FFYs 2025-29 Transportation Improvement Program (TIP) Universe of Projects -FFY 2025-2029 Universe

This is a complex table that has not been optimized for screen–reading software. If you would like to request this table in a alternative format, please contact the Central Transportation Planning Staff (CTPS) via email at publicinfo@ctps.org

Projects grouped by MAPC subregion and by MPO Investment Program

This table contains unprogrammed projects in the Boston region that may be considered for evaluation in the FFYs 2025–29 TIP cycle. Not all projects listed in this table will be evaluated for funding in the FFYs 2025–29 TIP, as projects must be PRC approved and submit sufficient project documentation prior to scoring. The MPO has also established a policy to prioritize projects that have reached the 25% design submission stage for funding. This list is subject to change as more project information is received.

Key

  Evaluated for FFYs 202428 TIP
  New project in TIP universe for FFYs 2025-29 TIP
  In 2024–28 universe, not evaluated

 

Municipality Project Proponent Project Name PROJIS Design Status (as of 10/6/21) Year Added to Universe Cost Estimate Highway District Notes
Inner Core                
Complete Streets                
Boston Boston Reconstruction of Albany Street N/A Pre-PRC 2021 N/A 6  
Boston MassDOT Reconstruction on Gallivan Boulevard (Route 203), from Neponset Circle to East of Morton Street Intersection N/A PRC approved (2012)  2018 Outdated (Formerly $11,500,000) 6 Resulted from FFY 2012 Addressing Priority Corridors MPO Study.  Entirety of Gallivan.  A portion of this corridor is included in project 610650 for Safety Improvements, and is funded in FFY 2027 of the Statewide Highway Program.
Boston MassDOT Improvements on Morton Street (Route 203), from West of Gallivan Boulevard to Shea Circle 606897 PRC approved (2012)   2018 Outdated (Formerly $11,500,000) 6 Resulted from FFY 2012 Addressing Priority Corridors MPO Study.  Entirety of Morton from Gallivan to Arborway. Nearer term safety improvements proposed in 2027.
Boston Boston Roadway Improvements along Commonwealth Avenue (Route 30), from Alcorn Street to Warren/Kelton Streets (Phase 3 & Phase 4) 608449 25% submitted (9/28/2017) 2017 or earlier $31,036,006 6 Last scored for FFYs 2020–24 TIP.
Boston MassDOT Intersection & Signal Improvements at VFW Parkway and Spring Street 613282 25% Package Received - R1 (3/09/2022) 2022 $4,526,907 6 Scope of work is being reviewed between MassDOT, Boston, and Dedham.
Brookline Brookline Boylston Street (High Street to Brington Road) Complete Streets Improvements N/A Initiation 2022 $3,500,000 6 Pedestrian crossings, bike lanes, street trees. Design through Toole with some facilitation from MassDOT.  Three options were pushed through and endorsed by the Select Board. Town met with District 6 to run through this.  Should be in PRC soon.
Brookline Brookline Davis Street Path Restoration and Reconstruction of the Davis Street Path Bridge over MBTA N/A Initiation 2022 $12,000,000 6 Conceptual stage.  Brookline is investigating avenues to use federal discretionary grant funding to advance this project.  Potential for bundling with Boylston Street work above.
Chelsea Chelsea Reconstruction of Spruce Street, from Everett Avenue to Williams Street 610675 PRC approved (2019)   2019 $5,408,475 6  
Chelsea Chelsea Reconstruction of Everett Avenue and 3rd Street, from Broadway to Ash Street N/A Pre-PRC 2020 N/A 6  
Chelsea Chelsea Hawthorne Street Redesign (Park Street to Bellingham Street) N/A Initiation 2023 Design Only 6 Project design pilot candidate project.
Chelsea Chelsea Reconstruction of Marginal Street N/A Pre-PRC 2019 N/A 6  
Chelsea, Everett Everett Reconstruction of Vine and Third Street, from Chelsea Street to MBTA Station 613585 PRC Approved (10/12/2023) 2023 $5,654,870.15 4 Silver Line connection for pedestrian and bike.  Includes sidewalk extension and ADA ramp reconstruction.  Pavement reconstruction as well.
