Conceptual | N/A | N/A | N/A | N/A |
Major Highway | Interchange | 603739 | Wrentham | Construction of I-495/Route 1A Ramps | Pre-TIP | N/A | $4,002,192 | 0.1 | N/A |