Table 3-7
FFYs 2025–29 TIP Highway Table
STIP: 2026 - 2030 (D) | |||||||||||
Year | MassDOT Project ID | MPO | Municipality | MassDOT Project Description | District | Funding Source | Adjusted TFPC | Total Programmed Funds | Federal Funds | Non-Federal Funds | |
Federal Fiscal Year 2026 | $339,081,998 | $223,432,679 | $115,649,319 | ||||||||
Section 1A / Regionally Prioritized Projects | $122,615,097 | $98,977,111 | $23,637,986 | ||||||||
Roadway Reconstruction | $34,864,246 | $27,891,397 | $6,972,849 | ||||||||
2026 | 605168 | Boston Region | Hingham | HINGHAM- IMPROVEMENTS ON ROUTE 3A, FROM OTIS STREET/COLE ROAD INCLUDING SUMMER STREET AND ROTARY, ROCKLAND STREET TO GEORGE WASHINGTON BOULEVARD | 5 | NHPP | $31,949,531 | $13,949,531 | $11,159,625 | $2,789,906 | |
2026 | 605168 | Boston Region | Hingham | HINGHAM- IMPROVEMENTS ON ROUTE 3A, FROM OTIS STREET/COLE ROAD INCLUDING SUMMER STREET AND ROTARY, ROCKLAND STREET TO GEORGE WASHINGTON BOULEVARD | 5 | STBG | $31,949,531 | $6,000,000 | $4,800,000 | $1,200,000 | |
2026 | 605168 | Boston Region | Hingham | HINGHAM- IMPROVEMENTS ON ROUTE 3A, FROM OTIS STREET/COLE ROAD INCLUDING SUMMER STREET AND ROTARY, ROCKLAND STREET TO GEORGE WASHINGTON BOULEVARD | 5 | TAP | $31,949,531 | $2,000,000 | $1,600,000 | $400,000 | |
2026 | 606453 | Boston Region | Boston | BOSTON- IMPROVEMENTS ON BOYLSTON STREET, FROM INTERSECTION OF BROOKLINE AVENUE & PARK DRIVE TO IPSWICH STREET | 6 | CMAQ | $8,331,781 | $3,000,000 | $2,400,000 | $600,000 | |
2026 | 606453 | Boston Region | Boston | BOSTON- IMPROVEMENTS ON BOYLSTON STREET, FROM INTERSECTION OF BROOKLINE AVENUE & PARK DRIVE TO IPSWICH STREET | 6 | STBG | $8,331,781 | $6,000,000 | $4,800,000 | $1,200,000 | |
2026 | 606453 | Boston Region | Boston | BOSTON- IMPROVEMENTS ON BOYLSTON STREET, FROM INTERSECTION OF BROOKLINE AVENUE & PARK DRIVE TO IPSWICH STREET | 6 | TAP | $8,331,781 | $1,185,935 | $948,748 | $237,187 | |
2026 | S13129 | Boston Region | Salem | SALEM- BROAD STREET AND DALTON PARKWAY CORRIDOR PROJECT (DESIGN ONLY) | 4 | STBG | $1,068,780 | $1,068,780 | $855,024 | $213,756 | |
2026 | S13293 | Boston Region | Acton | ACTON- RECONSTRUCTION OF ROUTE 2A/119 (GREAT ROAD), FROM DAVIS ROAD TO HARRIS STREET | 3 | NHPP | $860,000 | $860,000 | $688,000 | $172,000 | |
2026 | S13294 | Boston Region | Malden | MALDEN- IMPROVEMENTS ON EASTERN AVENUE (ROUTE 60), FROM FRANKLIN STREET TO LYNN STREET (DESIGN ONLY) | 4 | NHPP | $800,000 | $800,000 | $640,000 | $160,000 | |
Intersection Improvements | $8,850,336 | $7,965,302 | $885,034 | ||||||||
2026 | 608067 | Boston Region | Multiple | WOBURN- BURLINGTON- INTERSECTION RECONSTRUCTION AT ROUTE 3 (CAMBRIDGE ROAD) & BEDFORD ROAD AND SOUTH BEDFORD STREET | 4 | HSIP | $4,883,749 | $4,883,750 | $4,395,375 | $488,375 | |
2026 | 608940 | Boston Region | Weston | WESTON- INTERSECTION IMPROVEMENTS BOSTON POST ROAD (ROUTE 20) AT WELLESLEY STREET | 6 | HSIP | $3,966,586 | $3,966,586 | $3,569,927 | $396,659 | |
Bicycle and Pedestrian | $62,495,055 | $49,996,044 | $12,499,011 | ||||||||
2026 | 609204 | Boston Region | Belmont | BELMONT- COMMUNITY PATH, BELMONT COMPONENT OF THE MCRT (PHASE I) | 4 | CMAQ | $32,556,266 | $6,499,750 | $5,199,800 | $1,299,950 | |
2026 | 609204 | Boston Region | Belmont | BELMONT- COMMUNITY PATH, BELMONT COMPONENT OF THE MCRT (PHASE I) | 4 | STBG | $32,556,266 | $13,306,516 | $10,645,213 | $2,661,303 | |
2026 | 609204 | Boston Region | Belmont | BELMONT- COMMUNITY PATH, BELMONT COMPONENT OF THE MCRT (PHASE I) | 4 | TAP | $32,556,266 | $7,500,000 | $6,000,000 | $1,500,000 | |
2026 | 610544 | Boston Region | Peabody | PEABODY- MULTI-USE PATH CONSTRUCTION OF INDEPENDENCE GREENWAY AT I-95 AND ROUTE 1 | 4 | CMAQ | $19,127,610 | $10,000,000 | $8,000,000 | $2,000,000 | |
2026 | 610544 | Boston Region | Peabody | PEABODY- MULTI-USE PATH CONSTRUCTION OF INDEPENDENCE GREENWAY AT I-95 AND ROUTE 1 | 4 | STBG | $19,127,610 | $5,127,610 | $4,102,088 | $1,025,522 | |
2026 | 610544 | Boston Region | Peabody | PEABODY- MULTI-USE PATH CONSTRUCTION OF INDEPENDENCE GREENWAY AT I-95 AND ROUTE 1 | 4 | TAP | $19,127,610 | $4,000,000 | $3,200,000 | $800,000 | |
2026 | 611982 | Boston Region | Medford | MEDFORD- SHARED USE PATH CONNECTION AT THE ROUTE 28/WELLINGTON UNDERPASS | 4 | CMAQ | $5,488,945 | $5,488,945 | $4,391,156 | $1,097,789 | |
2026 | 613163 | Boston Region | Multiple | LYNNFIELD- PEABODY- RAIL TRAIL CONSTRUCTION, FROM FORD AVENUE TO NICHOLS LANE (PHASE 1) | 4 | STBG | $5,829,514 | $5,829,514 | $4,663,611 | $1,165,903 | |
2026 | S13048 | Boston Region | Hudson | HUDSON- BIKE PATH CONSTRUCTION OF MASS CENTRAL RAIL TRAIL, FROM FELTON STREET TO PRIEST STREET (DESIGN ONLY) | 3 | STBG | $909,700 | $909,700 | $727,760 | $181,940 | |
2026 | S13179 | Boston Region | Brookline | BROOKLINE- BLUEBIKES EXPANSION, 3 STATIONS AND 20 ELECTRIC BIKES | 6 | CMAQ | $238,646 | $238,646 | $190,917 | $47,729 | |
2026 | S13180 | Boston Region | Boston | BOSTON- BLUEBIKES STATION REPLACEMENT, 20 STATIONS | 6 | STBG | $783,860 | $783,860 | $627,088 | $156,772 | |
2026 | S13181 | Boston Region | Somerville | SOMERVILLE- BLUEBIKES STATION REPLACEMENT, 5 STATIONS | 4 | STBG | $107,417 | $107,417 | $85,934 | $21,483 | |
2026 | S13182 | Boston Region | Cambridge | CAMBRIDGE- BLUEBIKES STATION REPLACEMENT, 7 STATIONS | 6 | STBG | $223,715 | $223,715 | $178,972 | $44,743 | |
2026 | S13183 | Boston Region | Newton | NEWTON- INSTALLATION OF 67 BIKE RACKS, 2 SHELTERS, AND 12 RRFBS | 6 | CMAQ | $473,132 | $473,132 | $378,506 | $94,626 | |
2026 | S13184 | Boston Region | Marblehead | MARBLEHEAD- INSTALLATION OF 22 BIKE RACKS | 4 | CMAQ | $6,250 | $6,250 | $5,000 | $1,250 | |
2026 | S13295 | Boston Region | Cambridge | CAMBRIDGE- NEW BRIDGE AND SHARED-USE PATH CONSTRUCTION OVER FITCHBURG LINE AT DANEHY PARK CONNECTOR (DESIGN ONLY) | TAP | $2,000,000 | $2,000,000 | $1,600,000 | $400,000 | ||
Flex to FTA | $11,254,397 | $9,003,518 | $2,250,879 | ||||||||
2026 | S12807 | Boston Region | Multiple | MWRTA CATCHCONNECT MICROTRANSIT EXPANSION PHASE 2 | 3 | CMAQ | $468,125 | $162,500 | $130,000 | $32,500 | |
2026 | S13152 | Boston Region | Better Bus Project - Operational Safety Improvements at Bus Stops | CMAQ | $3,216,897 | $3,216,897 | $2,573,518 | $643,379 | |||
2026 | S13153 | Boston Region | MBTA- BUS PRIORITY AND ACCESSIBILITY IMPROVEMENTS | CMAQ | $6,000,000 | $6,000,000 | $4,800,000 | $1,200,000 | |||
2026 | S13292 | Boston Region | Multiple | MBTA- OPERATIONAL ENHANCEMENT OF BUS ROUTES 714 AND 716 | 6 | CMAQ | $1,875,000 | $1,875,000 | $1,500,000 | $375,000 | |
Transit Grant Program | $2,058,063 | $1,646,450 | $411,613 | ||||||||
2026 | S12963 | Boston Region | Multiple | CHELSEA-REVERE- REGIONAL ON-DEMAND MICROTRANSIT PILOT PROJECT | CMAQ | $1,413,734 | $450,278 | $360,222 | $90,056 | ||
2026 | S12970 | Boston Region | CATA– VEHICLE REPLACEMENT (4 VEHICLES) | 4 | CMAQ | $2,460,000 | $750,000 | $600,000 | $150,000 | ||