Lynn, Salem MassDOT Reconstruction of Route 107 608927 PRC approved (2017) 2020 $38,155,000 4  
Malden Malden Broadway Corridor Reconstruction 613244 PRC Approved (6/29/2023) 2022 $21,201,688 4  
Melrose Melrose Reconstruction of Lebanon Street, from Lynde Street to Malden City Line 612534 PRC approved (2/10/2022) 2020 $3,742,432 4  
Newton Newton Reconstruction of Washington Street, from Church Street to Chestnut Street N/A Pre-PRC 2020 N/A 6  
Revere Revere Reconstruction of Ocean Ave, Revere Street, and Revere Beach Boulevard N/A Pre-PRC 2020 N/A 4 Project at conceptual stage with schematics, needs full design - investigating roundabout.  Key East/West connection.  
Winthrop Winthrop Reconstruction & Improvements on Route 145 (Pleasant and Main Street Project) 609446 PRC approved (2019) 2019 $7,565,512 6  
Intersection Improvements                
Boston, Brookline Boston, Brookline Mountfort St. & Commonwealth Ave. Connection 608956 PRC approved (2017) 2018 $916,883 6 Preliminary design.  
Chelsea Chelsea Intersection Improvements at Everett Avenue and 3rd Street 613259 PRC Approved (7/6/2023) 2023 $2,078,681 6 Added via PRC notification email.  Likely to apply for funding in FFY25–29 TIP, 25% design expected to be complete within year.
Lynn, Saugus Lynn Intersection Safety Improvements at Boston Street at Hesper and Hamilton Streets N/A To be initiated 2023 $3,000,000 4 Based on 3/3/2023 meeting with Lynn.  May apply for design funding.
Medford Medford Intersection Improvements at Main Street and South Street 611974 PRC approved (2021) 2019 $8,498,000 4 Project location studied by CTPS. Priority for municipality.  Design is in progress, and eventually the City will work with MassDOT to fund construction.
Newton MassDOT Route 16 at Quinobequin Road 612613 PRC approved (2/10/2022) 2022 $4,350,000 6  
Quincy MassDOT Intersection Improvements at Route 3A (Southern Artery) and Broad Street 608569 PRC approved (2016) 2020 $2,900,000 6 Priority for District 6.
Quincy Quincy Intersection Improvements at Willard Street and Ricciuti Drive 610823 25% Package Received - R1 (1/27/2023) 2020 $1,145,580 6 25% design complete.  
Quincy Quincy Merrymount Parkway Phase II N/A Pre-PRC 2022 N/A 6 December PRC.  Intersection improvement at Merrymount Parkway and Furnace Brook Parkway.  Parks Department is leading the work - David Murphy (617-376-1251).  Will include bridge replacement.
Bicycle and Pedestrian                
Arlington Arlington Arlington- Mystic River Path Connection to the Minuteman Bikeway 613593 PRC Approved (10/12/2023) 2023 $10,688,515 4 Design includes a $1,000,000 congressional earmark
Belmont Belmont Belmont Community Path Phase 2 N/A Pre-PRC 2023 TBD 4 akoumoutsos@tooledesign.com reached out 3/16/2023 to discuss initiation and funding through MassDOT
Boston Boston Fenway Multi-Use Path Phase III N/A Pre-PRC 2021 N/A 6 Project at conceptual stage.
Boston, Milton DCR New Bridge and Shared Use Path Construction over Neponset River at Osceola Street 613164 PRC Approved (7/6/2023) 2023 $4,597,650 6 DCR taking lead with City of Boston.  
Brookline Brookline Beacon Street Bridle Pathway N/A Pre-PRC 2022 N/A 6 Project in conceptual design through Toole, receipt of a MassTrails grant in 2020 for feasibility study.  Limits would be Audubon Circle to Cleveland Circle.
Cambridge Cambridge Separated Bicycle Lane on Steel Place 613357 PRC Approved (7/6/2023) 2023 $958,218 6  
Everett, Somerville DCR Mystic River Bicycle and Pedestrian Crossing 612004 PRC approved (2021) 2021 $38,218,334 4 Moving forward for construction.
Medford Medford Wellington Phase 4 Shared Use Path 613082 Pre-PRC 2022 $1,195,000 4 Initiated on 11/3/2022.  Includes an earmark and Gaming Commission money.
Medford Medford MacDonald Park Pedestrian Bridge N/A Initiation 2022 $800,000 4 In DCR park, City is requesting expansion of bridge to 10-12 feet in width to coordinate with shared use pathway.
