Transportation Improvement Program
Federal Fiscal Years 2024–28

TIP Highway Programming

 

 

 


 

Table 3-7 FFYs 2024-28 TIP Highway Programming

STIP: 2024 - 2028 (D)
Year MassDOT Project ID MPO Municipality MassDOT Project Description District Funding Source Adjusted TFPC Total Programmed Funds Federal Funds Non-Federal Funds
Federal Fiscal Year 2024 $459,558,159 $265,588,824 $193,969,335
Section 1A / Regionally Prioritized Projects $120,591,048 $97,222,838 $23,368,210
Bridge On-system NHS $21,851,750 $17,481,400 $4,370,350
2024 110980 Boston Region Multiple NEWTON- WESTON- BRIDGE REHABILITATION, N-12-010=W-29-005, COMMONWEALTH AVENUE (ROUTE 30) OVER THE CHARLES RIVER 6 NHPP-PEN $21,851,750 $21,851,750 $17,481,400 $4,370,350
Roadway Reconstruction $42,150,471 $34,470,377 $7,680,094
2024 603739 Boston Region Wrentham WRENTHAM- CONSTRUCTION OF ROUTE I-495/ROUTE 1A RAMPS 5 HSIP $17,994,890 $4,500,000 $4,050,000 $450,000
2024 603739 Boston Region Wrentham WRENTHAM- CONSTRUCTION OF ROUTE I-495/ROUTE 1A RAMPS 5 STBG $17,994,890 $12,494,890 $9,995,912 $2,498,978
2024 603739 Boston Region Wrentham WRENTHAM- CONSTRUCTION OF ROUTE I-495/ROUTE 1A RAMPS 5 TAP $17,994,890 $1,000,000 $800,000 $200,000
2024 606226 Boston Region Boston BOSTON- RECONSTRUCTION OF RUTHERFORD AVENUE, FROM CITY SQUARE TO SULLIVAN SQUARE 6 NHPP $197,759,449 $0 $0 $0
2024 606226 Boston Region Boston BOSTON- RECONSTRUCTION OF RUTHERFORD AVENUE, FROM CITY SQUARE TO SULLIVAN SQUARE 6 STBG $197,759,449 $0 $0 $0
2024 606226 Boston Region Boston BOSTON- RECONSTRUCTION OF RUTHERFORD AVENUE, FROM CITY SQUARE TO SULLIVAN SQUARE 6 TAP $197,759,449 $0 $0 $0
2024 607777 Boston Region Watertown WATERTOWN- REHABILITATION OF MOUNT AUBURN STREET (ROUTE 16) 6 CMAQ $27,899,345 $1,000,000 $800,000 $200,000
2024 607777 Boston Region Watertown WATERTOWN- REHABILITATION OF MOUNT AUBURN STREET (ROUTE 16) 6 STBG $27,899,345 $2,494,249 $1,995,399 $498,850
2024 608007 Boston Region Multiple COHASSET- SCITUATE- CORRIDOR IMPROVEMENTS AND RELATED WORK ON JUSTICE CUSHING HIGHWAY (ROUTE 3A), FROM BEECHWOOD STREET TO HENRY TURNER BAILEY ROAD 5 HSIP $15,496,957 $3,000,000 $2,700,000 $300,000
2024 608007 Boston Region Multiple COHASSET- SCITUATE- CORRIDOR IMPROVEMENTS AND RELATED WORK ON JUSTICE CUSHING HIGHWAY (ROUTE 3A), FROM BEECHWOOD STREET TO HENRY TURNER BAILEY ROAD 5 STBG $15,496,957 $11,869,554 $9,495,643 $2,373,911
2024 608007 Boston Region Multiple COHASSET- SCITUATE- CORRIDOR IMPROVEMENTS AND RELATED WORK ON JUSTICE CUSHING HIGHWAY (ROUTE 3A), FROM BEECHWOOD STREET TO HENRY TURNER BAILEY ROAD 5 TAP $15,496,957 $627,403 $501,922 $125,481
2024 609054 Boston Region Littleton LITTLETON- RECONSTRUCTION OF FOSTER STREET 3 CMAQ $5,164,375 $1,500,000 $1,200,000 $300,000
2024 609054 Boston Region Littleton LITTLETON- RECONSTRUCTION OF FOSTER STREET 3 STBG $5,164,375 $2,664,375 $2,131,500 $532,875
2024 609054 Boston Region Littleton LITTLETON- RECONSTRUCTION OF FOSTER STREET 3 TAP $5,164,375 $1,000,000 $800,000 $200,000
Bicycle and Pedestrian $7,556,704 $6,045,363 $1,511,341
2024 609211 Boston Region Peabody PEABODY- INDEPENDENCE GREENWAY EXTENSION 4 CMAQ $7,524,204 $3,524,204 $2,819,363 $704,841
2024 609211 Boston Region Peabody PEABODY- INDEPENDENCE GREENWAY EXTENSION 4 TAP $7,524,204 $4,000,000 $3,200,000 $800,000
2024 S12805 Boston Region Canton CANTON PUBLIC SCHOOLS BIKE PROGRAM 6 CMAQ $22,500 $22,500 $18,000 $4,500
2024 S12806 Boston Region Canton CANTON CENTER BICYCLE RACKS 6 CMAQ $10,000 $10,000 $8,000 $2,000
Transit Grant Program $2,549,479 $2,039,583 $509,896
2024 S12114 Boston Region Canton ROYALL STREET SHUTTLE   CMAQ $534,820 $148,542 $118,834 $29,708
2024 S12124 Boston Region Multiple COMMUNITY CONNECTIONS PROGRAM   CMAQ $8,334,827 $0 $0 $0
2024 S12694 Boston Region Newton NEWMO MICROTRANSIT SERVICE EXPANSION 6 CMAQ $890,574 $268,246 $214,597 $53,649
2024 S12697 Boston Region Watertown PLEASANT STREET SHUTTLE SERVICE EXPANSION 6 CMAQ $1,002,198 $335,434 $268,347 $67,087
2024 S12699 Boston Region Stoneham STONEHAM SHUTTLE SERVICE 4 CMAQ $796,817 $261,439 $209,151 $52,288
2024 S12803 Boston Region Medford MEDFORD - BICYCLE PARKING (TIER 1) 4 CMAQ $29,600 $29,600 $23,680 $5,920
2024 S12804 Boston Region Medford MEDFORD - BLUEBIKES EXPANSION 4 CMAQ $118,643 $118,643 $94,914 $23,729
2024 S12818 Boston Region Acton ACTON PARKING MANAGEMENT SYSTEM 3 CMAQ $15,000 $15,000 $12,000 $3,000
2024 S12823 Boston Region Boston BOSTON - ELECTRIC BLUEBIKES ADOPTION 6 CMAQ $1,020,000 $1,020,000 $816,000 $204,000
2024 S12824 Boston Region Cambridge CAMBRIDGE - ELECTRIC BLUEBIKES ADOPTION 6 CMAQ $352,575 $352,575 $282,060 $70,515
Flex to FTA $46,482,644 $37,186,115 $9,296,529
2024 S12700 Boston Region Multiple CATA ON DEMAND MICROTRANSIT SERVICE EXPANSION 4 CMAQ $813,291 $265,065 $212,052 $53,013
2024 S12701 Boston Region Multiple MWRTA CATCHCONNECT MICROTRANSIT SERVICE EXPANSION 3 CMAQ $450,163 $149,425 $119,540 $29,885
2024 S12703 Boston Region Multiple MONTACHUSETT RTA MICROTRANSIT SERVICE 3 CMAQ $1,316,061 $430,354 $344,283 $86,071
2024 S12705 Boston Region Lynn LYNN STATION IMPROVEMENTS PHASE II 4 CMAQ $48,100,000 $13,600,000 $10,880,000 $2,720,000
2024 S12705 Boston Region Lynn LYNN STATION IMPROVEMENTS PHASE II 4 STBG $48,100,000 $0 $0 $0
2024 S12802 Boston Region Lynn LYNN - BROAD STREET CORRIDOR TRANSIT SIGNAL PRIORITY 4 CMAQ $297,800 $297,800 $238,240 $59,560
2024 S12807 Boston Region Multiple MWRTA CATCHCONNECT MICROTRANSIT EXPANSION PHASE 2 3 CMAQ $380,477 $140,000 $112,000 $28,000
2024 S12819 Boston Region Boston JACKSON SQUARE STATION ACCESSIBILITY IMPROVEMENTS 6 CMAQ $21,000,000 $11,000,000 $8,800,000 $2,200,000
2024 S12821 Boston Region Multiple RAIL TRANSFORMATION - EARLY ACTION ITEMS - READING STATION AND WILBUR INTERLOCKING 4 CMAQ $11,200,000 $11,200,000 $8,960,000 $2,240,000
2024 S12822 Boston Region Boston COLUMBUS AVENUE BUS LANES PHASE 2 6 CMAQ $9,400,000 $9,400,000 $7,520,000 $1,880,000
Section 1B / Earmark or Discretionary Grant Funded Projects $126,391,302 $112,872,525 $13,518,777
Bridge On-System NHS NB $25,769,762 $20,615,810 $5,153,952
2024 605313 Boston Region Natick NATICK- BRIDGE REPLACEMENT, N-03-020, ROUTE 27 (NORTH MAIN STREET) OVER ROUTE 9 (WORCESTER STREET) AND INTERCHANGE IMPROVEMENTS 3 HIP-BR $75,677,350 $16,879,931 $13,503,945 $3,375,986