2026 | S12971 | Boston Region | Framingham | MWRTA– BLANDIN HUB EQUITABLE REDESIGN INITIATIVE | 3 | CMAQ | $2,500,000 | $750,000 | $600,000 | $150,000 | |
2026 | S13194 | Boston Region | Chelsea | CHELSEA- BLUEBIKES EXPANSION, 3 STATIONS, 28 CLASSIC BIKES, AND 5 ELECTRIC BIKES | 6 | CMAQ | $107,785 | $107,785 | $86,228 | $21,557 | |
Safety Improvements | $1,650,000 | $1,320,000 | $330,000 | ||||||||
2026 | S13146 | Boston Region | Lexington | LEXINGTON- DESIGN OF SAFETY IMPROVEMENTS AT THE INTERSTATE 95 AND ROUTE 4/225 INTERCHANGE | 4 | NHPP | $1,650,000 | $1,650,000 | $1,320,000 | $330,000 | |
Railroad Grade Crossings | $1,400,000 | $1,120,000 | $280,000 | ||||||||
2026 | S13147 | Boston Region | Framingham | FRAMINGHAM- PRELIMINARY DESIGN OF INTERSECTION IMPROVEMENTS AT ROUTE 126/135/MBTA & CSX RAILROAD | 3 | STBG | $1,400,000 | $1,400,000 | $1,120,000 | $280,000 | |
Metropolitan Planning | $43,000 | $34,400 | $8,600 | ||||||||
2026 | S13291 | Boston Region | CTPS- PROCUREMENT AND INSTALLATION OF SIX AIR QUALITY SENSORS FOR GHG MONITORING (PERFORMANCE BASED PLANNING PROGRAM) | STBG | $43,000 | $43,000 | $34,400 | $8,600 | |||
Section 1B / Earmark or Discretionary Grant Funded Projects | $48,069,116 | $38,455,293 | $9,613,823 | ||||||||
Bridge On-system Non-NHS NB | $10,338,718 | $8,270,974 | $2,067,744 | ||||||||
2026 | 608197 | Boston Region | Boston | BOSTON- BRIDGE REHABILITATION, B-16-107, CANTERBURY STREET OVER AMTRAK RAILROAD | 6 | HIP-BR | $10,338,718 | $10,338,718 | $8,270,974 | $2,067,744 | |
Bridge Systematic Maintenance NB | $37,730,398 | $30,184,318 | $7,546,080 | ||||||||
2026 | 613182 | Boston Region | Milford | MILFORD- BRIDGE PRESERVATION, M-21-022 (1UD, 1UE), I-495 OVER STATE ROUTE 109/MEDWAY ROAD | 3 | HIP-BR | $3,744,000 | $3,744,000 | $2,995,200 | $748,800 | |
2026 | 613196 | Boston Region | Burlington | BURLINGTON- LYNNFIELD- WAKEFIELD- WOBURN- BRIDGE PRESERVATION OF 10 BRIDGES CARRYING I-95 | 4 | HIP-BR | $13,171,481 | $13,171,481 | $10,537,185 | $2,634,296 | |
2026 | 613274 | Boston Region | Foxborough | FOXBORO- BRIDGE PRESERVATION AT 6 BRIDGES ALONG THE I-95 CORRIDOR | 5 | HIP-BR | $5,278,000 | $5,278,000 | $4,222,400 | $1,055,600 | |
2026 | 613276 | Boston Region | Multiple | READING- WILMINGTON- BRIDGE PRESERVATION, W-38-028 (2HR, 2HT) AND R-03-011 (2HK), I-93 (NB/SB) OVER MBTA/B&M RAILROAD AND I-95/STATE ROUTE 128 | 4 | HIP-BR | $18,601,526 | $10,000,000 | $8,000,000 | $2,000,000 | |
2026 | 613921 | Boston Region | Boston | BOSTON- BRIDGE DECK PRESERVATION OF B-16-259 AND B-16-260 ON I-93 | 6 | HIP-BR | $21,000,000 | $5,536,917 | $4,429,534 | $1,107,383 | |
Section 2A / Federal Aid Funded State Prioritized Reliability Projects | $36,344,846 | $31,049,588 | $5,295,258 | ||||||||
Safety Improvements | $6,794,152 | $6,114,737 | $679,415 | ||||||||
2026 | 609388 | Boston Region | Wenham | WENHAM- SAFETY IMPROVEMENTS ON ROUTE 1A | 4 | HSIP | $4,941,812 | $4,941,812 | $4,447,631 | $494,181 | |
2026 | 613994 | Boston Region | Multiple | LEXINGTON TO READING- GUIDE AND TRAFFIC SIGN REPLACEMENT ON A SECTION OF I-95/128 | 4 | HSIP | $1,852,340 | $1,852,340 | $1,667,106 | $185,234 | |
Non-Interstate Pavement | $16,607,731 | $13,286,185 | $3,321,546 | ||||||||
2026 | 609399 | Boston Region | Randolph | RANDOLPH- RESURFACING AND RELATED WORK ON ROUTE 28 | 6 | NHPP | $6,321,315 | $6,321,315 | $5,057,052 | $1,264,263 | |
2026 | 612050 | Boston Region | Multiple | BRAINTREE- WEYMOUTH- RESURFACING AND RELATED WORK ON ROUTE 3 | 6 | NHPP | $10,286,416 | $10,286,416 | $8,229,133 | $2,057,283 | |
Interstate Pavement | $12,942,963 | $11,648,667 | $1,294,296 | ||||||||
2026 | 613383 | Boston Region | Multiple | LYNNFIELD- WAKEFIELD- INTERSTATE PAVEMENT PRESERVATION AND RELATED WORK ON I-95 | 4 | NHPP-I | $12,942,963 | $12,942,963 | $11,648,667 | $1,294,296 | |
Section 2B / Federal Aid Funded State Prioritized Modernization Projects | $61,487,731 | $54,950,687 | $6,537,044 | ||||||||
Intersection Improvements | $21,901,129 | $19,711,016 | $2,190,113 | ||||||||
2026 | 607342 | Boston Region | Milton | MILTON- INTERSECTION IMPROVEMENTS AT ROUTE 28 (RANDOLPH AVENUE) & CHICKATAWBUT ROAD | 6 | HSIP | $11,597,752 | $11,597,752 | $10,437,977 | $1,159,775 | |
2026 | 611974 | Boston Region | Medford | MEDFORD- INTERSECTION IMPROVEMENTS AT MAIN STREET/SOUTH STREET, MAIN STREET/MYSTIC VALLEY PARKWAY RAMPS AND MAIN STREET/MYSTIC AVENUE | 4 | VUS | $10,303,377 | $2,325,483 | $2,092,935 | $232,548 | |
2026 | 611974 | Boston Region | Medford | MEDFORD- INTERSECTION IMPROVEMENTS AT MAIN STREET/SOUTH STREET, MAIN STREET/MYSTIC VALLEY PARKWAY RAMPS AND MAIN STREET/MYSTIC AVENUE | 4 | HSIP | $10,303,377 | $7,977,894 | $7,180,105 | $797,789 | |
Roadway Reconstruction | $35,703,894 | $32,133,505 | $3,570,389 | ||||||||
2026 | 607977 | Boston Region | Multiple | HOPKINTON- WESTBOROUGH- RECONSTRUCTION OF I-90/I-495 INTERCHANGE | 3 | NHPP-I | $300,942,837 | $29,229,180 | $26,306,262 | $2,922,918 | |
2026 | 607977 | Boston Region | Multiple | HOPKINTON- WESTBOROUGH- RECONSTRUCTION OF I-90/I-495 INTERCHANGE | 3 | NFP-I | $300,942,837 | $6,474,714 | $5,827,243 | $647,471 | |
Safe Routes to School | $3,882,708 | $3,106,166 | $776,542 | ||||||||
2026 | 610537 | Boston Region | Boston | BOSTON- ELLIS ELEMENTARY TRAFFIC CALMING (SRTS) | 6 | TAP | $2,363,537 | $2,363,537 | $1,890,830 | $472,707 | |
2026 | 611997 | Boston Region | Newton | NEWTON- HORACE MANN ELEMENTARY SCHOOL IMPROVEMENTS (SRTS) | 6 | TAP | $1,519,171 | $1,519,171 | $1,215,337 | $303,834 | |
Section 3B / Non-Federal Aid Funded | $70,565,208 | $0 | $70,565,208 | ||||||||
Bridge On-system Non-NHS | $27,791,674 | $0 | $27,791,674 | ||||||||
2026 | 607420 | Boston Region | Natick | NATICK- SUPERSTRUCTURE REPLACEMENT, N-03-012, BODEN LANE OVER CSX/MBTA | 3 | NGBP | $10,562,329 | $10,562,329 | $0 | $10,562,329 | |
2026 | 611940 | Boston Region | Somerville | SOMERVILLE- BRIDGE REPLACEMENT, S-17-016 (3GF), WEBSTER AVENUE OVER MBTA & BMRR | 4 | NGBP | $18,753,007 | $17,229,345 | $0 | $17,229,345 | |
NFA | $26,680,000 | $0 | $26,680,000 | ||||||||
2026 | 607977 | Boston Region | Multiple | HOPKINTON- WESTBOROUGH- RECONSTRUCTION OF I-90/I-495 INTERCHANGE | 3 | NFA | $300,942,837 | $26,680,000 | $0 | $26,680,000 | |
Bridge On-system NHS | $16,093,534 | $0 | $16,093,534 | ||||||||
2026 | 612184 | Boston Region | Revere | REVERE- BRIDGE REPLACEMENT, R-05-015, REVERE BEACH PARKWAY OVER BROADWAY | 4 | NGBP | $15,592,505 | $16,093,534 | $0 | $16,093,534 | |
Federal Fiscal Year 2027 | $508,411,137 | $295,583,926 | $212,827,211 | ||||||||
Section 1A / Regionally Prioritized Projects | $151,147,420 | $121,801,624 | $29,345,796 | ||||||||
Roadway Reconstruction | $98,778,802 | $79,273,042 | $19,505,760 | ||||||||