Newton Newton Needham-Newton - Bridge Replacement on Christina Street 613594 PRC Approved (10/12/2023) 2023 $4,785,788 6 May appear in FFY26–30 TIP.
Major Infrastructure                
Boston, Chelsea Boston Bridge Rehabilitation and Fender Pier Replacement, Meridian Street Over Chelsea Creek (Andrew P. McArdle Bridge) 612601 PRC Approved (2/10/2022) 2021 $97,538,787 6  
Cambridge DCR Intersection Improvements at Fresh Pond Parkway/Gerry's Landing Road, from Brattle Street to Memorial Drive 609290 PRC approved (2018) 2019 $7,000,000 6 Short-term improvements being initiated. 
Newton MassDOT Traffic Signal and Safety Improvements at Interchange 127 (Newton Corner) 609288 PRC approved (2018) 2019 $14,000,000 6  
Medford Medford Roosevelt Circle Interchange Reconfiguration N/A Pre-Pre-PRC 2022 TBD 4 As discussed on 11.4.2022 with the City of Medford, the City is looking to reconfigure the ramps and adjacent local roadways to improve traffic safety following the results of a RSA along this corridor.  Includes improvements for bicycle, pedestrian, and transit access. 
Revere Revere Route 1A Improvement and Reconfiguration N/A Pre-Pre-PRC 2022 $12,000,000 4 Project is in conceptual design stage.  The priority is to reconfigure the loop ramps at the General Edwards Bridge to facilitate redevelopment of the area, for which there are already parcel developments planned.  The reconfiguration will entail construction of a new roundabout and improved pedestrian crossings to improve access to the riverfront and Point of Pines area along Revere.  Per the City, this reconfiguration is intended to work with the Lynnway Multimodal Corridor improvements, but will also not impact construction for the General Edwards Bridge replacement.
Revere, Saugus Revere, Saugus Roadway Widening on Route 1 North (Phase 2) 611999 PRC Approved (1/28/2021) 2021 $2,397,600 4  
Community Connections                
Belmont Belmont Belmont BlueBikes Expansion N/A N/A 2022 $250,000 4 Belmont is currently evaluating potential revenue streams to cover operational costs and match prior to submitting an application for this project.  
Lynn Lynn Transit Signal Priority - Bus Upgrades for Lynn Route 107 N/A N/A 2022 TBD 4  
Waltham Waltham Waltham BlueBikes/Bikeshare Expansion N/A N/A 2022 TBD 4  
                 
Minuteman Advisory Group on Interlocal Coordination            
Complete Streets                
Acton Acton Acton Route 119 Complete Streets Design N/A To be initiated 2023 TBD 3 Design funding application
Acton-Maynard Acton-Maynard Route 62 Complete Streets Design (Knox Trail to Waltham Street) N/A To be initiated 2023 TBD 3 Joint application for design funding may emerge, majority of pavement is in Maynard.  
Bedford Bedford Roadway Reconstruction of Route 4/225 (The Great Road) 612739 PRC approved (5/12/2022) 2022 $10,899,448 4 North Road to match line near Loomis Street.  SRTS project completed in the area under 608000.
Intersection Improvements                
Acton Acton Intersection Improvements at Hayward Road and Route 27 TBD Initiated 2023 $2,000,000 3 Per discussion on 11/9/23.  Town has had significant design progress internally, still working to move forward with it.
Littleton Littleton Intersection Improvements at Route 119/Beaver Brook Road 610702 PRC approved (2020) 2020 $3,120,110 3 MassDOT agreed to fund design after 25% design approved. As of October 2022, the project remains in preliminary design.
Bicycle and Pedestrian                
Bedford Bedford Minuteman Bikeway Extension, From Loomis Street to Concord Road (Route 62) 607738 75% Package Received (11/03/2020) 2022 $11,218,186 4 Local concerns about permitting.  Previously programmed in FY23–27, dropped due to public opposition.  Failed to achieve two-thirds majority in town meeting on 11.14.2022.
Concord Concord Assabet River Multi-Use Trail and Bridge Construction 612870 PRC approved (8/29/2022) 2020 $8,280,000 4 Project was originally a new Pedestrian Bridge with a $2-3.6M price range.  Scope has increased to include improvements for a multi-use trail alongside the bridge.  Cost has increased accordingly, and is now in preliminary design. Municipality applied for Reconnecting Communities Funding for work. Project location runs between the West Concord MBTA Station and the Concord Meadows Corporate Center with a hookup to the Southern Terminus of the Bruce Freeman.
