Overall Changes in Funding in TIP | ||||||
Project | Proposed Change | Explanation | Section/Funding Source | Current Budget | New Budget | Difference |
FFY 2024 Federal Discretionary Grant | ||||||
Boston Safe Streets and Roads for All Implentation Grant | New Project | This FFY 2022 Safe Streets and Roads for All Implementation Grant will implement raised crosswalks, pedestrian refuge islands, curb extensions, and other safety countermeasures at nine intersections in the city of Boston. | Discretionary: FFY 2022 Safe Streets and Roads for All Implementation Grant | N/A | $9,000,000 | $9,000,000 |
FFY 2024 Earmark Discretionary | ||||||
Peabody - Border to Boston Trail Design | Move Project | This is a federal design earmark (#MA271) for a section of the Border to Boston Trail through the city of Peabody, which will be coordinated with construction projects 610544 and 609211, the Peabody Independence Greenway Extensions programmed in FFYs 2024 and 2025. | Formula: FFY 2023 Community Project Funding | N/A | $375,000 | $375,000 |
Salem - Border to Boston Trail Design | Move Project | This is a federal design earmark (#MA271) for a section of the Border to Boston Trail through the city of Salem. | Formula: FFY 2023 Community Project Funding | N/A | $375,000 | $375,000 |
Marblehead - Border to Boston Trail Design | Move Project | This is a federal design earmark (#MA271) for a section of the Border to Boston Trail through the town of Marblehead | Formula: FFY 2023 Community Project Funding | N/A | $175,000 | $175,000 |
FFY 2024 Statewide Highway Program | ||||||
608762: Boston- Cambridge- Bridge Preservation of B-16-246=C-01-029, Eliot Street over the Charles River | Move Project | This project currently resides in the Statewide section of the STIP, but is located entirely within the Boston region. The project is being incorporated into the TIP as a result. | Formula: HIP-BR | $6,973,936 | $6,973,936 | $0 |
609058: Peabody to Gloucester- Guide and Traffic Sign Replacement on Route 128 | Move Project, Cost Increase | This project currently resides in the Statewide section of the STIP, but is located entirely within the Boston region. The project is being incorporated into the TIP as a result. The cost of this project is increasing based on the most recent final design estimate. | Formula: HSIP | $1,714,693 | $2,298,603 | +$583,910 |
609254: Lynn- Intersection Improvements at Two Intersections on Broadway | Move Project | The programmed year for this project reflects a new advertisement date of December 30, 2023. It was previously programmed in FFY 2023 of the FFYs 2023–27 TIP. | Formula: HSIP | $6,059,056 | $6,059,056 | $0 |
FFY = Federal Fiscal Year. HIP-BR = Highway Investment Program, Bridge. HSIP = Highway Safety Improvement Program. STIP = State Transportation Improvement Program. TIP = Transportation Improvement Program.