2027 | 605168 | Boston Region | Hingham | HINGHAM- IMPROVEMENTS ON ROUTE 3A, FROM OTIS STREET/COLE ROAD INCLUDING SUMMER STREET AND ROTARY, ROCKLAND STREET TO GEORGE WASHINGTON BOULEVARD | 5 | NHPP | $31,949,531 | $9,000,000 | $7,200,000 | $1,800,000 | |
2027 | 605168 | Boston Region | Hingham | HINGHAM- IMPROVEMENTS ON ROUTE 3A, FROM OTIS STREET/COLE ROAD INCLUDING SUMMER STREET AND ROTARY, ROCKLAND STREET TO GEORGE WASHINGTON BOULEVARD | 5 | TAP | $31,949,531 | $1,000,000 | $800,000 | $200,000 | |
2027 | 605743 | Boston Region | Ipswich | IPSWICH- RESURFACING & RELATED WORK ON CENTRAL & SOUTH MAIN STREETS | 4 | STBG | $14,456,975 | $6,000,000 | $4,800,000 | $1,200,000 | |
2027 | 607981 | Boston Region | Somerville | SOMERVILLE- MCGRATH BOULEVARD CONSTRUCTION | 4 | STBG | $128,385,573 | $25,000,000 | $20,000,000 | $5,000,000 | |
2027 | 607981 | Boston Region | Somerville | SOMERVILLE- MCGRATH BOULEVARD CONSTRUCTION | 4 | TAP | $128,385,573 | $5,000,000 | $4,000,000 | $1,000,000 | |
2027 | 608045 | Boston Region | Milford | MILFORD- REHABILITATION ON ROUTE 16, FROM ROUTE 109 TO BEAVER STREET | 3 | HSIP | $13,548,565 | $1,500,000 | $1,350,000 | $150,000 | |
2027 | 608045 | Boston Region | Milford | MILFORD- REHABILITATION ON ROUTE 16, FROM ROUTE 109 TO BEAVER STREET | 3 | STBG | $13,548,565 | $12,048,565 | $9,638,852 | $2,409,713 | |
2027 | 609257 | Boston Region | Everett | EVERETT- RECONSTRUCTION OF BEACHAM STREET | 4 | HSIP | $12,075,024 | $1,000,000 | $900,000 | $100,000 | |
2027 | 609257 | Boston Region | Everett | EVERETT- RECONSTRUCTION OF BEACHAM STREET | 4 | STBG | $12,075,024 | $9,175,024 | $7,340,019 | $1,835,005 | |
2027 | 609257 | Boston Region | Everett | EVERETT- RECONSTRUCTION OF BEACHAM STREET | 4 | TAP | $12,075,024 | $1,900,000 | $1,520,000 | $380,000 | |
2027 | 609437 | Boston Region | Multiple | SALEM- PEABODY- BOSTON STREET IMPROVEMENTS | 4 | STBG | $25,155,213 | $19,220,197 | $15,376,158 | $3,844,039 | |
2027 | 609437 | Boston Region | Multiple | SALEM- PEABODY- BOSTON STREET IMPROVEMENTS | 4 | TAP | $25,155,213 | $5,935,016 | $4,748,013 | $1,187,003 | |
2027 | S12820 | Boston Region | BOSTON REGION - BIKESHARE SUPPORT SET ASIDE | STBG | $8,000,000 | $2,000,000 | $1,600,000 | $400,000 | |||
Intersection Improvements | $27,636,336 | $22,372,702 | $5,263,634 | ||||||||
2027 | 605857 | Boston Region | Norwood | NORWOOD- INTERSECTION IMPROVEMENTS AND RELATED WORK AT ROUTE 1 & UNIVERSITY AVENUE/EVERETT STREET | 5 | CMAQ | $26,573,400 | $5,000,000 | $4,000,000 | $1,000,000 | |
2027 | 605857 | Boston Region | Norwood | NORWOOD- INTERSECTION IMPROVEMENTS AND RELATED WORK AT ROUTE 1 & UNIVERSITY AVENUE/EVERETT STREET | 5 | HSIP | $26,573,400 | $2,636,336 | $2,372,702 | $263,634 | |
2027 | 605857 | Boston Region | Norwood | NORWOOD- INTERSECTION IMPROVEMENTS AND RELATED WORK AT ROUTE 1 & UNIVERSITY AVENUE/EVERETT STREET | 5 | NHPP | $26,573,400 | $10,000,000 | $8,000,000 | $2,000,000 | |
2027 | 605857 | Boston Region | Norwood | NORWOOD- INTERSECTION IMPROVEMENTS AND RELATED WORK AT ROUTE 1 & UNIVERSITY AVENUE/EVERETT STREET | 5 | STBG | $26,573,400 | $10,000,000 | $8,000,000 | $2,000,000 | |
Safety Improvements | $3,700,546 | $3,330,491 | $370,055 | ||||||||
2027 | 610823 | Boston Region | Quincy | QUINCY- INTERSECTION IMPROVEMENTS AT WILLARD STREET AND RICCIUTI DRIVE | 6 | HSIP | $3,700,546 | $3,700,546 | $3,330,491 | $370,055 | |
Bridge On-system NHS | $16,531,736 | $13,225,389 | $3,306,347 | ||||||||
2027 | 612989 | Boston Region | Boston | BOSTON- BRIDGE PRESERVATION, B-16-066 (38D), CAMBRIDGE STREET OVER MBTA | 6 | NHPP | $16,531,736 | $16,531,736 | $13,225,389 | $3,306,347 | |
Transit Grant Program | $2,500,000 | $2,000,000 | $500,000 | ||||||||
2027 | S12124 | Boston Region | Multiple | BOSTON REGION - COMMUNITY CONNECTIONS PROGRAM | CMAQ | $9,036,193 | $2,036,193 | $1,628,954 | $407,239 | ||
2027 | S12963 | Boston Region | Multiple | CHELSEA-REVERE- REGIONAL ON-DEMAND MICROTRANSIT PILOT PROJECT | CMAQ | $1,413,734 | $463,807 | $371,046 | $92,761 | ||
Roadway Improvements | $2,000,000 | $1,600,000 | $400,000 | ||||||||
2027 | S13145 | Boston Region | BOSTON REGION PROJECT DESIGN SET-ASIDE | STBG | $11,000,000 | $2,000,000 | $1,600,000 | $400,000 | |||
Section 1B / Earmark or Discretionary Grant Funded Projects | $82,965,615 | $69,828,646 | $13,136,969 | ||||||||
Bridge On-system Non-NHS NB | $14,935,415 | $11,948,332 | $2,987,083 | ||||||||
2027 | 608522 | Boston Region | Middleton | MIDDLETON- BRIDGE REPLACEMENT, M-20-003, ROUTE 62 (MAPLE STREET) OVER IPSWICH RIVER | 4 | HIP-BR | $10,486,061 | $10,486,061 | $8,388,849 | $2,097,212 | |
2027 | 612099 | Boston Region | Ashland | ASHLAND- BRIDGE REPLACEMENT, A-14-006, CORDAVILLE ROAD OVER SUDBURY RIVER | 3 | HIP-BR | $7,203,664 | $4,449,354 | $3,559,483 | $889,871 | |
Bridge Off-system | $11,384,206 | $11,384,206 | $0 | ||||||||
2027 | 609467 | Boston Region | Multiple | HAMILTON- IPSWICH- BRIDGE REPLACEMENT, H-03-002=I-01-006, WINTHROP STREET OVER IPSWICH RIVER | 4 | BROFF | $11,384,206 | $11,384,206 | $11,384,206 | $0 | |
Bridge Off-system Local NB | $5,896,563 | $5,896,563 | $0 | ||||||||
2027 | 612076 | Boston Region | Topsfield | TOPSFIELD- BRIDGE REPLACEMENT, T-06-013, PERKINS ROW OVER MILE BROOK | 4 | BROFF | $5,896,563 | $5,896,563 | $5,896,563 | $0 | |
Bridge On-system NHS | $20,000,000 | $16,000,000 | $4,000,000 | ||||||||
2027 | 612496 | Boston Region | Somerville | SOMERVILLE- BRIDGE PRESERVATION, S-17-031, I-93 (NB & SB) FROM ROUTE 28 TO TEMPLE STREET (PHASE 2) | 4 | HIP-BR | $217,509,198 | $20,000,000 | $16,000,000 | $4,000,000 | |
Bridge Systematic Maintenance NB | $30,749,431 | $24,599,545 | $6,149,886 | ||||||||
2027 | 613184 | Boston Region | Gloucester | GLOUCESTER- BRIDGE PRESERVATION, G-05-017 (2U8), STATE ROUTE 128/YANKEE DIVISION HIGHWAY OVER ANNISQUAM RIVER | 4 | HIP-BR | $15,684,822 | $15,684,822 | $12,547,858 | $3,136,964 | |
2027 | 613276 | Boston Region | Multiple | READING- WILMINGTON- BRIDGE PRESERVATION, W-38-028 (2HR, 2HT) AND R-03-011 (2HK), I-93 (NB/SB) OVER MBTA/B&M RAILROAD AND I-95/STATE ROUTE 128 | 4 | HIP-BR | $18,601,526 | $8,601,526 | $6,881,221 | $1,720,305 | |
2027 | 613921 | Boston Region | Boston | BOSTON- BRIDGE DECK PRESERVATION OF B-16-259 AND B-16-260 ON I-93 | 6 | HIP-BR | $21,000,000 | $6,463,083 | $5,170,466 | $1,292,617 | |
Section 2A / Federal Aid Funded State Prioritized Reliability Projects | $62,227,612 | $55,680,052 | $6,547,560 | ||||||||
Safety Improvements | $21,138,181 | $19,024,363 | $2,113,818 | ||||||||
2027 | 609532 | Boston Region | Chelsea | CHELSEA- TARGETED SAFETY IMPROVEMENTS AND RELATED WORK ON BROADWAY, FROM WILLIAMS STREET TO CITY HALL AVENUE | 6 | HSIP | $10,804,213 | $10,804,213 | $9,723,792 | $1,080,421 | |
2027 | 611954 | Boston Region | Boston | BOSTON- GUIDE AND TRAFFIC SIGN REPLACEMENT ON I-90/I-93 WITHIN CENTRAL ARTERY/TUNNEL SYSTEM | 6 | HSIP | $2,333,968 | $2,333,968 | $2,100,571 | $233,397 | |