Hudson Hudson Marlborough- Mass Central Rail Trail Extension TBD Initiated 2023 TBD 3 Design pilot candidate that may seek a phased construction approach, prioritizing downtown section and segments connected to the Assabet River Trail
Stow Stow Stow - Assabet River Rail Trail Construction 613096 Scope to DE (6/16/2023) 2022 $2,232,173 3 Project Info # is being reserved for this project's construction.  Recent earmark recipient for design under FFY22 House THUD bill (Rep. Lori Trahan).  Design line item added to FFY23–27 in AM2 and is retaining a project ID # S12749.  
Sudbury Sudbury Sudbury-Framingham - Bike Path Construction (Bruce Freeman Rail Trail Phase 3) 613319 PRC approved (6/1/2023) 2023 $7,350,000 3  
Major Infrastructure                
Acton MassDOT Intersection Improvements at Route 2 and Route 27 Ramps 610553 PRC approved (2019) 2020 $3,480,000 3 Project not programmed in LRTP (meets MPO roadway classification requirement). Priority for District 3 and Town of Acton. Project has had surveying and MSA design contracts opened for it.  MassDOT appears to be tracking as a Traffic Safety improvement.
Lexington Lexington Route 4/225 (Bedford Street) and Hartwell Avenue 613144 PRC approved (12/20/2022) 2019 $30,557,000 4 In 2022, the project received PRC approval for a design-only contract.  The project may seek funding through the TIP.  The project has expanded to be an interchange reconstruction, and the Hartwell Avenue component may emerge separately.  The estimated construction cost for this project is likely to increase.
Community Connections                
Concord Concord Concord Workforce Shuttle N/A N/A 2022 $369,911 4 Application in 2024–28 TIP.
Lexington Lexington Lexington Bikeshare Pilot Program N/A N/A 2023 N/A 4 May seek funding in a later TIP cycle, current constraint is distance from existing Bluebikes network and operating costs.
                 
MetroWest Regional Collaborative              
Complete Streets                
Marlborough Marlborough Route 20 Complete Streets Improvements (Liberty Street to Main Street) N/A To be initiated 2023 TBD 3 Seeking a pathway for design funding, possibility for transit improvements in area.
Wellesley Wellesley Route 135 Reconstruction (Natick Town Line to Weston Road) N/A To be initiated 2022 TBD 6  
Holliston Holliston Reconstruction of Concord Street (Route 126) N/A Pre-PRC 2021 N/A 3 Added through subregional outreach. Project is municipal priority, as it's tied to necessary below-grade sewer work. 10/12/22: MaPIT is showing that a project was initiated back on 7.14.2020 for this stretch for resurfacing and related work, assuming $600K in total cost (likely lowball).  
Intersection Improvements                
Framingham MassDOT Roundabout Construction at Salem End Road, Badger Road and Gates Street 609280 PRC approved (2018) 2019 $2,520,000 3  
Weston Weston Intersection Improvements - Signalization of Route 20 at Highland Street N/A Pre-PRC 2021 N/A 6 Added through subregional outreach.
Holliston Holliston Route 16 Washington Street at Whitney Street N/A Pre-PRC 2022 $500,000 3 Result of 12/20/2022 phone call between Ethan Lapointe and Robert Walker (Highway Superintendent). Looking for signal installation. Discussed July 2023. May be moving for Project Design Pilot program. Municipality discussed with MassDOT.
Bicycle and Pedestrian                
Framingham Framingham Chris Walsh Trail Phase 2 TBD Initiated 2023 TBD 3 Project design pilot candidate. Pedestrian bridge over MBTA and CSX tracks to connect Phase 2 of the trail into Framingham MBTA Station.
Framingham Framingham Framingham - Bruce Freeman Trail Extension TBD Initiated 2023 TBD 3 Initiated 10/31/2023.  Connects to 613319 in Sudbury.
Weston MassDOT Weston - Shared Use Path Construction on Route 30 612602 PRC Approved (2/10/2022) 2022 $1,050,000 6 Meant to connect into Project 608954.  District 6 priority to ensure that the shared-use-path there ties in to the rest of the bicycle network and concludes at a logical terminus.
Major Infrastructure                
Framingham Framingham Intersection Improvements at Route 126/135/MBTA and CSX Railroad 606109 PRC approved (2010) 2019 $115,000,000 3 Subject of an FFY23 RCN design grant submission.  Included in Destination 2050 LRTP.