2024 606902 Boston Region Boston BOSTON- BRIDGE REPLACEMENT, B-16-181, WEST ROXBURY PARKWAY OVER MBTA 6 HIP-BR $8,889,831 $8,889,831 $7,111,865 $1,777,966
Earmark Discretionary $84,714,980 $79,531,468 $5,183,512
2024 605313 Boston Region Natick NATICK- BRIDGE REPLACEMENT, N-03-020, ROUTE 27 (NORTH MAIN STREET) OVER ROUTE 9 (WORCESTER STREET) AND INTERCHANGE IMPROVEMENTS 3 CRRSAA $75,677,350 $58,797,419 $58,797,419 $0
2024 607977 Boston Region Multiple HOPKINTON- WESTBOROUGH- RECONSTRUCTION OF I-90/I-495 INTERCHANGE 3 HIP $300,942,837 $0 $0 $0
2024 607977 Boston Region Multiple HOPKINTON- WESTBOROUGH- RECONSTRUCTION OF I-90/I-495 INTERCHANGE 3 HIP-BR $300,942,837 $25,917,561 $20,734,049 $5,183,512
Bridge On-system Non-NHS NB $3,635,960 $2,908,768 $727,192
2024 608522 Boston Region Middleton MIDDLETON- BRIDGE REPLACEMENT, M-20-003, ROUTE 62 (MAPLE STREET) OVER IPSWICH RIVER 4 HIP-BR $3,635,960 $3,635,960 $2,908,768 $727,192
Bridge Systematic Maintenance NB $12,270,600 $9,816,480 $2,454,120
2024 613196 Boston Region Burlington BURLINGTON- LYNNFIELD- WAKEFIELD- WOBURN- BRIDGE PRESERVATION OF 10 BRIDGES CARRYING I-95 4 HIP-BR $3,999,600 $3,999,600 $3,199,680 $799,920
2024 613209 Boston Region Boston BOSTON- BRIDGE PRESERVATION, B-16-236 (39M, 39P, 39U, 39W, 39Y), 5 BRIDGES CARRYING STATE ROUTE 1A (EAST BOSTON EXPRESSWAY NB/SB) AND RAMPS 6 HIP-BR $6,525,000 $6,525,000 $5,220,000 $1,305,000
2024 613211 Boston Region Medford MEDFORD- BRIDGE PRESERVATION OF 10 BRIDGES CARRYING I-93 4 HIP-BR $1,746,000 $1,746,000 $1,396,800 $349,200
Section 2A / State Prioritized Reliability Projects $88,206,360 $23,362,907 $64,843,453
Bridge On-system NHS $49,450,000 $0 $49,450,000
2024 606496 Boston Region Boston BOSTON- BRIDGE REHABILITATION, B-16-052, BOWKER OVERPASS OVER MASS PIKE, MBTA/CSX, & IPSWICH STREET AND RAMPS (BINS 4FD, 4FG, 4FE, 4FF & 4FJ) 6 NGBP $0 $49,450,000 $0 $49,450,000
Bridge On-system Non-NHS $12,538,835 $0 $12,538,835
2024 606901 Boston Region Boston BOSTON- BRIDGE REPLACEMENT, B-16-109, RIVER STREET BRIDGE OVER MBTA/AMTRAK 6 NGBP $12,538,835 $12,538,835 $0 $12,538,835
Bridge Off-system $2,328,651 $1,862,921 $465,730
2024 609438 Boston Region Canton CANTON- BRIDGE REPLACEMENT, C-02-042, REVERE COURT OVER WEST BRANCH OF  THE NEPONSET RIVER 6 STBG-BR-Off $2,328,651 $2,328,651 $1,862,921 $465,730
Interstate Pavement $23,888,874 $21,499,987 $2,388,887
2024 612034 Boston Region Woburn WOBURN- INTERSTATE PAVEMENT PRESERVATION AND RELATED WORK ON I-95 4 NHPP-I $7,849,699 $7,849,699 $7,064,729 $784,970
2024 612048 Boston Region Waltham WALTHAM- INTERSTATE MAINTENANCE AND RELATED WORK ON I-95 4 NHPP-I $16,039,175 $16,039,175 $14,435,258 $1,603,918
Section 2B / State Prioritized Modernization Projects $35,700,614 $32,130,553 $3,570,061
Intersection Improvements $14,020,988 $12,618,889 $1,402,099
2024 607342 Boston Region Milton MILTON- INTERSECTION IMPROVEMENTS AT ROUTE 28 (RANDOLPH AVENUE) & CHICKATAWBUT ROAD 6 HSIP $7,746,838 $7,746,838 $6,972,154 $774,684
2024 608562 Boston Region Somerville SOMERVILLE- SIGNAL AND INTERSECTION IMPROVEMENT ON I-93 AT MYSTIC AVENUE AND MCGRATH HIGHWAY (TOP 200 CRASH LOCATION) 4 VUS $6,274,150 $2,500,000 $2,250,000 $250,000
2024 608562 Boston Region Somerville SOMERVILLE- SIGNAL AND INTERSECTION IMPROVEMENT ON I-93 AT MYSTIC AVENUE AND MCGRATH HIGHWAY (TOP 200 CRASH LOCATION) 4 HSIP $6,274,150 $3,774,150 $3,396,735 $377,415
Roadway Reconstruction $21,679,626 $19,511,663 $2,167,963
2024 607977 Boston Region Multiple HOPKINTON- WESTBOROUGH- RECONSTRUCTION OF I-90/I-495 INTERCHANGE 3 NHPP-I $300,942,837 $10,000,000 $9,000,000 $1,000,000
2024 607977 Boston Region Multiple HOPKINTON- WESTBOROUGH- RECONSTRUCTION OF I-90/I-495 INTERCHANGE 3 NFP-I $300,942,837 $11,679,626 $10,511,663 $1,167,963
Section 2C / State Prioritized Expansion Projects $0 $0 $0
Bicycle and Pedestrian $0 $0 $0
2024 611982 Boston Region Medford MEDFORD- SHARED USE PATH CONNECTION AT THE ROUTE 28/WELLINGTON UNDERPASS 4 CMAQ $4,560,833 $0 $0 $0
Section 3B / Non-Federal Aid Funded $88,668,835 $0 $88,668,835
Bridge On-system NHS $49,450,000 $0 $49,450,000
2024 606496 Boston Region Boston BOSTON- BRIDGE REHABILITATION, B-16-052, BOWKER OVERPASS OVER MASS PIKE, MBTA/CSX, & IPSWICH STREET AND RAMPS (BINS 4FD, 4FG, 4FE, 4FF & 4FJ) 6 NGBP $0 $49,450,000 $0 $49,450,000
Bridge On-system Non-NHS $12,538,835 $0 $12,538,835
2024 606901 Boston Region Boston BOSTON- BRIDGE REPLACEMENT, B-16-109, RIVER STREET BRIDGE OVER MBTA/AMTRAK 6 NGBP $12,538,835 $12,538,835 $0 $12,538,835
NFA $26,680,000 $0 $26,680,000
2024 607977 Boston Region Multiple HOPKINTON- WESTBOROUGH- RECONSTRUCTION OF I-90/I-495 INTERCHANGE 3 NFA $300,942,837 $26,680,000 $0 $26,680,000
STIP: 2024 - 2028 (D)
Year MassDOT Project ID MPO Municipality MassDOT Project Description District Funding Source Adjusted TFPC Total Programmed Funds Federal Funds Non-Federal Funds
Federal Fiscal Year 2025 $501,572,137 $215,647,964 $285,924,173
Section 1A / Regionally Prioritized Projects $126,475,489 $102,560,356 $23,915,134
Roadway Reconstruction $78,662,949 $63,530,359 $15,132,590
2025 605168 Boston Region Hingham HINGHAM- IMPROVEMENTS ON ROUTE 3A FROM OTIS STREET/COLE ROAD  INCLUDING SUMMER STREET AND ROTARY; ROCKLAND STREET TO GEORGE WASHINGTON BOULEVARD.   5 STBG $15,018,900 $13,518,900 $10,815,120 $2,703,780
2025 605168 Boston Region Hingham HINGHAM- IMPROVEMENTS ON ROUTE 3A FROM OTIS STREET/COLE ROAD  INCLUDING SUMMER STREET AND ROTARY; ROCKLAND STREET TO GEORGE WASHINGTON BOULEVARD.   5 TAP $15,018,900 $1,500,000 $1,200,000 $300,000
2025 605743 Boston Region Ipswich IPSWICH- RESURFACING & RELATED WORK ON CENTRAL & SOUTH MAIN STREETS 4 STBG $11,728,698 $0 $0 $0
2025 605743 Boston Region Ipswich IPSWICH- RESURFACING & RELATED WORK ON CENTRAL & SOUTH MAIN STREETS 4 TAP $11,728,698 $0 $0 $0
2025 606226 Boston Region Boston BOSTON- RECONSTRUCTION OF RUTHERFORD AVENUE, FROM CITY SQUARE TO SULLIVAN SQUARE 6 NHPP $197,759,449 $0 $0 $0
2025 606226 Boston Region Boston BOSTON- RECONSTRUCTION OF RUTHERFORD AVENUE, FROM CITY SQUARE TO SULLIVAN SQUARE 6 STBG $197,759,449 $0 $0 $0
2025 606226 Boston Region Boston BOSTON- RECONSTRUCTION OF RUTHERFORD AVENUE, FROM CITY SQUARE TO SULLIVAN SQUARE 6 TAP $197,759,449 $0 $0 $0