2027 | 612599 | Boston Region | Lynn | LYNN- TARGETED SAFETY AND MULTIMODAL IMPROVEMENTS (PLAYBOOK PRIORITY CORRIDORS) | 4 | VUS | $16,729,418 | $1,000,000 | $900,000 | $100,000 | |
2027 | 612599 | Boston Region | Lynn | LYNN- TARGETED SAFETY AND MULTIMODAL IMPROVEMENTS (PLAYBOOK PRIORITY CORRIDORS) | 4 | HSIP | $16,729,418 | $7,000,000 | $6,300,000 | $700,000 | |
Highway Resiliency Improvement Program | $3,247,991 | $2,598,393 | $649,598 | ||||||||
2027 | 613099 | Boston Region | Boston | BOSTON- SLOPE STABILIZATION AND RELATED WORK ON I-93 | 6 | PRCT | $3,247,991 | $3,247,991 | $2,598,393 | $649,598 | |
Interstate Pavement | $37,841,440 | $34,057,296 | $3,784,144 | ||||||||
2027 | 613318 | Boston Region | Multiple | BURLINGTON- WOBURN- INTERSTATE PAVEMENT PRESERVATION AND RELATED WORK ON I-95 | 4 | NHPP-I | $8,790,600 | $8,790,600 | $7,911,540 | $879,060 | |
2027 | 613343 | Boston Region | Foxborough | FOXBOROUGH - INTERSTATE PAVEMENT PRESERVATION AND RELATED WORK ON I-95 | 5 | NHPP-I | $14,399,840 | $14,399,840 | $12,959,856 | $1,439,984 | |
2027 | 613382 | Boston Region | Multiple | DEDHAM- NEEDHAM- INTERSTATE PAVEMENT PRESERVATION AND RELATED WORK ON I-95 | 6 | NHPP-I | $14,651,000 | $14,651,000 | $13,185,900 | $1,465,100 | |
Section 2B / Federal Aid Funded State Prioritized Modernization Projects | $43,530,679 | $37,039,809 | $6,490,870 | ||||||||
Roadway Reconstruction | $26,094,999 | $22,318,740 | $3,776,259 | ||||||||
2027 | 607977 | Boston Region | Multiple | HOPKINTON- WESTBOROUGH- RECONSTRUCTION OF I-90/I-495 INTERCHANGE | 3 | NFP-I | $300,942,837 | $14,427,409 | $12,984,668 | $1,442,741 | |
2027 | 612990 | Boston Region | Salem | SALEM- RECONSTRUCTION OF BRIDGE STREET (ROUTE 107), FROM FLINT STREET TO 150 FEET WEST OF WASHINGTON STREET | 4 | NHPP | $11,667,590 | $11,667,590 | $9,334,072 | $2,333,518 | |
Safe Routes to School | $7,273,098 | $5,818,478 | $1,454,620 | ||||||||
2027 | 612001 | Boston Region | Medford | MEDFORD- MILTON FULLER ROBERTS ELEMENTARY SCHOOL (SRTS) | 4 | TAP | $1,186,065 | $1,186,065 | $948,852 | $237,213 | |
2027 | 612100 | Boston Region | Revere | REVERE- IMPROVEMENTS AT BEACHMONT VETERANS ELEMENTARY (SRTS) | 4 | TAP | $801,656 | $801,656 | $641,325 | $160,331 | |
2027 | 612804 | Boston Region | Dedham | DEDHAM- IMPROVEMENTS AT AVERY ELEMENTARY (SRTS) | 6 | TAP | $2,566,884 | $2,566,884 | $2,053,507 | $513,377 | |
2027 | 612816 | Boston Region | Brookline | BROOKLINE- IMPROVEMENTS AT WILLIAM H. LINCOLN SCHOOL (SRTS) | 6 | TAP | $1,066,511 | $1,066,511 | $853,209 | $213,302 | |
2027 | 612894 | Boston Region | Framingham | FRAMINGHAM- IMPROVEMENTS AT HARMONY GROVE ELEMENTARY SCHOOL (SRTS) | 3 | TAP | $1,651,983 | $1,651,982 | $1,321,586 | $330,396 | |
Intersection Improvements | $6,225,252 | $5,602,727 | $622,525 | ||||||||
2027 | 613121 | Boston Region | Everett | EVERETT- TARGETED MULTI-MODAL AND SAFETY IMPROVEMENTS ON ROUTE 16 (DESIGN ONLY) | 4 | HSIP | $10,139,293 | $6,225,252 | $5,602,727 | $622,525 | |
Freight | $3,937,330 | $3,299,864 | $637,466 | ||||||||
2027 | 613121 | Boston Region | Everett | EVERETT- TARGETED MULTI-MODAL AND SAFETY IMPROVEMENTS ON ROUTE 16 (DESIGN ONLY) | 4 | NFP | $10,139,293 | $2,437,330 | $1,949,864 | $487,466 | |
2027 | S13209 | Boston Region | DESIGN WORK ON I-95 IMPROVEMENT WITHIN READING AND LYNNFIELD | 4 | NFP-I | $1,500,000 | $1,500,000 | $1,350,000 | $150,000 | ||
Section 2C / Federal Aid Funded State Prioritized Expansion Projects | $14,042,244 | $11,233,795 | $2,808,449 | ||||||||
Bicycle and Pedestrian | $14,042,244 | $11,233,795 | $2,808,449 | ||||||||
2027 | 610680 | Boston Region | Natick | NATICK- LAKE COCHITUATE PATH | 3 | CMAQ | $6,084,913 | $6,084,913 | $4,867,930 | $1,216,983 | |
2027 | 612523 | Boston Region | Revere | REVERE- STATE ROAD BEACHMONT CONNECTOR | 4 | CMAQ | $7,957,331 | $7,957,331 | $6,365,865 | $1,591,466 | |
Section 3B / Non-Federal Aid Funded | $154,497,567 | $0 | $154,497,567 | ||||||||
Bridge On-system Non-NHS | $73,250,859 | $0 | $73,250,859 | ||||||||
2027 | 606901 | Boston Region | Boston | BOSTON- BRIDGE REPLACEMENT, B-16-109, RIVER STREET BRIDGE OVER MBTA/AMTRAK | 6 | NGBP | $15,711,888 | $15,711,888 | $0 | $15,711,888 | |
2027 | 608952 | Boston Region | Chelsea | CHELSEA- BRIDGE SUPERSTRUCTURE REPLACEMENT C-09-013, WASHINGTON AVENUE, CARTER STREET & COUNTY ROAD/ROUTE 1 | 6 | NGBP | $17,099,395 | $22,217,165 | $0 | $22,217,165 | |
2027 | 612173 | Boston Region | Bellingham | BELLINGHAM- BRIDGE REPLACEMENT, B-06-022, MAPLE STREET OVER I-495 | 3 | NGBP | $12,562,146 | $12,562,146 | $0 | $12,562,146 | |
2027 | 612178 | Boston Region | Natick | NATICK- BRIDGE REPLACEMENT, N-03-010, SPEEN STREET OVER RR MBTA/CSX | 3 | NGBP | $10,188,872 | $10,188,872 | $0 | $10,188,872 | |
2027 | 612196 | Boston Region | Braintree | BRAINTREE- BRIDGE REPLACEMENT, B-21-067, JW MAHER HIGHWAY OVER MONATIQUOT RIVER | 6 | NGBP | $12,570,788 | $12,570,788 | $0 | $12,570,788 | |
Bridge On-system NHS | $81,246,708 | $0 | $81,246,708 | ||||||||
2027 | 607684 | Boston Region | Braintree | BRAINTREE- BRIDGE REPLACEMENT, B-21-017, WASHINGTON STREET (ST 37) OVER MBTA/CSX RAILROAD | 6 | NGBP | $28,564,767 | $26,818,168 | $0 | $26,818,168 | |
2027 | 612028 | Boston Region | Stoneham | STONEHAM- BRIDGE REPLACEMENT, S-27-006 (2L2), (ST 28) FELLSWAY WEST OVER I-93 | 4 | NGBP | $39,221,761 | $39,221,761 | $0 | $39,221,761 | |
2027 | 612182 | Boston Region | Newton | NEWTON- BRIDGE REPLACEMENT, N-12-040, BOYLSTON STREET OVER GREEN LINE D | 6 | NGBP | $15,206,778 | $15,206,778 | $0 | $15,206,778 | |
2027 | 612496 | Boston Region | Somerville | SOMERVILLE- BRIDGE PRESERVATION, S-17-031, I-93 (NB & SB) FROM ROUTE 28 TO TEMPLE STREET (PHASE 2) | 4 | NGBP | $217,509,198 | $1 | $0 | $1 | |
Federal Fiscal Year 2028 | $776,082,023 | $623,607,249 | $152,474,774 | ||||||||
Section 1A / Regionally Prioritized Projects | $156,604,600 | $126,441,573 | $30,163,027 | ||||||||
Roadway Reconstruction | $130,709,255 | $105,217,404 | $25,491,851 | ||||||||
2028 | 605743 | Boston Region | Ipswich | IPSWICH- RESURFACING & RELATED WORK ON CENTRAL & SOUTH MAIN STREETS | 4 | STBG | $14,456,975 | $7,837,408 | $6,269,926 | $1,567,482 | |
2028 | 605743 | Boston Region | Ipswich | IPSWICH- RESURFACING & RELATED WORK ON CENTRAL & SOUTH MAIN STREETS | 4 | TAP | $14,456,975 | $1,197,846 | $958,277 | $239,569 | |
2028 | 607981 | Boston Region | Somerville | SOMERVILLE- MCGRATH BOULEVARD CONSTRUCTION | 4 | NHPP | $128,385,573 | $28,075,573 | $22,460,458 | $5,615,115 | |
2028 | 607981 | Boston Region | Somerville | SOMERVILLE- MCGRATH BOULEVARD CONSTRUCTION | 4 | TAP | $128,385,573 | $5,000,000 | $4,000,000 | $1,000,000 | |
2028 | 608158 | Boston Region | Multiple | WESTWOOD- NORWOOD- RECONSTRUCTION OF CANTON STREET TO UNIVERSITY DRIVE, INCLUDING REHAB OF N-25-032=W-31-018 | 6 | CMAQ | $22,038,602 | $4,000,000 | $3,200,000 | $800,000 | |