                 
North Suburban Planning Council              
Complete Streets                
Burlington Burlington Town Center Complete Streets Improvements N/A Initiation 2021 N/A 4 Complete Streets upgrades along Route 3A from Bedford Street to Arthur Woods Avenue. The scope of work would be additive to existing resurfacing planned under 610704, and would focus mostly on paint.  There is potential for widening if the town's design includes a multimodal path while maintaining the current number and width of vehicle lanes.  May seek design funding.
Lynnfield Lynnfield Reconstruction of Summer Street 609381 PRC approved (2019) 2019 $21,521,921 4 Not yet at 25% design.  Bayside Engineering handling design, Norman Brown (781-932-3201, nbrown@baysideengineering.com) is PM.  Culvert and turtle crossings.  Town may consider descoping and phasing the project due to cost, per 12/20/2022 conversation with PM.
Reading Reading Reading Downtown Improvement Project N/A Pre-PRC 2020 $7-$8 million 4 Project at conceptual stage.
Stoneham Stoneham Reconstruction of South Main Street, from Town Center to South Street N/A Pre-PRC 2021 N/A 4  
Winchester Winchester Town Center Complete Streets Improvements N/A Pre-PRC 2021 N/A 4  
Intersection Improvements                
Burlington Burlington Burlington - Route 3A / Cambridge Street and Winn Street Intersection Improvements N/A Initiated 2023 $6,600,000 4 PRC planned for December 2023. May seek an application in the FFY25–29 TIP for design.
Stoneham Stoneham Intersection Improvements at Main Street (Route 28), Franklin Street, and Central Street N/A Pre-PRC 2020 N/A 4 Project at conceptual stage.
Wilmington Wilmington Intersection Improvements at Main Street (Route 38) at Richmond Street (Route 129) 613600 PRC Approved (10/19/2023) 2023 $7,190,375 4  
Bicycle and Pedestrian                
Stoneham, Wakefield Stoneham, Wakefield Mystic Highlands Greenway Project N/A Pre-PRC 2021 N/A 4  
Community Connections                
North Reading North Reading North Reading Human Services Transportation N/A N/A 2022   4 Significant paratransit consideration.  Losing Merrimack Valley interdistrict service as North Reading falls between the MBTA and MVRTA.  
                 
North Shore Task Force              
Complete Streets                
Beverly, Manchester-by-the-Sea MassDOT Resurfacing and Related Work on Route 127 607707 PRC approved (2013) 2018 $2,300,000 4 Still in preliminary design.  
Danvers Danvers Reconstruction on Collins Street, from Sylvan Street to Centre and Holten Streets 602310 75% submitted (3/5/2010) 2017 or earlier $5,183,121 4 Updated 75% design submission needed for project to move forward. Last scored for FFYs 2020–24 TIP.
Ipswich Ipswich Reconstruction of County Road, from South Main Street to East Street 611975 PRC approved (2021) 2020 $5,653,500 4 Ipswich DPW noted that a bridge within the project limits has had a lane closed by MassDOT.  Structure IDs are I01005, main concern is Ipswich - 2PN which is an 1861-built historic stone arch mill bridge.  Currently functioning as a one-way.  Town had approached as a traffic safety project with the bridge as a focal point.  Pier degradation and cracking.  Structure is under evaluation for a statewide bridge preservation contract.
Ipswich Ipswich Argilla Roadway Reconstruction and Adaptation (Crane Estate to Crane Beach) 612738 PRC Approved (5/12/2022) 2021 $4,628,419 4 Municipal priority for funding.  
Marblehead Marblehead Bridge Replacement, M-04-001, Village Street over Marblehead Rail Trail (Harold B. Breare Bridge) 612947 PRC approved (9/15/2022) 2019 N/A 4 Per 10.11 email with C Quigley, the project received a PRC and a PROJIS ID in September 2022 after a PNF was submitted 8/2022.
Manchester-by-the-Sea Manchester-by-the-Sea Pine Street - Central Street (Route 127) to Rockwood Heights Road N/A Pre-PRC; PNF submitted (12/27/16) 2017 or earlier N/A 4  
Manchester-by-the-Sea Manchester-by-the-Sea Bridge Replacement, M-02-001 (8AM), Central Street (route 127) over Saw Mill Brook 610671 PRC approved (2019) 2019 $4,350,000 4 Project received federal BRIC grant, may no longer seek funding through MPO.