2025 606453 Boston Region Boston BOSTON- IMPROVEMENTS ON BOYLSTON STREET, FROM INTERSECTION OF BROOKLINE AVENUE & PARK DRIVE TO IPSWICH STREET 6 CMAQ $8,665,052 $5,000,000 $4,000,000 $1,000,000
2025 606453 Boston Region Boston BOSTON- IMPROVEMENTS ON BOYLSTON STREET, FROM INTERSECTION OF BROOKLINE AVENUE & PARK DRIVE TO IPSWICH STREET 6 STBG $8,665,052 $2,851,808 $2,281,446 $570,362
2025 606453 Boston Region Boston BOSTON- IMPROVEMENTS ON BOYLSTON STREET, FROM INTERSECTION OF BROOKLINE AVENUE & PARK DRIVE TO IPSWICH STREET 6 TAP $8,665,052 $813,244 $650,595 $162,649
2025 608051 Boston Region Wilmington WILMINGTON- RECONSTRUCTION ON ROUTE 38 (MAIN STREET), FROM ROUTE 62 TO THE WOBURN C.L. 4 CMAQ $23,731,429 $2,200,000 $1,760,000 $440,000
2025 608051 Boston Region Wilmington WILMINGTON- RECONSTRUCTION ON ROUTE 38 (MAIN STREET), FROM ROUTE 62 TO THE WOBURN C.L. 4 HSIP $23,731,429 $1,000,000 $900,000 $100,000
2025 608051 Boston Region Wilmington WILMINGTON- RECONSTRUCTION ON ROUTE 38 (MAIN STREET), FROM ROUTE 62 TO THE WOBURN C.L. 4 STBG $23,731,429 $20,531,429 $16,425,143 $4,106,286
2025 609252 Boston Region Lynn LYNN- REHABILITATION OF ESSEX STREET 4 CMAQ $19,698,640 $10,500,000 $8,400,000 $2,100,000
2025 609252 Boston Region Lynn LYNN- REHABILITATION OF ESSEX STREET 4 HSIP $19,698,640 $4,000,000 $3,600,000 $400,000
2025 609252 Boston Region Lynn LYNN- REHABILITATION OF ESSEX STREET 4 STBG $19,698,640 $5,198,640 $4,158,912 $1,039,728
2025 609257 Boston Region Everett EVERETT- RECONSTRUCTION OF BEACHAM STREET 4 HSIP $10,548,928 $1,000,000 $900,000 $100,000
2025 609257 Boston Region Everett EVERETT- RECONSTRUCTION OF BEACHAM STREET 4 STBG $10,548,928 $7,648,928 $6,119,142 $1,529,786
2025 609257 Boston Region Everett EVERETT- RECONSTRUCTION OF BEACHAM STREET 4 TAP $10,548,928 $1,900,000 $1,520,000 $380,000
2025 S12820 Boston Region   BIKESHARE SUPPORT SET ASIDE   STBG $6,000,000 $1,000,000 $800,000 $200,000
Intersection Improvements $1,978,080 $1,582,464 $395,616
2025 605857 Boston Region Norwood NORWOOD- INTERSECTION IMPROVEMENTS @ ROUTE 1 & UNIVERSITY AVENUE/EVERETT STREET  5 CMAQ $28,699,272 $0 $0 $0
2025 605857 Boston Region Norwood NORWOOD- INTERSECTION IMPROVEMENTS @ ROUTE 1 & UNIVERSITY AVENUE/EVERETT STREET  5 HSIP $28,699,272 $0 $0 $0
2025 605857 Boston Region Norwood NORWOOD- INTERSECTION IMPROVEMENTS @ ROUTE 1 & UNIVERSITY AVENUE/EVERETT STREET  5 NHPP $28,699,272 $0 $0 $0
2025 605857 Boston Region Norwood NORWOOD- INTERSECTION IMPROVEMENTS @ ROUTE 1 & UNIVERSITY AVENUE/EVERETT STREET  5 STBG $28,699,272 $0 $0 $0
2025 608067 Boston Region Woburn WOBURN- INTERSECTION RECONSTRUCTION AT ROUTE 3 (CAMBRIDGE ROAD) & BEDFORD ROAD AND SOUTH BEDFORD STREET 4 CMAQ $1,978,080 $1,978,080 $1,582,464 $395,616
Railroad Crossings $742,315 $742,315 $0
2025 608436 Boston Region   ASHLAND- REHABILITATION AND RAIL CROSSING IMPROVEMENTS ON CHERRY STREET 3 RRHE $1,222,315 $742,315 $742,315 $0
Safety Improvements $6,315,013 $5,683,512 $631,501
2025 609532 Boston Region Chelsea CHELSEA- TARGETED SAFETY IMPROVEMENTS AND RELATED WORK ON BROADWAY, FROM WILLIAMS STREET TO CITY HALL AVENUE 6 HSIP $6,315,013 $6,315,013 $5,683,512 $631,501
Bicycle and Pedestrian $15,777,132 $12,621,706 $3,155,426
2025 610544 Boston Region Peabody PEABODY- MULTI-USE PATH CONSTRUCTION OF INDEPENDENCE GREENWAY AT I-95 AND ROUTE 1 4 CMAQ $15,777,132 $5,500,000 $4,400,000 $1,100,000
2025 610544 Boston Region Peabody PEABODY- MULTI-USE PATH CONSTRUCTION OF INDEPENDENCE GREENWAY AT I-95 AND ROUTE 1 4 STBG $15,777,132 $7,277,132 $5,821,706 $1,455,426
2025 610544 Boston Region Peabody PEABODY- MULTI-USE PATH CONSTRUCTION OF INDEPENDENCE GREENWAY AT I-95 AND ROUTE 1 4 TAP $15,777,132 $3,000,000 $2,400,000 $600,000
Flex to FTA $17,413,405 $13,930,724 $3,482,681
2025 S12113 Boston Region   TRANSIT MODERNIZATION PROGRAM   CMAQ $26,000,000 $6,500,000 $5,200,000 $1,300,000
2025 S12700 Boston Region Multiple CATA ON DEMAND MICROTRANSIT SERVICE EXPANSION 4 CMAQ $813,291 $214,776 $171,821 $42,955
2025 S12701 Boston Region Multiple MWRTA CATCHCONNECT MICROTRANSIT SERVICE EXPANSION 3 CMAQ $450,163 $159,488 $127,590 $31,898
2025 S12703 Boston Region Multiple MONTACHUSETT RTA MICROTRANSIT SERVICE 3 CMAQ $1,316,061 $406,641 $325,313 $81,328
2025 S12807 Boston Region Multiple MWRTA CATCHCONNECT MICROTRANSIT EXPANSION PHASE 2 3 CMAQ $380,477 $132,500 $106,000 $26,500
2025 S12819 Boston Region Boston JACKSON SQUARE STATION ACCESSIBILITY IMPROVEMENTS 6 CMAQ $21,000,000 $10,000,000 $8,000,000 $2,000,000
Transit Grant Program $1,586,595 $1,269,276 $317,319
2025 S12124 Boston Region Multiple COMMUNITY CONNECTIONS PROGRAM   CMAQ $8,334,827 $942,804 $754,243 $188,561
2025 S12694 Boston Region Newton NEWMO MICROTRANSIT SERVICE EXPANSION 6 CMAQ $890,574 $209,663 $167,730 $41,933
2025 S12697 Boston Region Watertown PLEASANT STREET SHUTTLE SERVICE EXPANSION 6 CMAQ $1,002,198 $228,939 $183,151 $45,788
2025 S12699 Boston Region Stoneham STONEHAM SHUTTLE SERVICE 4 CMAQ $796,817 $205,189 $164,151 $41,038
Roadway Improvements $4,000,000 $3,200,000 $800,000
2025 S12825 Boston Region Multiple BOSTON MPO REGION - FFY2025 PROJECT DESIGN PILOT Multiple STBG $4,000,000 $4,000,000 $3,200,000 $800,000
Section 1B / Earmark or Discretionary Grant Funded Projects $34,984,926 $28,083,941 $6,900,985
Earmark Discretionary $30,480,000 $24,480,000 $6,000,000
2025 607977 Boston Region Multiple HOPKINTON- WESTBOROUGH- RECONSTRUCTION OF I-90/I-495 INTERCHANGE 3 HIP $300,942,837 $0 $0 $0
2025 607977 Boston Region Multiple HOPKINTON- WESTBOROUGH- RECONSTRUCTION OF I-90/I-495 INTERCHANGE 3 HIP-BR $300,942,837 $30,000,000 $24,000,000 $6,000,000
2025 608436 Boston Region   ASHLAND- REHABILITATION AND RAIL CROSSING IMPROVEMENTS ON CHERRY STREET 3 HPP-100 $1,222,315 $480,000 $480,000 $0
Bridge On-system Non-NHS NB $4,504,926 $3,603,941 $900,985
2025 608197 Boston Region Boston BOSTON- BRIDGE REHABILITATION, B-16-107, CANTERBURY STREET OVER AMTRAK RAILROAD 6 HIP-BR $4,504,926 $4,504,926 $3,603,941 $900,985
Section 2A / State Prioritized Reliability Projects $159,642,391 $43,187,022 $116,455,369
Bridge On-system NHS $81,232,390 $23,120,374 $58,112,016
2025 604564 Boston Region Maynard MAYNARD- BRIDGE REPLACEMENT, M-10-004, ROUTE 62 (MAIN STREET) OVER THE ASSABET RIVER 3 NGBP $6,036,680 $6,036,680 $0 $6,036,680