2028 | 608158 | Boston Region | Multiple | WESTWOOD- NORWOOD- RECONSTRUCTION OF CANTON STREET TO UNIVERSITY DRIVE, INCLUDING REHAB OF N-25-032=W-31-018 | 6 | STBG | $22,038,602 | $8,038,602 | $6,430,882 | $1,607,720 | |
2028 | 608954 | Boston Region | Weston | WESTON- RECONSTRUCTION ON ROUTE 30 | 6 | STBG | $19,999,712 | $14,999,712 | $11,999,770 | $2,999,942 | |
2028 | 608954 | Boston Region | Weston | WESTON- RECONSTRUCTION ON ROUTE 30 | 6 | TAP | $19,999,712 | $5,000,000 | $4,000,000 | $1,000,000 | |
2028 | 609252 | Boston Region | Lynn | LYNN- REHABILITATION OF ESSEX STREET | 4 | CMAQ | $23,567,554 | $5,000,000 | $4,000,000 | $1,000,000 | |
2028 | 609252 | Boston Region | Lynn | LYNN- REHABILITATION OF ESSEX STREET | 4 | HSIP | $23,567,554 | $4,000,000 | $3,600,000 | $400,000 | |
2028 | 609252 | Boston Region | Lynn | LYNN- REHABILITATION OF ESSEX STREET | 4 | STBG | $23,567,554 | $4,567,554 | $3,654,043 | $913,511 | |
2028 | 610545 | Boston Region | Wakefield | WAKEFIELD- MAIN STREET RECONSTRUCTION | 4 | NHPP | $28,492,560 | $9,492,560 | $7,594,048 | $1,898,512 | |
2028 | 610545 | Boston Region | Wakefield | WAKEFIELD- MAIN STREET RECONSTRUCTION | 4 | STBG | $28,492,560 | $15,000,000 | $12,000,000 | $3,000,000 | |
2028 | 610545 | Boston Region | Wakefield | WAKEFIELD- MAIN STREET RECONSTRUCTION | 4 | TAP | $28,492,560 | $4,000,000 | $3,200,000 | $800,000 | |
2028 | 610932 | Boston Region | Brookline | BROOKLINE- REHABILITATION OF WASHINGTON STREET | 6 | HSIP | $27,959,721 | $2,500,000 | $2,250,000 | $250,000 | |
2028 | 610932 | Boston Region | Brookline | BROOKLINE- REHABILITATION OF WASHINGTON STREET | 6 | STBG | $27,959,721 | $10,000,000 | $8,000,000 | $2,000,000 | |
2028 | S12820 | Boston Region | BOSTON REGION - BIKESHARE SUPPORT SET ASIDE | STBG | $8,000,000 | $2,000,000 | $1,600,000 | $400,000 | |||
Railroad Crossings | $1,269,327 | $1,269,327 | $0 | ||||||||
2028 | 608436 | Boston Region | Ashland | ASHLAND- REHABILITATION AND RAIL CROSSING IMPROVEMENTS ON CHERRY STREET | 3 | RRHE | $1,269,327 | $1,269,327 | $1,269,327 | $0 | |
Bicycle and Pedestrian | $11,085,739 | $8,868,591 | $2,217,148 | ||||||||
2028 | 610691 | Boston Region | Natick | NATICK- COCHITUATE RAIL TRAIL EXTENSION, FROM MBTA STATION TO MECHANIC STREET | 3 | STBG | $11,085,739 | $11,085,739 | $8,868,591 | $2,217,148 | |
Safety Improvements | $2,540,279 | $2,286,251 | $254,028 | ||||||||
2028 | 610932 | Boston Region | Brookline | BROOKLINE- REHABILITATION OF WASHINGTON STREET | 6 | VUS | $27,959,721 | $2,540,279 | $2,286,251 | $254,028 | |
Flex to FTA | $6,000,000 | $4,800,000 | $1,200,000 | ||||||||
2028 | S12113 | Boston Region | BOSTON REGION - TRANSIT TRANSFORMATION PROGRAM | CMAQ | $19,500,000 | $6,000,000 | $4,800,000 | $1,200,000 | |||
Transit Grant Program | $2,000,000 | $1,600,000 | $400,000 | ||||||||
2028 | S12124 | Boston Region | Multiple | BOSTON REGION - COMMUNITY CONNECTIONS PROGRAM | CMAQ | $9,036,193 | $2,000,000 | $1,600,000 | $400,000 | ||
Roadway Improvements | $3,000,000 | $2,400,000 | $600,000 | ||||||||
2028 | S13145 | Boston Region | BOSTON REGION PROJECT DESIGN SET-ASIDE | STBG | $11,000,000 | $3,000,000 | $2,400,000 | $600,000 | |||
Section 1B / Earmark or Discretionary Grant Funded Projects | $412,809,081 | $330,247,265 | $82,561,816 | ||||||||
Bridge On-system NHS | $347,600,558 | $278,080,446 | $69,520,112 | ||||||||
2028 | 604564 | Boston Region | Maynard | MAYNARD- BRIDGE REPLACEMENT, M-10-004, ROUTE 62 (MAIN STREET) OVER THE ASSABET RIVER | 3 | HIP-BR | $8,410,036 | $8,410,036 | $6,728,029 | $1,682,007 | |
2028 | 606728 | Boston Region | Boston | BOSTON- BRIDGE REPLACEMENT B-16-365, STORROW DRIVE OVER BOWKER RAMPS | 6 | HIP-BR | $108,054,000 | $108,054,000 | $86,443,200 | $21,610,800 | |
2028 | 608396 | Boston Region | Multiple | LYNN- REVERE- BRIDGE RECONSTRUCTION, L-18-015=R-05-008, ROUTE 1A OVER SAUGUS RIVER | 4 | HIP-BR | $151,853,184 | $111,853,184 | $89,482,547 | $22,370,637 | |
2028 | 611987 | Boston Region | Cambridge | CAMBRIDGE- BRIDGE REPLACEMENT, C-01-026, MEMORIAL DRIVE OVER BROOKLINE STREET | 6 | HIP-BR | $49,283,338 | $49,283,338 | $39,426,670 | $9,856,668 | |
2028 | 612496 | Boston Region | Somerville | SOMERVILLE- BRIDGE PRESERVATION, S-17-031, I-93 (NB & SB) FROM ROUTE 28 TO TEMPLE STREET (PHASE 2) | 4 | HIP-BR | $217,509,198 | $70,000,000 | $56,000,000 | $14,000,000 | |
Bridge On-System NHS NB | $38,087,203 | $30,469,762 | $7,617,441 | ||||||||
2028 | 612075 | Boston Region | Salem | SALEM- BRIDGE REPLACEMENT, S-01-024, JEFFERSON AVENUE OVER PARALLEL STREET | 4 | HIP-BR | $4,562,806 | $4,562,806 | $3,650,245 | $912,561 | |
2028 | 612519 | Boston Region | Boston | BOSTON- BRIDGE REPLACEMENT, B-16-165, BLUE HILL AVENUE OVER RAILROAD | 6 | HIP-BR | $76,704,381 | $33,524,397 | $26,819,518 | $6,704,879 | |
Bridge Systematic Maintenance NB | $27,121,320 | $21,697,056 | $5,424,264 | ||||||||
2028 | 613275 | Boston Region | Multiple | BEVERLY- BURLINGTON- DANVERS- GLOUCESTER- WOBURN- BRIDGE PRESERVATION AT 9 BRIDGES CARRYING STATE ROUTE 128 | 4 | HIP-BR | $18,121,320 | $18,121,320 | $14,497,056 | $3,624,264 | |
2028 | 613921 | Boston Region | Boston | BOSTON- BRIDGE DECK PRESERVATION OF B-16-259 AND B-16-260 ON I-93 | 6 | HIP-BR | $21,000,000 | $9,000,000 | $7,200,000 | $1,800,000 | |
Section 2A / Federal Aid Funded State Prioritized Reliability Projects | $171,629,061 | $137,553,809 | $34,075,252 | ||||||||
Bridge On-system Non-NHS | $40,000,000 | $32,000,000 | $8,000,000 | ||||||||
2028 | 605276 | Boston Region | Multiple | BEVERLY- SALEM- BRIDGE REPLACEMENT, B-11-005=S-01-013, KERNWOOD AVENUE OVER DANVERS RIVER AND B-11-001, BRIDGE STREET OVER BASS RIVER (HALL-WHITAKER DRAWBRIDGE) | 4 | NHPP | $438,752,268 | $40,000,000 | $32,000,000 | $8,000,000 | |
Bridge On-system NHS | $117,870,646 | $94,296,517 | $23,574,129 | ||||||||
2028 | 606449 | Boston Region | Cambridge | CAMBRIDGE- BRIDGE REPLACEMENT, C-01-008, FIRST STREET AND C-01-040, LAND BOULEVARD OVER BROAD CANAL | 6 | NHPP-PEN | $38,727,023 | $24,817,222 | $19,853,778 | $4,963,444 | |
2028 | 610782 | Boston Region | Multiple | DANVERS- MIDDLETON- BRIDGE REPLACEMENT, D-03-009=M-20-005, ANDOVER STREET (SR 114) OVER IPSWICH RIVER | 4 | NHPP | $25,953,750 | $25,953,750 | $20,763,000 | $5,190,750 | |
2028 | 613124 | Boston Region | Boston | BOSTON- DECK/SUPERSTRUCTURE REPLACEMENT, B-16-054 (4T2), BEACON STREET OVER I-90 (STRUCTURE 50, MILE 132.2) | 6 | NHPP-PEN | $39,378,666 | $39,378,666 | $31,502,933 | $7,875,733 | |
2028 | 613125 | Boston Region | Boston | BOSTON- DECK/SUPERSTRUCTURE REPLACEMENT OF BRIDGE B-16-051 (4T5), MASS AVENUE OVER I-90 & MBTA (STRUCTURE 54, MILE 132.84) | 6 | NHPP-PEN | $27,721,008 | $27,721,008 | $22,176,806 | $5,544,202 | |
Highway Resiliency Improvement Program | $11,252,815 | $9,002,252 | $2,250,563 | ||||||||