Rockport Rockport Roadway Reconstruction of Route 127A (Thatcher Road) 612737 PRC Approved (1/23/2023) 2023 $12,058,173 4  
Salem MassDOT Reconstruction of Bridge Street (Route 107), from Flint Street to Washington Street 612990 PRC Approved (1/24/2023) 2017 or earlier $12,067,500 4 Project is not programmed in Destination 2040. It is on a regionally significant roadway and would add roadway capacity. If it is programmed in the TIP, it will need to be programmed in Destination 2050.
Salem Salem Topsfield- Bridge Replacement, T-06-016, on Salem Road over the Ipswich River 613592 PRC Approved (10/12/2023) 2023 $5,593,494 4 Bridge replacement project only
Wenham Wenham Safety Improvements on Route 1A 609388 25% Approved (9/10/2021) 2019 $3,629,036 4 Dan Wilk (daniel.wilk@state.ma.us) is MassDOT PM.  Working with Bayside Engineering as design consultant. MassDOT may fund this for construction in full, and Wenham is paying for design.  Bayside currently responding to 25% comments.  Drainage for abutters is holding this up.
Wenham Wenham Roadway Reconstruction on Larch Row and Dodges Row N/A Pre-PRC 2019 $800,000 4 Project at conceptual stage.
Intersection Improvements                
Essex Essex Targeted Safety Improvements on Route 133 (John Wise Avenue) 609315 PRC approved (2019) 2019 $2,135,440 4  
Swampscott Swampscott Humphrey Street at Atlantic Avenue  N/A Preliminary Design 2023 $4,000,000 4 Project conceptual, design candidate.  Possible roundabout.
Bicycle and Pedestrian                
Peabody, Salem Peabody, Salem Riverwalk Project N/A Pre-PRC 2021 N/A 4 MVP grant issued for project design. Includes elements of the Harmony Grove Path and the Independence Greenway to the west.  Gap remains between Mt Vernon Street and Endicott Street. 
Marblehead Marblehead B2B Bikeway Design - Marblehead N/A Pre-PRC 2022 $140,000 4 Design earmark currently programmed, construction will follow.
Peabody, Salem Peabody, Salem Harmony Grove Multi-Use Path 613258 PRC Approved (6/1/2023) 2022 $1,021,556 4 Design funding is a separate line item in the TIP.  This project is the Border to Boston Trail section for Salem and Peabody.
Major Infrastructure                
Beverly Beverly Interchange Reconstruction at Route 128/Exit 19 at Brimbal Avenue (Phase II) 607727 PRC Approved (2014) 2021 N/A 4 Project is not programmed in Destination 2040. Is on a regionally-significant roadway, and would expand the interchange. If this project is programmed in the TIP and adds roadway capacity, this project will need to be included in Destination 2050.
                 
South Shore Coalition                
Complete Streets                
Holbrook Holbrook Corridor Improvements and Related Work on South Franklin Street (Route 37) from Snell Street to King Road 608543 PRC approved (2017) 2018 $4,000,200 5  
Hull Hull Nantasket Avenue Redesign N/A Initiation 2023 TBD 5 Includes redevelopment of existing gravel squares in front of Nantasket Beach for additional facilities/recreational zones/open space. 
Rockland Rockland Corridor Improvements on VFW Drive/Weymouth Street 612605 PRC approved (2/10/2022) 2021 $13,047,281 5 PNF entered in Jan 2022
Weymouth MassDOT Reconstruction on Route 3A, Including Pedestrian and Traffic Signal Improvements 608231 PRC approved (2016) 2017 or earlier $10,780,100 6 Pre-25% package submitted in July 2021. Not recorded in PINFO.
Weymouth MassDOT Resurfacing and Related Work on Route 3A 608483 PRC approved (2016) 2018 $2,400,000 6  
Intersection Improvements              
Cohasset Cohasset Intersection Improvements at Route 3A and King Street N/A Pre-PRC 2021 N/A 5 Added through subregional outreach.
Hull Hull Intersection Improvements at George Washington Boulevard and Barnstable Road/ Logan Avenue N/A Pre-PRC 2021 N/A 5 Added through subregional outreach.