2025 607684 Boston Region Braintree BRAINTREE- BRIDGE REPLACEMENT, B-21-017, WASHINGTON STREET (ST 37) OVER MBTA/CSX RAILROAD 6 NGBP $7,695,470 $7,695,470 $0 $7,695,470
2025 608703 Boston Region Wilmington WILMINGTON- BRIDGE REPLACEMENT, W-38-029 (2KV), ST 129 LOWELL STREET OVER I 93 4 NHPP-PEN $16,592,888 $16,592,888 $13,274,310 $3,318,578
2025 610776 Boston Region Cambridge CAMBRIDGE- SUPERSTRUCTURE REPLACEMENT, C-01-031, US ROUTE 3/ROUTE 16/ROUTE 2 OVER MBTA REDLINE 6 NHPP-PEN $6,604,208 $6,604,208 $5,283,366 $1,320,842
2025 610782 Boston Region Multiple DANVERS- MIDDLETON- BRIDGE REPLACEMENT, D-03-009=M-20-005, ANDOVER STREET (SR 114) OVER IPSWICH RIVER 4 NHPP-PEN $5,703,371 $5,703,371 $4,562,697 $1,140,674
2025 612028 Boston Region Stoneham STONEHAM- DECK REPLACEMENT & SUPERSTRUCTURE REPAIRS, S-27-006 (2L2), (ST 28) FELLSWAY WEST OVER I-93 4 NGBP $3,120,000 $3,120,000 $0 $3,120,000
2025 612182 Boston Region Newton NEWTON- BRIDGE REPLACEMENT, N-12-040, BOYLSTON STREET OVER GREEN LINE D 6 NGBP $15,206,778 $15,206,778 $0 $15,206,778
2025 612184 Boston Region Revere REVERE- BRIDGE REPLACEMENT, R-05-015, REVERE BEACH PARKWAY OVER BROADWAY 4 NGBP $20,272,995 $20,272,995 $0 $20,272,995
Non-Interstate Pavement $21,696,726 $17,357,381 $4,339,345
2025 608498 Boston Region Multiple QUINCY- WEYMOUTH- BRAINTREE- RESURFACING AND RELATED WORK ON ROUTE 53 6 NHPP $6,635,050 $6,635,050 $5,308,040 $1,327,010
2025 609399 Boston Region Randolph RANDOLPH- RESURFACING AND RELATED WORK ON ROUTE 28 6 NHPP $7,194,377 $7,194,377 $5,755,502 $1,438,875
2025 610722 Boston Region Multiple ACTON- BOXBOROUGH- LITTLETON- PAVEMENT PRESERVATION ROUTE 2 3 NHPP $7,867,299 $7,867,299 $6,293,839 $1,573,460
Bridge On-system Non-NHS $53,326,690 $0 $53,326,690
2025 608952 Boston Region Chelsea CHELSEA- BRIDGE SUPERSTRUCTURE REPLACMENT C-09-013, WASHINGTON AVENUE, CARTER STREET & COUNTY ROAD/ROUTE 1 6 NGBP $20,438,134 $20,438,134 $0 $20,438,134
2025 612173 Boston Region Bellingham BELLINGHAM- BRIDGE REPLACEMENT, B-06-022, MAPLE STREET OVER I-495 3 NGBP $14,270,687 $14,270,687 $0 $14,270,687
2025 612178 Boston Region Natick NATICK- BRIDGE REPLACEMENT, N-03-010, SPEEN STREET OVER RR MBTA/CSX 3 NGBP $6,722,582 $6,722,582 $0 $6,722,582
2025 612196 Boston Region Braintree BRAINTREE- BRIDGE REPLACEMENT, B-21-067, JW MAHER HIGHWAY OVER MONATIQUOT RIVER 6 NGBP $11,895,287 $11,895,287 $0 $11,895,287
Bridge Off-system $3,386,585 $2,709,268 $677,317
2025 609467 Boston Region Multiple HAMILTON- IPSWICH- SUPERSTRUCTURE REPLACEMENT, H-03-002=I-01-006, WINTHROP STREET OVER IPSWICH RIVER 4 STBG-BR-Off $3,386,585 $3,386,585 $2,709,268 $677,317
Section 2B / State Prioritized Modernization Projects $40,141,530 $35,425,295 $4,716,235
Intersection Improvements $0 $0 $0
2025 607342 Boston Region Milton MILTON- INTERSECTION IMPROVEMENTS AT ROUTE 28 (RANDOLPH AVENUE) & CHICKATAWBUT ROAD 6 HSIP $7,746,838 $0 $0 $0
Roadway Reconstruction $36,619,271 $32,607,488 $4,011,783
2025 607977 Boston Region Multiple HOPKINTON- WESTBOROUGH- RECONSTRUCTION OF I-90/I-495 INTERCHANGE 3 NHPP-I $300,942,837 $15,000,000 $13,500,000 $1,500,000
2025 607977 Boston Region Multiple HOPKINTON- WESTBOROUGH- RECONSTRUCTION OF I-90/I-495 INTERCHANGE 3 NFP-I $300,942,837 $18,120,711 $16,308,640 $1,812,071
2025 609516 Boston Region Burlington BURLINGTON- IMPROVEMENTS AT I-95 (ROUTE 128)/ROUTE 3 INTERCHANGE 4 NHPP $3,498,560 $3,498,560 $2,798,848 $699,712
Safe Routes to School $3,522,259 $2,817,807 $704,452
2025 609531 Boston Region Arlington ARLINGTON- STRATTON SCHOOL IMPROVEMENTS (SRTS) 4 TAP $1,302,209 $1,302,209 $1,041,767 $260,442
2025 611997 Boston Region Newton NEWTON- HORACE MANN ELEMENTARY SCHOOL IMPROVEMENTS (SRTS) 6 TAP $861,238 $861,237 $688,990 $172,247
2025 612001 Boston Region Medford MEDFORD- MILTON FULLER ROBERTS ELEMENTARY SCHOOL (SRTS) 4 TAP $1,020,484 $1,020,484 $816,387 $204,097
2025 612100 Boston Region Revere REVERE- IMPROVEMENTS AT BEACHMONT VETERANS ELEMENTARY (SRTS) 4 TAP $338,329 $338,329 $270,663 $67,666
Section 2C / State Prioritized Expansion Projects $7,989,188 $6,391,350 $1,597,838
Bicycle and Pedestrian $7,989,188 $6,391,350 $1,597,838
2025 610680 Boston Region Natick NATICK- LAKE COCHITUATE PATH 3 CMAQ $3,428,355 $3,428,355 $2,742,684 $685,671
2025 611982 Boston Region Medford MEDFORD- SHARED USE PATH CONNECTION AT THE ROUTE 28/WELLINGTON UNDERPASS 4 CMAQ $4,560,833 $4,560,833 $3,648,666 $912,167
Section 3B / Non-Federal Aid Funded $132,338,613 $0 $132,338,613
Bridge On-system NHS $52,331,923 $0 $52,331,923
2025 604564 Boston Region Maynard MAYNARD- BRIDGE REPLACEMENT, M-10-004, ROUTE 62 (MAIN STREET) OVER THE ASSABET RIVER 3 NGBP $6,036,680 $6,036,680 $0 $6,036,680
2025 607684 Boston Region Braintree BRAINTREE- BRIDGE REPLACEMENT, B-21-017, WASHINGTON STREET (ST 37) OVER MBTA/CSX RAILROAD 6 NGBP $7,695,470 $7,695,470 $0 $7,695,470
2025 612028 Boston Region Stoneham STONEHAM- DECK REPLACEMENT & SUPERSTRUCTURE REPAIRS, S-27-006 (2L2), (ST 28) FELLSWAY WEST OVER I-93 4 NGBP $3,120,000 $3,120,000 $0 $3,120,000
2025 612182 Boston Region Newton NEWTON- BRIDGE REPLACEMENT, N-12-040, BOYLSTON STREET OVER GREEN LINE D 6 NGBP $15,206,778 $15,206,778 $0 $15,206,778
2025 612184 Boston Region Revere REVERE- BRIDGE REPLACEMENT, R-05-015, REVERE BEACH PARKWAY OVER BROADWAY 4 NGBP $20,272,995 $20,272,995 $0 $20,272,995
NFA $26,680,000 $0 $26,680,000
2025 607977 Boston Region Multiple HOPKINTON- WESTBOROUGH- RECONSTRUCTION OF I-90/I-495 INTERCHANGE 3 NFA $300,942,837 $26,680,000 $0 $26,680,000
Bridge On-system Non-NHS $53,326,690 $0 $53,326,690
2025 608952 Boston Region Chelsea CHELSEA- BRIDGE SUPERSTRUCTURE REPLACMENT C-09-013, WASHINGTON AVENUE, CARTER STREET & COUNTY ROAD/ROUTE 1 6 NGBP $20,438,134 $20,438,134 $0 $20,438,134
2025 612173 Boston Region Bellingham BELLINGHAM- BRIDGE REPLACEMENT, B-06-022, MAPLE STREET OVER I-495 3 NGBP $14,270,687 $14,270,687 $0 $14,270,687
2025 612178 Boston Region Natick NATICK- BRIDGE REPLACEMENT, N-03-010, SPEEN STREET OVER RR MBTA/CSX 3 NGBP $6,722,582 $6,722,582 $0 $6,722,582
2025 612196 Boston Region Braintree BRAINTREE- BRIDGE REPLACEMENT, B-21-067, JW MAHER HIGHWAY OVER MONATIQUOT RIVER 6 NGBP $11,895,287 $11,895,287 $0 $11,895,287
STIP: 2024 - 2028 (D)
Year MassDOT Project ID MPO Municipality MassDOT Project Description District Funding Source Adjusted TFPC Total Programmed Funds Federal Funds Non-Federal Funds