2028 | 613154 | Boston Region | Wellesley | WELLESLEY- DRAINAGE IMPROVEMENTS ALONG ROUTE 9 AND CULVERT REPLACEMENTS OVER BOULDER BROOK FOR FLOOD MITIGATION | 6 | PRCT | $11,252,815 | $11,252,815 | $9,002,252 | $2,250,563 | |
Safety Improvements | $2,505,600 | $2,255,040 | $250,560 | ||||||||
2028 | 613166 | Boston Region | Acton | ACTON- SAFETY IMPROVEMENTS AT ROUTE 2A/119 (GREAT ROAD) | 3 | HSIP | $2,140,991 | $2,505,600 | $2,255,040 | $250,560 | |
Section 2B / Federal Aid Funded State Prioritized Modernization Projects | $20,354,591 | $17,616,852 | $2,737,739 | ||||||||
Intersection Improvements | $13,331,795 | $11,998,616 | $1,333,180 | ||||||||
2028 | 610665 | Boston Region | Stoneham | STONEHAM- INTERSECTION IMPROVEMENTS AT ROUTE 28 (MAIN STREET), NORTH BORDER ROAD AND SOUTH STREET | 4 | HSIP | $6,618,858 | $6,618,858 | $5,956,972 | $661,886 | |
2028 | 610676 | Boston Region | Wrentham | WRENTHAM- INTERSECTION IMPROVEMENTS ON ROUTE 1A AT NORTH AND WINTER STREET | 5 | HSIP | $6,712,937 | $6,712,937 | $6,041,643 | $671,294 | |
Safe Routes to School | $7,022,796 | $5,618,237 | $1,404,559 | ||||||||
2028 | 612884 | Boston Region | Chelsea | CHELSEA- IMPROVEMENTS AT MARY C. BURKE ELEMENTARY (SRTS) | 6 | TAP | $3,524,272 | $3,524,272 | $2,819,418 | $704,854 | |
2028 | 613477 | Boston Region | Holliston | HOLLISTON- LINDEN STREET IMPROVEMENTS AT ROBERT ADAMS MIDDLE SCHOOL (SRTS) | 3 | TAP | $1,012,500 | $1,012,500 | $810,000 | $202,500 | |
2028 | 613564 | Boston Region | Reading | READING- OAKLAND ROAD AT READING MEMORIAL HIGH SCHOOL AND COOLIDGE MIDDLE SCHOOL (SRTS) | 4 | TAP | $2,486,024 | $2,486,024 | $1,988,819 | $497,205 | |
Section 2C / Federal Aid Funded State Prioritized Expansion Projects | $14,684,687 | $11,747,750 | $2,936,937 | ||||||||
Bicycle and Pedestrian | $14,684,687 | $11,747,750 | $2,936,937 | ||||||||
2028 | 610660 | Boston Region | Multiple | SUDBURY- WAYLAND- MASS CENTRAL RAIL TRAIL (MCRT) | 3 | CMAQ | $6,583,786 | $3,916,363 | $3,133,090 | $783,273 | |
2028 | 612607 | Boston Region | Danvers | DANVERS- RAIL TRAIL WEST EXTENSION (PHASE 3) | 4 | CMAQ | $3,711,150 | $3,711,150 | $2,968,920 | $742,230 | |
2028 | 613082 | Boston Region | Medford | MEDFORD- WELLINGTON GREENWAY CONSTRUCTION (PHASE IV) | 4 | CMAQ | $2,091,712 | $2,091,712 | $1,673,370 | $418,342 | |
2028 | 613164 | Boston Region | Multiple | BOSTON- MILTON- NEW BRIDGE AND SHARED-USE PATH CONSTRUCTION OVER NEPONSET RIVER AT OSCEOLA STREET | 6 | CMAQ | $4,965,462 | $4,965,462 | $3,972,370 | $993,092 | |
Section 3B / Non-Federal Aid Funded | $3 | $0 | $3 | ||||||||
Bridge On-system NHS | $1 | $0 | $1 | ||||||||
2028 | 604564 | Boston Region | Maynard | MAYNARD- BRIDGE REPLACEMENT, M-10-004, ROUTE 62 (MAIN STREET) OVER THE ASSABET RIVER | 3 | NGBP | $8,410,036 | $1 | $0 | $1 | |
Bridge On-system Non-NHS | $2 | $0 | $2 | ||||||||
2028 | 605276 | Boston Region | Multiple | BEVERLY- SALEM- BRIDGE REPLACEMENT, B-11-005=S-01-013, KERNWOOD AVENUE OVER DANVERS RIVER AND B-11-001, BRIDGE STREET OVER BASS RIVER (HALL-WHITAKER DRAWBRIDGE) | 4 | NGBP | $438,752,268 | $1 | $0 | $1 | |
2028 | 608397 | Boston Region | Gloucester | GLOUCESTER- BRIDGE RECONSTRUCTION, G-05-002, WESTERN AVENUE OVER BLYNMAN CANAL | 4 | NGBP | $60,480,000 | $1 | $0 | $1 | |
Federal Fiscal Year 2029 | $599,225,191 | $486,065,261 | $113,159,931 | ||||||||
Section 1A / Regionally Prioritized Projects | $155,699,104 | $125,788,477 | $29,910,627 | ||||||||
Roadway Reconstruction | $117,296,536 | $94,637,229 | $22,659,307 | ||||||||
2029 | 606226 | Boston Region | Boston | BOSTON- RECONSTRUCTION OF RUTHERFORD AVENUE, FROM CITY SQUARE TO SULLIVAN SQUARE | 6 | NHPP | $176,570,937 | $15,500,000 | $12,400,000 | $3,100,000 | |
2029 | 606226 | Boston Region | Boston | BOSTON- RECONSTRUCTION OF RUTHERFORD AVENUE, FROM CITY SQUARE TO SULLIVAN SQUARE | 6 | STBG | $176,570,937 | $5,000,000 | $4,000,000 | $1,000,000 | |
2029 | 606226 | Boston Region | Boston | BOSTON- RECONSTRUCTION OF RUTHERFORD AVENUE, FROM CITY SQUARE TO SULLIVAN SQUARE | 6 | TAP | $176,570,937 | $3,000,000 | $2,400,000 | $600,000 | |
2029 | 607981 | Boston Region | Somerville | SOMERVILLE- MCGRATH BOULEVARD CONSTRUCTION | 4 | NHPP | $128,385,573 | $20,000,000 | $16,000,000 | $4,000,000 | |
2029 | 607981 | Boston Region | Somerville | SOMERVILLE- MCGRATH BOULEVARD CONSTRUCTION | 4 | TAP | $128,385,573 | $8,518,065 | $6,814,452 | $1,703,613 | |
2029 | 608158 | Boston Region | Multiple | WESTWOOD- NORWOOD- RECONSTRUCTION OF CANTON STREET TO UNIVERSITY DRIVE, INCLUDING REHAB OF N-25-032=W-31-018 | 6 | STBG | $22,038,602 | $10,000,000 | $8,000,000 | $2,000,000 | |
2029 | 609246 | Boston Region | Lynn | LYNN- REHABILITATION OF WESTERN AVENUE (ROUTE 107) | 4 | NHPP | $45,897,600 | $10,000,000 | $8,000,000 | $2,000,000 | |
2029 | 609252 | Boston Region | Lynn | LYNN- REHABILITATION OF ESSEX STREET | 4 | CMAQ | $23,567,554 | $5,000,000 | $4,000,000 | $1,000,000 | |
2029 | 609252 | Boston Region | Lynn | LYNN- REHABILITATION OF ESSEX STREET | 4 | HSIP | $23,567,554 | $1,500,000 | $1,350,000 | $150,000 | |
2029 | 609252 | Boston Region | Lynn | LYNN- REHABILITATION OF ESSEX STREET | 4 | STBG | $23,567,554 | $3,500,000 | $2,800,000 | $700,000 | |
2029 | 610662 | Boston Region | Woburn | WOBURN- ROADWAY AND INTERSECTION IMPROVEMENTS AT WOBURN COMMON, ROUTE 38 (MAIN STREET), WINN STREET, PLEASANT STREET AND MONTVALE AVENUE | 4 | HSIP | $18,026,400 | $4,000,000 | $3,600,000 | $400,000 | |
2029 | 610662 | Boston Region | Woburn | WOBURN- ROADWAY AND INTERSECTION IMPROVEMENTS AT WOBURN COMMON, ROUTE 38 (MAIN STREET), WINN STREET, PLEASANT STREET AND MONTVALE AVENUE | 4 | STBG | $18,026,400 | $5,335,200 | $4,268,160 | $1,067,040 | |
2029 | 610932 | Boston Region | Brookline | BROOKLINE- REHABILITATION OF WASHINGTON STREET | 6 | HSIP | $27,959,721 | $2,500,000 | $2,250,000 | $250,000 | |
2029 | 610932 | Boston Region | Brookline | BROOKLINE- REHABILITATION OF WASHINGTON STREET | 6 | STBG | $27,959,721 | $7,919,442 | $6,335,554 | $1,583,888 | |
2029 | 612738 | Boston Region | Ipswich | IPSWICH- ARGILLA ROAD ROADWAY RECONSTRUCTION | 4 | STBG | $5,183,829 | $5,183,829 | $4,147,063 | $1,036,766 | |
2029 | 612963 | Boston Region | Bellingham | BELLINGHAM- ROADWAY REHABILITATION OF ROUTE 126 (HARTFORD ROAD), FROM 800 NORTH OF THE I-495 NB OFF RAMP TO MEDWAY TL, INCLUDING B-06-017 | 3 | NHPP | $15,848,000 | $8,340,000 | $6,672,000 | $1,668,000 | |
2029 | S12820 | Boston Region | BOSTON REGION - BIKESHARE SUPPORT SET ASIDE | STBG | $8,000,000 | $2,000,000 | $1,600,000 | $400,000 | |||
Safety Improvements | $4,291,935 | $3,862,742 | $429,194 | ||||||||
2029 | 607981 | Boston Region | Somerville | SOMERVILLE- MCGRATH BOULEVARD CONSTRUCTION | 4 | HSIP | $128,385,573 | $1,791,935 | $1,612,742 | $179,194 | |
2029 | 610932 | Boston Region | Brookline | BROOKLINE- REHABILITATION OF WASHINGTON STREET | 6 | VUS | $27,959,721 | $2,500,000 | $2,250,000 | $250,000 | |
Bicycle and Pedestrian | $22,110,633 | $17,688,506 | $4,422,127 | ||||||||