                 
South West Advisory Planning Committee              
Complete Streets                
Bellingham Bellingham South Main Street (Route 126) - Elm Street to Douglas Drive Reconstruction N/A Pre-PRC; PNF submitted (3/13/17) 2017 or earlier N/A 3 Project would dovetail ongoing project 608887, rehab on Route 126 from Douglas Drive to Route 140.  
Bellingham Bellingham Bellingham - Roadway Rehabilitation of Route 126 (Hartford Road), from 800 North of the I-495 NB off ramp to Medway T/L, including B-06-017 612963 PRC Approved (9/15/2022) 2022 $10,950,000 3 Applied for FFY2024-2028.  BRMPO issued a full corridor study in 2011.  Progressing towards 25% design, recent addition of stormwater work.
Franklin MassDOT Resurfacing and Intersection Improvements on Route 140, from Beaver Street to I-495 Ramps 607774 PRC approved (2014)   2018 $4,025,000 3  
Hopkinton Hopkinton West Main Street Reconstruction and Shared Use Path N/A Preliminary Design 2022 $15,000,000 3 Priority is a shared use path under I-495 along W Main Street EB to link into existing trail networks and SUP in downtown area and commercial campuses west of I-495.  Includes a large roundabout at Lumber Street/Parkwood Drive and West Main Street due to frequent crashes.
Medway Medway Improvements on Route 109 West of Highland Street (Highland Street to Bellingham Line)  N/A Preliminary Design 2021 N/A 3 Project at conceptual stage.  Project #605657 recently completed near Highland Street.
Milford MassDOT Resurfacing and Related Work on Route 16 612091 PRC approved (2021) 2021 $4,192,500 3  
Millis Millis Town Center Improvements N/A Preliminary Design 2020 N/A 3 Project at conceptual stage.
Sherborn Sherborn Improvements on Route 27 and Route 16, Sherborn Town Center Improvements (Village Way to Coolidge Street)  N/A Preliminary Design 2023 TBD 3 Discussed on 11/13/2023 meeting for design potential.  Complete streets and traffic safety project.
Wrentham Wrentham Resurfacing and Related Work on Route 1 608497 PRC approved (2016) 2020 N/A 5 25% design anticipated July 2022.
Wrentham Wrentham Route 140 & Eagle Dam N/A Preliminary Design 2023 N/A   MVP Project.  Dam removal upstream of the bridge and culvert on Route 40.  Seeking feedback from MassDOT. Strong Resilience Project candidate.
Wrentham Wrentham Wrentham Center Improvements N/A Preliminary Design 2023 N/A 5 Formerly under Intersection Improvements, the scope of this project is growing given a 300 unit development near to the proposed work area.
Intersection Improvements              
Medway Medway Traffic Signalization at Trotter Drive and Route 109 N/A Pre-PRC 2021 N/A 3 Project at conceptual stage.
Sherborn Sherborn Intersection Improvements at Route 16 and Maple Street N/A Pre-PRC 2021 N/A 3 Project at conceptual stage.
Wrentham Wrentham Intersection Improvements on Route 1A at North and Winter Street 610676 PRC Approved (12/19/2019) 2020 $2,649,000 5 RSA done in 2022
Wrentham Wrentham Intersection Improvements at Randall Road and Route 1A N/A Preliminary Design 2020 $2,649,000 5 Project at conceptual stage.
Wrentham Wrentham Intersection Improvements at Route 1A Green St and High Street N/A Preliminary Design 2023 TBD 5  
Wrentham Wrentham Intersection Improvements at Route 1 and Hawes Street N/A Preliminary Design 2023 TBD 5  
Wrentham Wrentham Intersection Improvements at Route 1A and Route 121 N/A Preliminary Design 2023 TBD 5 Closer to the I-495 1A Ramps project, south side of town.  Recent RSA conducted.
Bicycle and Pedestrian                
Bellingham-Franklin Bellingham-Franklin Southern New England Trunkline Trail Construction 608948 25% Package Received (5/12/2020) 2021 N/A 3 Project may be completed by DCR.
Hopkinton Hopkinton Campus Trail Connector, Shared Use Trail Construction 611932 PRC approved (9/24/2020) 2020 $1,750,700 3  
Norfolk, Walpole, and Wrentham Norfolk Metacomet Greenway N/A Pre-PRC 2021 N/A 5 Project at conceptual stage.  Feasibility analysis complete.  Pilot development will start with Hill to Pine Street through old rail bed ROW.  Includes bridge over Route 115 due to traffic concerns.