Federal Fiscal Year 2026 $505,966,124 $394,371,383 $111,594,741
Section 1A / Regionally Prioritized Projects $124,667,241 $100,565,496 $24,101,746
Roadway Reconstruction $64,435,864 $52,098,691 $12,337,173
2026 605743 Boston Region Ipswich IPSWICH- RESURFACING & RELATED WORK ON CENTRAL & SOUTH MAIN STREETS 4 STBG $11,728,698 $4,971,338 $3,977,070 $994,268
2026 605743 Boston Region Ipswich IPSWICH- RESURFACING & RELATED WORK ON CENTRAL & SOUTH MAIN STREETS 4 TAP $11,728,698 $730,738 $584,590 $146,148
2026 606226 Boston Region Boston BOSTON- RECONSTRUCTION OF RUTHERFORD AVENUE, FROM CITY SQUARE TO SULLIVAN SQUARE 6 NHPP $197,759,449 $0 $0 $0
2026 606226 Boston Region Boston BOSTON- RECONSTRUCTION OF RUTHERFORD AVENUE, FROM CITY SQUARE TO SULLIVAN SQUARE 6 STBG $197,759,449 $0 $0 $0
2026 606226 Boston Region Boston BOSTON- RECONSTRUCTION OF RUTHERFORD AVENUE, FROM CITY SQUARE TO SULLIVAN SQUARE 6 TAP $197,759,449 $0 $0 $0
2026 608045 Boston Region Milford MILFORD- REHABILITATION ON ROUTE 16, FROM ROUTE 109 TO BEAVER STREET 3 HSIP $9,758,201 $1,500,000 $1,350,000 $150,000
2026 608045 Boston Region Milford MILFORD- REHABILITATION ON ROUTE 16, FROM ROUTE 109 TO BEAVER STREET 3 STBG $9,758,201 $8,258,201 $6,606,561 $1,651,640
2026 608954 Boston Region Weston WESTON- RECONSTRUCTION ON ROUTE 30 6 STBG $16,420,119 $11,420,119 $9,136,095 $2,284,024
2026 608954 Boston Region Weston WESTON- RECONSTRUCTION ON ROUTE 30 6 TAP $16,420,119 $5,000,000 $4,000,000 $1,000,000
2026 609437 Boston Region Multiple SALEM- PEABODY- BOSTON STREET IMPROVEMENTS 4 STBG $14,172,868 $14,172,868 $11,338,294 $2,834,574
2026 610662 Boston Region Woburn WOBURN- ROADWAY AND INTERSECTION IMPROVEMENTS AT WOBURN COMMON, ROUTE 38 (MAIN STREET), WINN STREET, PLEASANT STREET AND MONTVALE AVENUE 4 HSIP $17,382,600 $4,000,000 $3,600,000 $400,000
2026 610662 Boston Region Woburn WOBURN- ROADWAY AND INTERSECTION IMPROVEMENTS AT WOBURN COMMON, ROUTE 38 (MAIN STREET), WINN STREET, PLEASANT STREET AND MONTVALE AVENUE 4 STBG $17,382,600 $13,382,600 $10,706,080 $2,676,520
2026 S12820 Boston Region   BIKESHARE SUPPORT SET ASIDE   STBG $6,000,000 $1,000,000 $800,000 $200,000
Intersection Improvements $13,311,175 $10,930,643 $2,380,532
2026 605857 Boston Region Norwood NORWOOD- INTERSECTION IMPROVEMENTS @ ROUTE 1 & UNIVERSITY AVENUE/EVERETT STREET  5 CMAQ $28,699,272 $0 $0 $0
2026 605857 Boston Region Norwood NORWOOD- INTERSECTION IMPROVEMENTS @ ROUTE 1 & UNIVERSITY AVENUE/EVERETT STREET  5 HSIP $28,699,272 $631,724 $568,552 $63,172
2026 605857 Boston Region Norwood NORWOOD- INTERSECTION IMPROVEMENTS @ ROUTE 1 & UNIVERSITY AVENUE/EVERETT STREET  5 NHPP $28,699,272 $4,998,901 $3,999,121 $999,780
2026 605857 Boston Region Norwood NORWOOD- INTERSECTION IMPROVEMENTS @ ROUTE 1 & UNIVERSITY AVENUE/EVERETT STREET  5 STBG $28,699,272 $5,495,247 $4,396,198 $1,099,049
2026 608940 Boston Region Weston WESTON- INTERSECTION IMPROVEMENTS BOSTON POST ROAD (ROUTE 20) AT WELLESLEY STREET  6 HSIP $2,185,303 $2,185,303 $1,966,773 $218,530
Bicycle and Pedestrian $21,288,202 $17,030,562 $4,257,640
2026 609204 Boston Region Belmont BELMONT- COMMUNITY PATH, BELMONT COMPONENT OF THE MCRT (PHASE I) 4 CMAQ $21,288,202 $7,288,202 $5,830,562 $1,457,640
2026 609204 Boston Region Belmont BELMONT- COMMUNITY PATH, BELMONT COMPONENT OF THE MCRT (PHASE I) 4 STBG $21,288,202 $9,000,000 $7,200,000 $1,800,000
2026 609204 Boston Region Belmont BELMONT- COMMUNITY PATH, BELMONT COMPONENT OF THE MCRT (PHASE I) 4 TAP $21,288,202 $5,000,000 $4,000,000 $1,000,000
Roadway Improvements $1,400,000 $1,120,000 $280,000
2026 612989 Boston Region Boston BOSTON- BRIDGE PRESERVATION, B-16-066 (38D), CAMBRIDGE STREET OVER MBTA 6 CMAQ $16,632,000 $1,400,000 $1,120,000 $280,000
Bridge On-system NHS $15,232,000 $12,185,600 $3,046,400
2026 612989 Boston Region Boston BOSTON- BRIDGE PRESERVATION, B-16-066 (38D), CAMBRIDGE STREET OVER MBTA 6 NHPP-PEN $16,632,000 $15,232,000 $12,185,600 $3,046,400
Flex to FTA $6,607,977 $5,286,382 $1,321,595
2026 S12113 Boston Region   TRANSIT MODERNIZATION PROGRAM   CMAQ $26,000,000 $6,500,000 $5,200,000 $1,300,000
2026 S12807 Boston Region Multiple MWRTA CATCHCONNECT MICROTRANSIT EXPANSION PHASE 2 3 CMAQ $380,477 $107,977 $86,382 $21,595
Transit Grant Program $2,392,023 $1,913,618 $478,405
2026 S12124 Boston Region Multiple COMMUNITY CONNECTIONS PROGRAM   CMAQ $8,334,827 $2,392,023 $1,913,618 $478,405
Section 1B / Earmark or Discretionary Grant Funded Projects $206,088,967 $165,499,525 $40,589,442
Earmark Discretionary $0 $0 $0
2026 607977 Boston Region Multiple HOPKINTON- WESTBOROUGH- RECONSTRUCTION OF I-90/I-495 INTERCHANGE 3 HIP $300,942,837 $0 $0 $0
Bridge On-system Non-NHS NB $6,947,208 $5,557,766 $1,389,442
2026 612075 Boston Region Salem SALEM- BRIDGE REPLACEMENT, S-01-024, JEFFERSON AVENUE OVER PARALLEL STREET 4 HIP-BR $3,123,360 $3,123,360 $2,498,688 $624,672
2026 612099 Boston Region   ASHLAND- BRIDGE REPLACEMENT, A-14-006, CORDAVILLE ROAD OVER SUDBURY RIVER 3 HIP-BR $3,823,848 $3,823,848 $3,059,078 $764,770
Bridge Off-system Local NB $3,141,758 $3,141,758 $0
2026 612076 Boston Region Topsfield TOPSFIELD- BRIDGE REPLACEMENT, T-06-013, PERKINS ROW OVER MILE BROOK 4 BROFF $3,141,758 $3,141,758 $3,141,758 $0
Bridge On-System NHS NB $196,000,001 $156,800,001 $39,200,000
2026 612496 Boston Region Somerville SOMERVILLE- BRIDGE PRESERVATION, S-17-031, I-93 (NB & SB) FROM ROUTE 28 TO TEMPLE STREET (PHASE 2) 4 HIP-BR $196,000,001 $196,000,001 $156,800,001 $39,200,000
Section 2A / State Prioritized Reliability Projects $72,552,107 $61,441,667 $11,110,441
Bridge On-system NHS $17,824,268 $14,259,414 $3,564,854
2026 605321 Boston Region Norwood NORWOOD- BRIDGE PRESERVATION, N-25-026, PROVIDENCE HIGHWAY (STATE ROUTE 1) OVER THE NEPONSET RIVER 5 NHPP $3,460,268 $868,000 $694,400 $173,600
2026 605321 Boston Region Norwood NORWOOD- BRIDGE PRESERVATION, N-25-026, PROVIDENCE HIGHWAY (STATE ROUTE 1) OVER THE NEPONSET RIVER 5 NHPP-PEN $3,460,268 $2,592,268 $2,073,814 $518,454
2026 606449 Boston Region Cambridge CAMBRIDGE- BRIDGE REPLACEMENT, C-01-008, FIRST STREET BRIDGE & C-01-040, LAND BOULEVARD/BROAD CANAL BRIDGE 6 NHPP $14,364,000 $14,364,000 $11,491,200 $2,872,800
Safety Improvements $21,175,209 $18,725,548 $2,449,661