2029 | 610666 | Boston Region | Swampscott | SWAMPSCOTT- RAIL TRAIL CONSTRUCTION | 4 | CMAQ | $8,624,000 | $6,992,000 | $5,593,600 | $1,398,400 | |
2029 | 610666 | Boston Region | Swampscott | SWAMPSCOTT- RAIL TRAIL CONSTRUCTION | 4 | TAP | $8,624,000 | $1,632,000 | $1,305,600 | $326,400 | |
2029 | 613088 | Boston Region | Malden | MALDEN- SPOT POND BROOK GREENWAY | 4 | CMAQ | $4,858,127 | $3,000,000 | $2,400,000 | $600,000 | |
2029 | 613088 | Boston Region | Malden | MALDEN- SPOT POND BROOK GREENWAY | 4 | TAP | $4,858,127 | $1,858,127 | $1,486,502 | $371,625 | |
2029 | 613319 | Boston Region | Multiple | SUDBURY- FRAMINGHAM- BIKE PATH CONSTRUCTION OF BRUCE FREEMAN RAIL TRAIL, FROM THE SUDBURY DIAMOND RAILROAD CROSSING TO EATON ROAD WEST | 3 | CMAQ | $8,628,506 | $8,628,506 | $6,902,805 | $1,725,701 | |
Flex to FTA | $6,500,000 | $5,200,000 | $1,300,000 | ||||||||
2029 | S12113 | Boston Region | BOSTON REGION - TRANSIT TRANSFORMATION PROGRAM | CMAQ | $19,500,000 | $6,500,000 | $5,200,000 | $1,300,000 | |||
Transit Grant Program | $2,500,000 | $2,000,000 | $500,000 | ||||||||
2029 | S12124 | Boston Region | Multiple | BOSTON REGION - COMMUNITY CONNECTIONS PROGRAM | CMAQ | $9,036,193 | $2,500,000 | $2,000,000 | $500,000 | ||
Roadway Improvements | $3,000,000 | $2,400,000 | $600,000 | ||||||||
2029 | S13145 | Boston Region | BOSTON REGION PROJECT DESIGN SET-ASIDE | STBG | $11,000,000 | $3,000,000 | $2,400,000 | $600,000 | |||
Section 1B / Earmark or Discretionary Grant Funded Projects | $164,618,125 | $131,694,500 | $32,923,625 | ||||||||
Bridge On-system NHS | $164,618,125 | $131,694,500 | $32,923,625 | ||||||||
2029 | 608396 | Boston Region | Multiple | LYNN- REVERE- BRIDGE RECONSTRUCTION, L-18-015=R-05-008, ROUTE 1A OVER SAUGUS RIVER | 4 | HIP-BR | $151,853,184 | $40,000,000 | $32,000,000 | $8,000,000 | |
2029 | 612496 | Boston Region | Somerville | SOMERVILLE- BRIDGE PRESERVATION, S-17-031, I-93 (NB & SB) FROM ROUTE 28 TO TEMPLE STREET (PHASE 2) | 4 | HIP-BR | $217,509,198 | $70,000,000 | $56,000,000 | $14,000,000 | |
2029 | 613130 | Boston Region | Boston | BOSTON- BRIDGE REPLACEMENT, B-16-033, MORRISSEY BOULEVARD OVER DORCHESTER BAY | 6 | HIP-BR | $174,618,125 | $54,618,125 | $43,694,500 | $10,923,625 | |
Section 2A / Federal Aid Funded State Prioritized Reliability Projects | $200,924,785 | $163,493,908 | $37,430,877 | ||||||||
Bridge On-system Non-NHS | $100,000,000 | $80,000,000 | $20,000,000 | ||||||||
2029 | 605276 | Boston Region | Multiple | BEVERLY- SALEM- BRIDGE REPLACEMENT, B-11-005=S-01-013, KERNWOOD AVENUE OVER DANVERS RIVER AND B-11-001, BRIDGE STREET OVER BASS RIVER (HALL-WHITAKER DRAWBRIDGE) | 4 | NHPP | $438,752,268 | $100,000,000 | $80,000,000 | $20,000,000 | |
Bridge On-system NHS | $63,068,169 | $50,454,535 | $12,613,634 | ||||||||
2029 | 606449 | Boston Region | Cambridge | CAMBRIDGE- BRIDGE REPLACEMENT, C-01-008, FIRST STREET AND C-01-040, LAND BOULEVARD OVER BROAD CANAL | 6 | NHPP-PEN | $38,727,023 | $13,909,801 | $11,127,841 | $2,781,960 | |
2029 | 612634 | Boston Region | Somerville | SOMERVILLE- BRIDGE REPLACEMENT, S-17-024, ROUTE 28/MCGRATH HWY OVER SOMERVILLE AVE EXT & MBTA | 4 | NHPP-PEN | $93,854,208 | $49,158,368 | $39,326,694 | $9,831,674 | |
Safety Improvements | $11,312,000 | $10,180,800 | $1,131,200 | ||||||||
2029 | 610650 | Boston Region | Boston | BOSTON- SAFETY IMPROVEMENTS ON GALLIVAN BOULEVARD (ROUTE 203), FROM WASHINGTON STREET TO GRANITE AVENUE | 6 | HSIP | $6,440,000 | $6,440,000 | $5,796,000 | $644,000 | |
2029 | 612613 | Boston Region | Newton | NEWTON- INTERSECTION IMPROVEMENTS AT ROUTE 16 AND QUINOBEQUIN ROAD | 6 | HSIP | $4,872,000 | $4,872,000 | $4,384,800 | $487,200 | |
Non-Interstate Pavement | $10,315,816 | $8,252,653 | $2,063,163 | ||||||||
2029 | 612026 | Boston Region | Stoneham | STONEHAM- RESURFACING ON ROUTE 28 | 4 | NHPP | $1,896,496 | $1,896,496 | $1,517,197 | $379,299 | |
2029 | 612046 | Boston Region | Gloucester | GLOUCESTER- RESURFACING ON ROUTE 128 | 4 | NHPP | $4,399,920 | $4,399,920 | $3,519,936 | $879,984 | |
2029 | 613640 | Boston Region | Natick | NATICK- RESURFACING AND RELATED WORK ON ROUTE 9 | 3 | NHPP | $4,019,400 | $4,019,400 | $3,215,520 | $803,880 | |
Interstate Pavement | $16,228,800 | $14,605,920 | $1,622,880 | ||||||||
2029 | 613356 | Boston Region | Sharon | SHARON- INTERSTATE PAVEMENT PRESERVATION AND RELATED WORK ON I-95 | 5 | NHPP-I | $16,228,800 | $16,228,800 | $14,605,920 | $1,622,880 | |
Section 2B / Federal Aid Funded State Prioritized Modernization Projects | $61,690,634 | $52,054,341 | $9,636,293 | ||||||||
Intersection Improvements | $17,170,126 | $15,453,113 | $1,717,013 | ||||||||
2029 | 608052 | Boston Region | Norwood | NORWOOD- INTERSECTION & SIGNAL IMPROVEMENTS AT US 1 (PROVIDENCE HIGHWAY) & MORSE STREET | 5 | HSIP | $14,087,774 | $14,087,774 | $12,678,997 | $1,408,777 | |
2029 | 612616 | Boston Region | Milton | MILTON- INTERSECTION IMPROVEMENTS AT ROUTE 138 AND BRADLEE ROAD | 6 | HSIP | $3,082,352 | $3,082,352 | $2,774,117 | $308,235 | |
Freight | $9,848,216 | $8,863,394 | $984,822 | ||||||||
2029 | 609527 | Boston Region | Multiple | READING- STONEHAM- WAKEFIELD- IMPROVEMENTS ON I-95 (NB), FROM I-93 TO NORTH AVENUE | 4 | NFP-I | $9,848,216 | $9,848,216 | $8,863,394 | $984,822 | |
Roadway Reconstruction | $28,866,208 | $23,092,966 | $5,773,242 | ||||||||
2029 | 610543 | Boston Region | Multiple | REVERE- MALDEN- IMPROVEMENTS AT ROUTE 1 (NB) (PHASE 1) | 4 | NHPP | $9,430,400 | $9,430,400 | $7,544,320 | $1,886,080 | |
2029 | 612615 | Boston Region | Multiple | CANTON- MILTON- ROADWAY RECONSTRUCTION ON ROUTE 138, FROM ROYALL STREET TO DOLLAR LANE | 6 | NHPP | $19,435,808 | $19,435,808 | $15,548,646 | $3,887,162 | |
Safe Routes to School | $5,806,084 | $4,644,867 | $1,161,217 | ||||||||
2029 | 612889 | Boston Region | Sharon | SHARON- COTTAGE STREET SCHOOL IMPROVEMENTS (SRTS) | 5 | TAP | $4,258,649 | $4,258,649 | $3,406,919 | $851,730 | |
2029 | 613468 | Boston Region | Newton | NEWTON- IMPROVEMENTS AT PARKER STREET FOR THE OAK HILL MIDDLE SCHOOL (SRTS) | 6 | TAP | $1,547,435 | $1,547,435 | $1,237,948 | $309,487 | |
Section 2C / Federal Aid Funded State Prioritized Expansion Projects | $16,292,543 | $13,034,034 | $3,258,509 | ||||||||
Bicycle and Pedestrian | $16,292,543 | $13,034,034 | $3,258,509 | ||||||||
2029 | 612499 | Boston Region | Medford | MEDFORD- SOUTH MEDFORD CONNECTOR BIKE PATH | 4 | CMAQ | $7,903,743 | $7,903,743 | $6,322,994 | $1,580,749 | |
2029 | 613654 | Boston Region | Framingham | FRAMINGHAM- BIKE PATH CONSTRUCTION OF BRUCE FREEMAN RAIL TRAIL, FROM EATON ROAD WEST TO FROST STREET | 3 | CMAQ | $8,388,800 | $8,388,800 | $6,711,040 | $1,677,760 | |
Federal Fiscal Year 2030 | $521,225,746 | $419,428,776 | $101,796,971 | ||||||||
Section 1A / Regionally Prioritized Projects | $124,727,200 | $100,281,760 | $24,445,440 | ||||||||