Sherborn Sherborn Upper Charles River Trail Extension to Framingham City Line N/A Pre-PRC 2021 N/A 3 Project at conceptual stage.
Major Infrastructure                
Bellingham MassDOT Ramp Construction & Relocation, I-495 at Route 126 (Hartford Avenue) 604862 PRC approved (2006) 2017 or earlier $13,543,400 3 High priority for District 3
                 
Three Rivers Interlocal Council              
Complete Streets                
Canton Canton Lower Randolph Reconstruction (Route 138, Turnpike Avenue to Colts Crossing) N/A Pre-Initiation 2023 TBD 6 Emerged in discussions following application of Randolph and York Street Signal Installation for FFY 2024–28 STIP.  Sidewalk installation, bike lanes, crosswalks, roadway rehabilitation, signal improvements at the Route 138 and, potentially, York Street intersection.  Crosswalks near Ponkapoag Pond trailhead.
Canton MassDOT Canton- Roadway Reconstruction and Related Work on Route 138 612614 PRC Approved (2/10/2022) 2023 $24,687,600 6 This project reconstructs Route 138 from Randolph Street to the Stoughton Town Line.  It includes sidewalks and bicycle accommodations.
Medfield Medfield Reconstruction of Route 109 (Millis T/L to Hartford Street) N/A Pre-Initiation 2021 N/A 3 Added through subregional outreach.  Working with Ann Sullivan and Arthur Frost at D3, BETA is design consultant.
Milton MassDOT Reconstruction on Granite Avenue, from Neponset River to Squantum Street 608406 25% submitted (2/10/2017) 2017 or earlier $3,665,146 6 Milton also in ICC subregion. 
Milton Milton Adams Street Improvements, from Randolph Avenue to Eliot Street 610820 PRC approved (4/30/2020) 2020 $1,799,330 6 Milton also in ICC subregion.  Preliminary design.
Milton MassDOT Intersection Improvements at Route 138 and Bradlee Road 612616 PRC approved (2/10/2022) 2023 $2,752,100 6 Formerly a component of deactivated project 608484.
Needham Needham Reconstruction of Highland Avenue, from Webster Street to Great Plains Avenue 612536 PRC approved (10/21/2021) 2021 $10,402,402 6 Needham also in ICC subregion.
Dover, Needham Dover, Needham Centre Street Bridge Replacement 612978 PRC Approved (9/15/2022) 2022 $12,953,780 6 Historic-eligible, needs replacement as it is 1850's era.  Dover awarded an earmark to design.
Westwood Westwood Reconstruction of Canton Street (East Street Rotary and University Avenue) 608158 25% Package Received (2/18/2022) 2017 or earlier $19,047,306 6 Priority for municipality.  MassDOT expresses concerns regarding project readiness due to scope fluctuations.  PINFO includes bridge rehab work. Application submitted for FFY2024–28.  
Intersection Improvements                
Canton Canton Signal Installation at Randolph Street and York Street N/A Pre-PRC 2022 $500,000 6 Application submitted for FFY 2024–28 TIP.  Municipality requested $50,000 against a total estimate of $500,000.  Significant funding in local mitigation fund for match.
Foxborough Foxborough Intersection Signalization at Route 140/Walnut Street and Route 140/I-95 (SB Ramp) 612740 PRC Approved (5/12/2022) 2021 $11,902,600 5 Added through subregional outreach. Town has advanced design outside of TIP process. District supports project.  Budget has increased from original $5M estimate in 2021.
Medfield Medfield Intersection Improvements at Route 27 and West Street 612807 PRC Approved (5/12/2022) 2021 $3,987,500 3 Added through subregional outreach. 
Bicycle and Pedestrian                
Canton Canton Warner Trail Extension, from Sharon to Blue Hills Reservation N/A Pre-PRC 2021 N/A 6 Added through subregional outreach. Feasibility study currently underway.
Major Infrastructure                
Canton, Westwood MassDOT Interchange Improvements at I-95 / I-93 / University Avenue / I-95 Widening 87790 25% submitted (7/25/14) 2017 or earlier $202,205,994 6 Project not programmed in Destination 2040. It is on a regionally-significant roadway and adds roadway capacity. If programmed in the TIP, this project would also need to be included in Destination 2050. Last scored for FFYs 2020–24 TIP. Regional priority, potential discretionary grant project via MassDOT for State Highway funding.