2026 610675 Boston Region Chelsea CHELSEA- RECONSTRUCTION OF SPRUCE STREET, FROM EVERETT AVENUE TO WILLIAMS STREET 6 HSIP $5,841,153 $5,841,153 $5,257,038 $584,115
2026 611954 Boston Region Boston BOSTON- GUIDE AND TRAFFIC SIGN REPLACEMENT ON I-90/I-93 WITHIN CENTRAL ARTERY/TUNNEL SYSTEM 6 HSIP $2,423,736 $2,423,736 $2,181,362 $242,374
2026 611974 Boston Region Medford MEDFORD- INTERSECTION IMPROVEMENTS AT MAIN STREET/SOUTH STREET, MAIN STREET/MYSTIC VALLEY PARKWAY RAMPS, AND MAIN STREET/MYSTIC AVENUE 4 HSIP $9,177,840 $4,588,920 $4,130,028 $458,892
2026 612599 Boston Region Lynn LYNN- TARGETED SAFETY AND MULTIMODAL IMPROVEMENTS (PLAYBOOK PRIORITY CORRIDORS) 4 HSIP $8,321,400 $5,000,000 $4,500,000 $500,000
2026 612599 Boston Region Lynn LYNN- TARGETED SAFETY AND MULTIMODAL IMPROVEMENTS (PLAYBOOK PRIORITY CORRIDORS) 4 STBG $8,321,400 $3,321,400 $2,657,120 $664,280
Non-Interstate Pavement $17,406,630 $13,925,304 $3,481,326
2026 612049 Boston Region Randolph RANDOLPH- RESURFACING AND RELATED WORK ON ROUTE 24 6 NHPP $9,128,700 $9,128,700 $7,302,960 $1,825,740
2026 612050 Boston Region Multiple BRAINTREE- WEYMOUTH- RESURFACING AND RELATED WORK ON ROUTE 3 6 NHPP $8,277,930 $8,277,930 $6,622,344 $1,655,586
Interstate Pavement $16,146,000 $14,531,400 $1,614,600
2026 612051 Boston Region Multiple CANTON- MILTON- RANDOLPH- INTERSTATE MAINTENANCE AND RELATED WORK ON I-93 6 NHPP-I $16,146,000 $16,146,000 $14,531,400 $1,614,600
Section 2B / State Prioritized Modernization Projects $70,560,716 $62,531,022 $8,029,694
Roadway Reconstruction $48,088,307 $43,279,476 $4,808,831
2026 607977 Boston Region Multiple HOPKINTON- WESTBOROUGH- RECONSTRUCTION OF I-90/I-495 INTERCHANGE 3 NHPP-I $300,942,837 $41,613,593 $37,452,234 $4,161,359
2026 607977 Boston Region Multiple HOPKINTON- WESTBOROUGH- RECONSTRUCTION OF I-90/I-495 INTERCHANGE 3 NFP-I $300,942,837 $6,474,714 $5,827,243 $647,471
Intersection Improvements $12,736,182 $11,462,564 $1,273,618
2026 608564 Boston Region Watertown WATERTOWN- INTERSECTION IMPROVEMENTS AT ROUTE 16 AND GALEN STREET 6 HSIP $3,449,261 $3,449,261 $3,104,335 $344,926
2026 610665 Boston Region Stoneham STONEHAM- INTERSECTION IMPROVEMENTS AT ROUTE 28 (MAIN STREET), NORTH BORDER ROAD AND SOUTH STREET 4 HSIP $4,698,001 $4,698,001 $4,228,201 $469,800
2026 611974 Boston Region Medford MEDFORD- INTERSECTION IMPROVEMENTS AT MAIN STREET/SOUTH STREET, MAIN STREET/MYSTIC VALLEY PARKWAY RAMPS, AND MAIN STREET/MYSTIC AVENUE 4 HSIP $9,177,840 $4,588,920 $4,130,028 $458,892
Safe Routes to School $9,736,227 $7,788,982 $1,947,245
2026 610537 Boston Region Boston BOSTON- ELLIS ELEMENTARY TRAFFIC CALMING (SRTS) 6 TAP $2,737,728 $2,737,728 $2,190,182 $547,546
2026 612804 Boston Region Dedham DEDHAM- IMPROVEMENTS AT AVERY ELEMENTARY (SRTS) 6 TAP $1,626,334 $1,626,334 $1,301,067 $325,267
2026 612816 Boston Region Brookline BROOKLINE- IMPROVEMENTS AT WILLIAM H. LINCOLN SCHOOL (SRTS) 6 TAP $886,526 $886,526 $709,221 $177,305
2026 612884 Boston Region Chelsea CHELSEA- IMPROVEMENTS AT MARY C. BURKE ELEMENTARY (SRTS) 6 TAP $1,617,667 $1,617,667 $1,294,134 $323,533
2026 612889 Boston Region Sharon SHARON- COTTAGE STREET SCHOOL IMPROVEMENTS (SRTS) 5 TAP $1,497,906 $1,497,906 $1,198,325 $299,581
2026 612894 Boston Region Framingham FRAMINGHAM- IMPROVEMENTS AT HARMONY GROVE ELEMENTARY SCHOOL (SRTS) 3 TAP $1,370,066 $1,370,066 $1,096,053 $274,013
Section 2C / State Prioritized Expansion Projects $5,417,093 $4,333,674 $1,083,419
Bicycle and Pedestrian $5,417,093 $4,333,674 $1,083,419
2026 612523 Boston Region Revere REVERE- STATE ROAD BEACHMONT CONNECTOR 4 CMAQ $5,417,093 $5,417,093 $4,333,674 $1,083,419
Section 3B / Non-Federal Aid Funded $26,680,000 $0 $26,680,000
NFA $26,680,000 $0 $26,680,000
2026 607977 Boston Region Multiple HOPKINTON- WESTBOROUGH- RECONSTRUCTION OF I-90/I-495 INTERCHANGE 3 NFA $300,942,837 $26,680,000 $0 $26,680,000
STIP: 2024 - 2028 (D)
Year MassDOT Project ID MPO Municipality MassDOT Project Description District Funding Source Adjusted TFPC Total Programmed Funds Federal Funds Non-Federal Funds
Federal Fiscal Year 2027 $668,873,337 $238,594,194 $430,279,144
Section 1A / Regionally Prioritized Projects $144,006,044 $116,629,527 $27,376,517
Roadway Reconstruction $94,327,597 $76,362,078 $17,965,519
2027 605743 Boston Region Ipswich IPSWICH- RESURFACING & RELATED WORK ON CENTRAL & SOUTH MAIN STREETS 4 STBG $11,728,698 $6,026,622 $4,821,298 $1,205,324
2027 606226 Boston Region Boston BOSTON- RECONSTRUCTION OF RUTHERFORD AVENUE, FROM CITY SQUARE TO SULLIVAN SQUARE 6 NHPP $197,759,449 $8,600,000 $6,880,000 $1,720,000
2027 606226 Boston Region Boston BOSTON- RECONSTRUCTION OF RUTHERFORD AVENUE, FROM CITY SQUARE TO SULLIVAN SQUARE 6 STBG $197,759,449 $0 $0 $0
2027 606226 Boston Region Boston BOSTON- RECONSTRUCTION OF RUTHERFORD AVENUE, FROM CITY SQUARE TO SULLIVAN SQUARE 6 TAP $197,759,449 $0 $0 $0
2027 607981 Boston Region Somerville SOMERVILLE- MCGRATH BOULEVARD CONSTRUCTION 4 STBG $98,840,000 $20,000,000 $16,000,000 $4,000,000
2027 607981 Boston Region Somerville SOMERVILLE- MCGRATH BOULEVARD CONSTRUCTION 4 TAP $98,840,000 $2,000,000 $1,600,000 $400,000
2027 609246 Boston Region Lynn LYNN- REHABILITATION OF WESTERN AVENUE (ROUTE 107) 4 HSIP $45,897,600 $3,000,000 $2,700,000 $300,000
2027 609246 Boston Region Lynn LYNN- REHABILITATION OF WESTERN AVENUE (ROUTE 107) 4 STBG $45,897,600 $12,000,000 $9,600,000 $2,400,000
2027 610932 Boston Region Brookline BROOKLINE- REHABILITATION OF WASHINGTON STREET 6 HSIP $28,995,267 $5,000,000 $4,500,000 $500,000
2027 610932 Boston Region Brookline BROOKLINE- REHABILITATION OF WASHINGTON STREET 6 STBG $28,995,267 $23,995,267 $19,196,214 $4,799,053
2027 611983 Boston Region Chelsea CHELSEA- PARK STREET & PEARL STREET RECONSTRUCTION 6 HSIP $11,705,708 $1,000,000 $900,000 $100,000
2027 611983 Boston Region Chelsea CHELSEA- PARK STREET & PEARL STREET RECONSTRUCTION 6 STBG $11,705,708 $10,705,708 $8,564,566 $2,141,142
2027 S12820 Boston Region   BIKESHARE SUPPORT SET ASIDE   STBG $6,000,000 $2,000,000 $1,600,000 $400,000
Intersection Improvements $17,573,400 $14,058,720 $3,514,680
2027 605857 Boston Region Norwood NORWOOD- INTERSECTION IMPROVEMENTS @ ROUTE 1 & UNIVERSITY AVENUE/EVERETT STREET  5 CMAQ $28,699,272 $3,000,000 $2,400,000 $600,000
2027 605857 Boston Region Norwood NORWOOD- INTERSECTION IMPROVEMENTS @ ROUTE 1 & UNIVERSITY AVENUE/EVERETT STREET  5 NHPP $28,699,272 $3,573,400 $2,858,720 $714,680