Roadway Reconstruction | $112,227,200 | $90,281,760 | $21,945,440 | ||||||||
2030 | 606226 | Boston Region | Boston | BOSTON- RECONSTRUCTION OF RUTHERFORD AVENUE, FROM CITY SQUARE TO SULLIVAN SQUARE | 6 | NHPP | $176,570,937 | $25,500,000 | $20,400,000 | $5,100,000 | |
2030 | 606226 | Boston Region | Boston | BOSTON- RECONSTRUCTION OF RUTHERFORD AVENUE, FROM CITY SQUARE TO SULLIVAN SQUARE | 6 | STBG | $176,570,937 | $4,000,000 | $3,200,000 | $800,000 | |
2030 | 606226 | Boston Region | Boston | BOSTON- RECONSTRUCTION OF RUTHERFORD AVENUE, FROM CITY SQUARE TO SULLIVAN SQUARE | 6 | TAP | $176,570,937 | $4,000,000 | $3,200,000 | $800,000 | |
2030 | 607981 | Boston Region | Somerville | SOMERVILLE- MCGRATH BOULEVARD CONSTRUCTION | 4 | NHPP | $128,385,573 | $30,000,000 | $24,000,000 | $6,000,000 | |
2030 | 607981 | Boston Region | Somerville | SOMERVILLE- MCGRATH BOULEVARD CONSTRUCTION | 4 | TAP | $128,385,573 | $5,000,000 | $4,000,000 | $1,000,000 | |
2030 | 609246 | Boston Region | Lynn | LYNN- REHABILITATION OF WESTERN AVENUE (ROUTE 107) | 4 | HSIP | $45,897,600 | $5,000,000 | $4,500,000 | $500,000 | |
2030 | 609246 | Boston Region | Lynn | LYNN- REHABILITATION OF WESTERN AVENUE (ROUTE 107) | 4 | STBG | $45,897,600 | $10,000,000 | $8,000,000 | $2,000,000 | |
2030 | 610662 | Boston Region | Woburn | WOBURN- ROADWAY AND INTERSECTION IMPROVEMENTS AT WOBURN COMMON, ROUTE 38 (MAIN STREET), WINN STREET, PLEASANT STREET AND MONTVALE AVENUE | 4 | STBG | $18,026,400 | $8,691,200 | $6,952,960 | $1,738,240 | |
2030 | 612534 | Boston Region | Melrose | MELROSE- LEBANON STREET IMPROVEMENT PROJECT | 4 | CMAQ | $4,341,221 | $5,000,000 | $4,000,000 | $1,000,000 | |
2030 | 612534 | Boston Region | Melrose | MELROSE- LEBANON STREET IMPROVEMENT PROJECT | 4 | STBG | $4,341,221 | $3,528,000 | $2,822,400 | $705,600 | |
2030 | 612534 | Boston Region | Melrose | MELROSE- LEBANON STREET IMPROVEMENT PROJECT | 4 | TAP | $4,341,221 | $2,000,000 | $1,600,000 | $400,000 | |
2030 | 612963 | Boston Region | Bellingham | BELLINGHAM- ROADWAY REHABILITATION OF ROUTE 126 (HARTFORD ROAD), FROM 800 NORTH OF THE I-495 NB OFF RAMP TO MEDWAY TL, INCLUDING B-06-017 | 3 | NHPP | $15,848,000 | $7,508,000 | $6,006,400 | $1,501,600 | |
2030 | S12820 | Boston Region | BOSTON REGION - BIKESHARE SUPPORT SET ASIDE | STBG | $8,000,000 | $2,000,000 | $1,600,000 | $400,000 | |||
Flex to FTA | $7,000,000 | $5,600,000 | $1,400,000 | ||||||||
2030 | S12113 | Boston Region | BOSTON REGION - TRANSIT TRANSFORMATION PROGRAM | CMAQ | $19,500,000 | $7,000,000 | $5,600,000 | $1,400,000 | |||
Transit Grant Program | $2,500,000 | $2,000,000 | $500,000 | ||||||||
2030 | S12124 | Boston Region | Multiple | BOSTON REGION - COMMUNITY CONNECTIONS PROGRAM | CMAQ | $9,036,193 | $2,500,000 | $2,000,000 | $500,000 | ||
Roadway Improvements | $3,000,000 | $2,400,000 | $600,000 | ||||||||
2030 | S13145 | Boston Region | BOSTON REGION PROJECT DESIGN SET-ASIDE | STBG | $11,000,000 | $3,000,000 | $2,400,000 | $600,000 | |||
Section 1B / Earmark or Discretionary Grant Funded Projects | $188,200,465 | $150,560,372 | $37,640,093 | ||||||||
Bridge On-system Non-NHS NB | $20,691,268 | $16,553,014 | $4,138,254 | ||||||||
2030 | 608397 | Boston Region | Gloucester | GLOUCESTER- BRIDGE RECONSTRUCTION, G-05-002, WESTERN AVENUE OVER BLYNMAN CANAL | 4 | HIP-BR | $64,960,000 | $20,691,268 | $16,553,014 | $4,138,254 | |
Bridge On-system NHS | $167,509,197 | $134,007,358 | $33,501,839 | ||||||||
2030 | 612496 | Boston Region | Somerville | SOMERVILLE- BRIDGE PRESERVATION, S-17-031, I-93 (NB & SB) FROM ROUTE 28 TO TEMPLE STREET (PHASE 2) | 4 | HIP-BR | $217,509,198 | $57,509,197 | $46,007,358 | $11,501,839 | |
2030 | 613130 | Boston Region | Boston | BOSTON- BRIDGE REPLACEMENT, B-16-033, MORRISSEY BOULEVARD OVER DORCHESTER BAY | 6 | HIP-BR | $174,618,125 | $110,000,000 | $88,000,000 | $22,000,000 | |
Section 2A / Federal Aid Funded State Prioritized Reliability Projects | $170,039,815 | $136,853,427 | $33,186,388 | ||||||||
Bridge On-system Non-NHS | $100,000,000 | $80,000,000 | $20,000,000 | ||||||||
2030 | 605276 | Boston Region | Multiple | BEVERLY- SALEM- BRIDGE REPLACEMENT, B-11-005=S-01-013, KERNWOOD AVENUE OVER DANVERS RIVER AND B-11-001, BRIDGE STREET OVER BASS RIVER (HALL-WHITAKER DRAWBRIDGE) | 4 | NHPP | $438,752,268 | $100,000,000 | $80,000,000 | $20,000,000 | |
Non-Interstate Pavement | $17,128,224 | $13,702,579 | $3,425,645 | ||||||||
2030 | 608495 | Boston Region | Multiple | CONCORD- LEXINGTON- LINCOLN- RESURFACING AND RELATED WORK ON ROUTE 2A | 4 | NHPP | $5,067,399 | $5,067,399 | $4,053,919 | $1,013,480 | |
2030 | 612027 | Boston Region | Ipswich | IPSWICH- RESURFACING OF ROUTE 1A | 4 | NHPP | $2,195,025 | $2,195,025 | $1,756,020 | $439,005 | |
2030 | 613639 | Boston Region | Framingham | FRAMINGHAM- RESURFACING AND RELATED WORK ON ROUTE 9 | 3 | NHPP | $9,865,800 | $9,865,800 | $7,892,640 | $1,973,160 | |
Safety Improvements | $8,215,751 | $7,394,176 | $821,575 | ||||||||
2030 | 608498 | Boston Region | Multiple | QUINCY- BRAINTREE- RESURFACING AND RELATED WORK ON ROUTE 53 | 6 | HSIP | $11,911,069 | $1,000,000 | $900,000 | $100,000 | |
2030 | 610675 | Boston Region | Chelsea | CHELSEA- RECONSTRUCTION OF SPRUCE STREET, FROM EVERETT AVENUE TO WILLIAMS STREET | 6 | HSIP | $7,215,751 | $7,215,751 | $6,494,176 | $721,575 | |
Bridge On-system NHS | $44,695,840 | $35,756,672 | $8,939,168 | ||||||||
2030 | 612634 | Boston Region | Somerville | SOMERVILLE- BRIDGE REPLACEMENT, S-17-024, ROUTE 28/MCGRATH HWY OVER SOMERVILLE AVE EXT & MBTA | 4 | NHPP-PEN | $93,854,208 | $44,695,840 | $35,756,672 | $8,939,168 | |
Section 2B / Federal Aid Funded State Prioritized Modernization Projects | $23,526,266 | $19,947,616 | $3,578,650 | ||||||||
Intersection Improvements | $11,266,036 | $10,139,432 | $1,126,604 | ||||||||
2030 | 607748 | Boston Region | Acton | ACTON- INTERSECTION & SIGNAL IMPROVEMENTS ON SR 2 & SR 111 (MASSACHUSETTS AVENUE) AT PIPER ROAD & TAYLOR ROAD | 3 | HSIP | $11,266,036 | $11,266,036 | $10,139,432 | $1,126,604 | |
Roadway Reconstruction | $10,911,069 | $8,728,855 | $2,182,214 | ||||||||
2030 | 608498 | Boston Region | Multiple | QUINCY- BRAINTREE- RESURFACING AND RELATED WORK ON ROUTE 53 | 6 | NHPP | $11,911,069 | $10,911,069 | $8,728,855 | $2,182,214 | |
Accessibility Improvements | $1,349,161 | $1,079,329 | $269,832 | ||||||||
2030 | 613882 | Boston Region | Multiple | DISTRICT 4- ACCESSIBILITY IMPROVEMENTS AT MULTIPLE LOCATIONS (SOUTHERN PROJECT) | 4 | STBG | $1,349,161 | $1,349,161 | $1,079,329 | $269,832 | |
Section 2C / Federal Aid Funded State Prioritized Expansion Projects | $14,732,000 | $11,785,600 | $2,946,400 | ||||||||
Bicycle and Pedestrian | $14,732,000 | $11,785,600 | $2,946,400 | ||||||||
2030 | S13230 | Boston Region | WAKEFIELD - RAIL TRAIL CONSTRUCTION NORTHERN SEGMENT | CMAQ | $14,732,000 | $14,732,000 | $11,785,600 | $2,946,400 |