2027 605857 Boston Region Norwood NORWOOD- INTERSECTION IMPROVEMENTS @ ROUTE 1 & UNIVERSITY AVENUE/EVERETT STREET  5 STBG $28,699,272 $11,000,000 $8,800,000 $2,200,000
Roadway Improvements $13,000,000 $10,400,000 $2,600,000
2027 607981 Boston Region Somerville SOMERVILLE- MCGRATH BOULEVARD CONSTRUCTION 4 NHPP $98,840,000 $13,000,000 $10,400,000 $2,600,000
Bicycle and Pedestrian $4,858,127 $3,886,502 $971,625
2027 613088 Boston Region Malden MALDEN- SPOT POND BROOK GREENWAY 4 CMAQ $4,858,127 $3,000,000 $2,400,000 $600,000
2027 613088 Boston Region Malden MALDEN- SPOT POND BROOK GREENWAY 4 TAP $4,858,127 $1,858,127 $1,486,502 $371,625
Safety Improvements $5,246,920 $4,722,228 $524,692
2027 613121 Boston Region Everett EVERETT- TARGETED MULTI-MODAL AND SAFETY IMPROVEMENTS ON ROUTE 16 (DESIGN ONLY) 4 HSIP $5,246,920 $5,246,920 $4,722,228 $524,692
Flex to FTA $6,500,000 $5,200,000 $1,300,000
2027 S12113 Boston Region   TRANSIT MODERNIZATION PROGRAM   CMAQ $26,000,000 $6,500,000 $5,200,000 $1,300,000
Transit Grant Program $2,500,000 $2,000,000 $500,000
2027 S12124 Boston Region Multiple COMMUNITY CONNECTIONS PROGRAM   CMAQ $8,334,827 $2,500,000 $2,000,000 $500,000
Section 2A / State Prioritized Reliability Projects $241,511,844 $41,990,597 $199,521,247
Bridge On-system Non-NHS $138,719,952 $0 $138,719,952
2027 605276 Boston Region Multiple BEVERLY- SALEM- DRAWBRIDGE REPLACEMENT/REHABILITATION OF B-11-005=S-01-013, KERNWOOD AVENUE OVER DANVERS RIVER 4 NGBP $92,094,352 $92,094,352 $0 $92,094,352
2027 607420 Boston Region Natick NATICK- SUPERSTRUCTURE REPLACEMENT, N-03-012, BODEN LANE OVER CSX/MBTA 3 NGBP $7,985,600 $7,985,600 $0 $7,985,600
2027 608514 Boston Region Beverly BEVERLY- BRIDGE REPLACEMENT, B-11-001, BRIDGE STREET OVER BASS RIVER (HALL-WHITAKER DRAWBRIDGE) 4 NGBP $38,640,000 $38,640,000 $0 $38,640,000
Bridge On-system NHS $96,351,892 $36,194,597 $60,157,295
2027 606728 Boston Region Boston BOSTON- BRIDGE REPLACEMENT B-16-365, STORROW DRIVE OVER BOWKER RAMPS 6 NHPP-PEN $112,056,000 $10,477,205 $8,381,764 $2,095,441
2027 611987 Boston Region Cambridge CAMBRIDGE- BRIDGE REPLACEMENT, C-01-026, MEMORIAL DRIVE OVER BROOKLINE STREET 6 NGBP $51,108,646 $51,108,646 $0 $51,108,646
2027 612519 Boston Region Boston BOSTON- BRIDGE REPLACEMENT, B-16-165, BLUE HILL AVENUE OVER RAILROAD 6 NHPP $34,766,041 $34,766,041 $27,812,833 $6,953,208
Non-Interstate Pavement $0 $0 $0
2027 609402 Boston Region Multiple FRAMINGHAM- NATICK- RESURFACING AND RELATED WORK ON ROUTE 9 3 NHPP $48,665,364 $0 $0 $0
Safety Improvements $6,440,000 $5,796,000 $644,000
2027 610650 Boston Region Boston BOSTON- GALLIVAN BOULEVARD (ROUTE 203) SAFETY IMPROVEMENTS, FROM WASHINGTON STREET TO GRANITE AVENUE 6 HSIP $6,440,000 $6,440,000 $5,796,000 $644,000
2027 612599 Boston Region Lynn LYNN- TARGETED SAFETY AND MULTIMODAL IMPROVEMENTS (PLAYBOOK PRIORITY CORRIDORS) 4 HSIP $8,321,400 $0 $0 $0
2027 612599 Boston Region Lynn LYNN- TARGETED SAFETY AND MULTIMODAL IMPROVEMENTS (PLAYBOOK PRIORITY CORRIDORS) 4 STBG $8,321,400 $0 $0 $0
Interstate Pavement $0 $0 $0
2027 612033 Boston Region Lynnfield LYNNFIELD- PEABODY- INTERSTATE MAINTENANCE AND RELATED WORK ON I-95 4 NHPP-I $8,575,451 $0 $0 $0
Section 2B / State Prioritized Modernization Projects $70,961,695 $61,921,945 $9,039,750
Roadway Reconstruction $63,007,343 $54,763,028 $8,244,315
2027 607977 Boston Region Multiple HOPKINTON- WESTBOROUGH- RECONSTRUCTION OF I-90/I-495 INTERCHANGE 3 NHPP-I $300,942,837 $17,928,463 $16,135,617 $1,792,846
2027 607977 Boston Region Multiple HOPKINTON- WESTBOROUGH- RECONSTRUCTION OF I-90/I-495 INTERCHANGE 3 NFP-I $300,942,837 $25,643,072 $23,078,765 $2,564,307
2027 612615 Boston Region Multiple CANTON- MILTON- ROADWAY RECONSTRUCTION ON ROUTE 138, FROM ROYALL STREET TO DOLLAR LANE 6 NHPP $19,435,808 $19,435,808 $15,548,646 $3,887,162
Intersection Improvements $7,954,352 $7,158,917 $795,435
2027 612613 Boston Region Newton NEWTON- INTERSECTION IMPROVEMENTS AT ROUTE 16 AND QUINOBEQUIN ROAD 6 HSIP $4,872,000 $4,872,000 $4,384,800 $487,200
2027 612616 Boston Region Milton MILTON- INTERSECTION IMPROVEMENTS AT ROUTE 138 AND BRADLEE ROAD 6 HSIP $3,082,352 $3,082,352 $2,774,117 $308,235
Section 2C / State Prioritized Expansion Projects $22,565,156 $18,052,125 $4,513,031
Bicycle and Pedestrian $22,565,156 $18,052,125 $4,513,031
2027 607329 Boston Region Multiple WAKEFIELD- LYNNFIELD- RAIL TRAIL EXTENSION, FROM THE GALVIN MIDDLE SCHOOL TO LYNNFIELD/PEABODY T.L. 4 CMAQ $24,543,047 $10,600,000 $8,480,000 $2,120,000
2027 610660 Boston Region Multiple SUDBURY- WAYLAND- MASS CENTRAL RAIL TRAIL (MCRT) 3 CMAQ $4,061,413 $4,061,413 $3,249,130 $812,283
2027 612499 Boston Region Medford MEDFORD- SOUTH MEDFORD CONNECTOR BIKE PATH 4 CMAQ $7,903,743 $7,903,743 $6,322,994 $1,580,749
Section 3B / Non-Federal Aid Funded $189,828,598 $0 $189,828,598
Bridge On-system Non-NHS $138,719,952 $0 $138,719,952
2027 605276 Boston Region Multiple BEVERLY- SALEM- DRAWBRIDGE REPLACEMENT/REHABILITATION OF B-11-005=S-01-013, KERNWOOD AVENUE OVER DANVERS RIVER 4 NGBP $92,094,352 $92,094,352 $0 $92,094,352
2027 607420 Boston Region Natick NATICK- SUPERSTRUCTURE REPLACEMENT, N-03-012, BODEN LANE OVER CSX/MBTA 3 NGBP $7,985,600 $7,985,600 $0 $7,985,600
2027 608514 Boston Region Beverly BEVERLY- BRIDGE REPLACEMENT, B-11-001, BRIDGE STREET OVER BASS RIVER (HALL-WHITAKER DRAWBRIDGE) 4 NGBP $38,640,000 $38,640,000 $0 $38,640,000
Bridge On-system NHS $51,108,646 $0 $51,108,646
2027 611987 Boston Region Cambridge CAMBRIDGE- BRIDGE REPLACEMENT, C-01-026, MEMORIAL DRIVE OVER BROOKLINE STREET 6 NGBP $51,108,646 $51,108,646 $0 $51,108,646
STIP: 2024 - 2028 (D)
Year MassDOT Project ID MPO Municipality MassDOT Project Description District Funding Source Adjusted TFPC Total Programmed Funds Federal Funds Non-Federal Funds
Federal Fiscal Year 2028 $500,800,259 $403,559,552 $97,240,707
Section 1A / Regionally Prioritized Projects $149,868,526 $120,394,821 $29,473,705
Roadway Reconstruction $124,176,075 $99,840,860 $24,335,215
2028 606226 Boston Region Boston BOSTON- RECONSTRUCTION OF RUTHERFORD AVENUE, FROM CITY SQUARE TO SULLIVAN SQUARE 6 NHPP $197,759,449 $12,000,000 $9,600,000 $2,400,000
2028 606226 Boston Region Boston BOSTON- RECONSTRUCTION OF RUTHERFORD AVENUE, FROM CITY SQUARE TO SULLIVAN SQUARE 6 STBG $197,759,449 $19,500,000 $15,600,000 $3,900,000
2028 606226 Boston Region Boston BOSTON- RECONSTRUCTION OF RUTHERFORD AVENUE, FROM CITY SQUARE TO SULLIVAN SQUARE 6 TAP $197,759,449 $2,000,000 $1,600,000 $400,000
2028 607981 Boston Region Somerville SOMERVILLE- MCGRATH BOULEVARD CONSTRUCTION 4 STBG $98,840,000 $30,000,000 $24,000,000 $6,000,000
2028 609246 Boston Region Lynn LYNN- REHABILITATION OF WESTERN AVENUE (ROUTE 107) 4 HSIP $45,897,600 $5,000,000 $4,500,000 $500,000
2028 609246 Boston Region Lynn LYNN- REHABILITATION OF WESTERN AVENUE (ROUTE 107) 4 STBG $45,897,600 $15,000,000 $12,000,000 $3,000,000
2028 S12820 Boston Region   BIKESHARE SUPPORT SET ASIDE   STBG $6,000,000 $2,000,000 $1,600,000 $400,000
2028 S12826 Boston Region Multiple WESTWOOD- NORWOOD- RECONSTRUCTION OF CANTON STREET TO UNIVERSITY DRIVE, INCLUDING REHAB OF N-25-032=W-31-018 6 CMAQ $22,094,875 $4,000,000 $3,200,000 $800,000
2028 S12826 Boston Region Multiple WESTWOOD- NORWOOD- RECONSTRUCTION OF CANTON STREET TO UNIVERSITY DRIVE, INCLUDING REHAB OF N-25-032=W-31-018 6 STBG $22,094,875 $18,094,875 $14,475,900 $3,618,975
2028 S12827 Boston Region Wakefield WAKEFIELD - MAIN STREET CORRIDOR IMPROVEMENT PROJECT 4 CMAQ $16,581,200 $8,000,000 $6,400,000 $1,600,000
2028 S12827 Boston Region Wakefield WAKEFIELD - MAIN STREET CORRIDOR IMPROVEMENT PROJECT 4 STBG $16,581,200 $7,081,200 $5,664,960 $1,416,240
2028 S12827 Boston Region Wakefield WAKEFIELD - MAIN STREET CORRIDOR IMPROVEMENT PROJECT 4 TAP $16,581,200 $1,500,000 $1,200,000 $300,000
Bicycle and Pedestrian $16,692,451 $13,353,961 $3,338,490
2028 610666 Boston Region Swampscott SWAMPSCOTT- RAIL TRAIL CONSTRUCTION 4 CMAQ $8,932,000 $7,300,000 $5,840,000 $1,460,000
2028 610666 Boston Region Swampscott SWAMPSCOTT- RAIL TRAIL CONSTRUCTION 4 TAP $8,932,000 $1,632,000 $1,305,600 $326,400
2028 610691 Boston Region Natick NATICK- COCHITUATE RAIL TRAIL EXTENSION, FROM MBTA STATION TO MECHANIC STREET 3 STBG $7,760,451 $7,760,451 $6,208,361 $1,552,090
Flex to FTA $6,500,000 $5,200,000 $1,300,000
2028 S12113 Boston Region   TRANSIT MODERNIZATION PROGRAM   CMAQ $26,000,000 $6,500,000 $5,200,000 $1,300,000
Transit Grant Program $2,500,000 $2,000,000 $500,000
2028 S12124 Boston Region Multiple COMMUNITY CONNECTIONS PROGRAM   CMAQ $8,334,827 $2,500,000 $2,000,000 $500,000
Section 1B / Earmark or Discretionary Grant Funded Projects $64,960,000 $51,968,000 $12,992,000
Bridge On-system Non-NHS NB $64,960,000 $51,968,000 $12,992,000
2028 608397 Boston Region Gloucester GLOUCESTER- BRIDGE RECONSTRUCTION, G-05-002, WESTERN AVENUE OVER BLYNMAN CANAL 4 HIP-BR $64,960,000 $64,960,000 $51,968,000 $12,992,000
Section 2A / State Prioritized Reliability Projects $234,431,079 $189,640,644 $44,790,435
Bridge On-system NHS $152,275,425 $121,820,340 $30,455,085
2028 606728 Boston Region Boston BOSTON- BRIDGE REPLACEMENT B-16-365, STORROW DRIVE OVER BOWKER RAMPS 6 NHPP-PEN $112,056,000 $40,075,975 $32,060,780 $8,015,195
2028 608396 Boston Region Multiple LYNN- REVERE- BRIDGE RECONSTRUCTION, L-18-015=R-05-008, ROUTE 1A OVER SAUGUS RIVER 4 NHPP $105,560,000 $54,185,724 $43,348,579 $10,837,145
2028 613124 Boston Region Boston BOSTON- DECK/SUPERSTRUCTURE REPLACEMENT, B-16-054 (4T2), BEACON STREET OVER I-90 (STRUCTURE 50, MILE 132.2) 6 NHPP $42,295,604 $24,642,463 $19,713,970 $4,928,493
2028 613124 Boston Region Boston BOSTON- DECK/SUPERSTRUCTURE REPLACEMENT, B-16-054 (4T2), BEACON STREET OVER I-90 (STRUCTURE 50, MILE 132.2) 6 NHPP-PEN $42,295,604 $17,653,141 $14,122,513 $3,530,628
2028 613125 Boston Region Boston BOSTON- DECK/SUPERSTRUCTURE REPLACEMENT OF BRIDGE B-16-051(4T5), MASS AVENUE OVER I-90 & MBTA (STRUCTURE 54, MILE 132.84)  6 NHPP-PEN $15,718,122 $15,718,122 $12,574,498 $3,143,624
Safety Improvements $16,183,809 $13,312,180 $2,871,629
2028 607748 Boston Region Acton ACTON- INTERSECTION & SIGNAL IMPROVEMENTS ON SR 2 & SR 111 (MASSACHUSETTS AVENUE) AT PIPER ROAD & TAYLOR ROAD 3 HSIP $4,382,329 $3,651,329 $3,286,196 $365,133
2028 611969 Boston Region Everett EVERETT- INTERSECTION IMPROVEMENTS ON ROUTE 16 4 NHPP $17,748,000 $12,532,480 $10,025,984 $2,506,496
Non-Interstate Pavement $48,665,364 $38,932,291 $9,733,073
2028 609402 Boston Region Multiple FRAMINGHAM- NATICK- RESURFACING AND RELATED WORK ON ROUTE 9 3 NHPP $48,665,364 $48,665,364 $38,932,291 $9,733,073
Interstate Pavement $17,306,481 $15,575,833 $1,730,648
2028 612033 Boston Region Lynnfield LYNNFIELD- PEABODY- INTERSTATE MAINTENANCE AND RELATED WORK ON I-95 4 NHPP-I $8,575,451 $8,575,451 $7,717,906 $857,545
2028 612094 Boston Region Multiple CANTON- DEDHAM- WESTWOOD- INTERSTATE MAINTENANCE AND RELATED WORK ON I-95 6 NHPP-I $8,731,030 $8,731,030 $7,857,927 $873,103
Section 2B / State Prioritized Modernization Projects $34,191,557 $27,676,809 $6,514,748
Intersection Improvements $2,458,573 $2,212,716 $245,857
2028 607748 Boston Region Acton ACTON- INTERSECTION & SIGNAL IMPROVEMENTS ON SR 2 & SR 111 (MASSACHUSETTS AVENUE) AT PIPER ROAD & TAYLOR ROAD 3 HSIP $4,382,329 $731,000 $657,900 $73,100
2028 608052 Boston Region Norwood NORWOOD- INTERSECTION & SIGNAL IMPROVEMENTS AT US 1 (PROVIDENCE HIGHWAY) & MORSE STREET 5 HSIP $1,727,573 $1,727,573 $1,554,816 $172,757
Roadway Reconstruction $31,732,984 $25,464,094 $6,268,890
2028 607977 Boston Region Multiple HOPKINTON- WESTBOROUGH- RECONSTRUCTION OF I-90/I-495 INTERCHANGE 3 NHPP-I $300,942,837 $777,064 $699,358 $77,706
2028 609527 Boston Region Reading READING- IMPROVEMENTS ON I-95 4 NHPP $17,376,800 $17,376,800 $13,901,440 $3,475,360
2028 610543 Boston Region Multiple REVERE- MALDEN- IMPROVEMENTS AT ROUTE 1 (NB) (PHASE 1) 4 NHPP $8,363,600 $8,363,600 $6,690,880 $1,672,720
2028 611969 Boston Region Everett EVERETT- INTERSECTION IMPROVEMENTS ON ROUTE 16 4 NHPP $17,748,000 $5,215,520 $4,172,416 $1,043,104
Section 2C / State Prioritized Expansion Projects $17,349,097 $13,879,278 $3,469,819
Bicycle and Pedestrian $17,349,097 $13,879,278 $3,469,819
2028 607329 Boston Region Multiple WAKEFIELD- LYNNFIELD- RAIL TRAIL EXTENSION, FROM THE GALVIN MIDDLE SCHOOL TO LYNNFIELD/PEABODY T.L. 4 CMAQ $24,543,047 $13,943,047 $11,154,438 $2,788,609
2028 612607 Boston Region Danvers DANVERS- RAIL TRAIL WEST EXTENSION (PHASE 3) 4 CMAQ $3,406,050 $3,406,050 $2,724,840 $681,210

 

 

 