STIP: 2024 - 2028 (D) | ||||||||||||
Year | MassDOT Project ID | MPO | Municipality | MassDOT Project Description | District | Funding Source | Adjusted TFPC | Total Programmed Funds | Federal Funds | Non-Federal Funds | ||
Federal Fiscal Year 2024 | $459,558,159 | $265,588,824 | $193,969,335 | |||||||||
Section 1A / Regionally Prioritized Projects | $120,591,048 | $97,222,838 | $23,368,210 | |||||||||
Bridge On-system NHS | $21,851,750 | $17,481,400 | $4,370,350 | |||||||||
2024 | 110980 | Boston Region | Multiple | NEWTON- WESTON- BRIDGE REHABILITATION, N-12-010=W-29-005, COMMONWEALTH AVENUE (ROUTE 30) OVER THE CHARLES RIVER | 6 | NHPP-PEN | $21,851,750 | $21,851,750 | $17,481,400 | $4,370,350 | ||
Roadway Reconstruction | $42,150,471 | $34,470,377 | $7,680,094 | |||||||||
2024 | 603739 | Boston Region | Wrentham | WRENTHAM- CONSTRUCTION OF ROUTE I-495/ROUTE 1A RAMPS | 5 | HSIP | $17,994,890 | $4,500,000 | $4,050,000 | $450,000 | ||
2024 | 603739 | Boston Region | Wrentham | WRENTHAM- CONSTRUCTION OF ROUTE I-495/ROUTE 1A RAMPS | 5 | STBG | $17,994,890 | $12,494,890 | $9,995,912 | $2,498,978 | ||
2024 | 603739 | Boston Region | Wrentham | WRENTHAM- CONSTRUCTION OF ROUTE I-495/ROUTE 1A RAMPS | 5 | TAP | $17,994,890 | $1,000,000 | $800,000 | $200,000 | ||
2024 | 606226 | Boston Region | Boston | BOSTON- RECONSTRUCTION OF RUTHERFORD AVENUE, FROM CITY SQUARE TO SULLIVAN SQUARE | 6 | NHPP | $197,759,449 | $0 | $0 | $0 | ||
2024 | 606226 | Boston Region | Boston | BOSTON- RECONSTRUCTION OF RUTHERFORD AVENUE, FROM CITY SQUARE TO SULLIVAN SQUARE | 6 | STBG | $197,759,449 | $0 | $0 | $0 | ||
2024 | 606226 | Boston Region | Boston | BOSTON- RECONSTRUCTION OF RUTHERFORD AVENUE, FROM CITY SQUARE TO SULLIVAN SQUARE | 6 | TAP | $197,759,449 | $0 | $0 | $0 | ||
2024 | 607777 | Boston Region | Watertown | WATERTOWN- REHABILITATION OF MOUNT AUBURN STREET (ROUTE 16) | 6 | CMAQ | $27,899,345 | $1,000,000 | $800,000 | $200,000 | ||
2024 | 607777 | Boston Region | Watertown | WATERTOWN- REHABILITATION OF MOUNT AUBURN STREET (ROUTE 16) | 6 | STBG | $27,899,345 | $2,494,249 | $1,995,399 | $498,850 | ||
2024 | 608007 | Boston Region | Multiple | COHASSET- SCITUATE- CORRIDOR IMPROVEMENTS AND RELATED WORK ON JUSTICE CUSHING HIGHWAY (ROUTE 3A), FROM BEECHWOOD STREET TO HENRY TURNER BAILEY ROAD | 5 | HSIP | $15,496,957 | $3,000,000 | $2,700,000 | $300,000 | ||
2024 | 608007 | Boston Region | Multiple | COHASSET- SCITUATE- CORRIDOR IMPROVEMENTS AND RELATED WORK ON JUSTICE CUSHING HIGHWAY (ROUTE 3A), FROM BEECHWOOD STREET TO HENRY TURNER BAILEY ROAD | 5 | STBG | $15,496,957 | $11,869,554 | $9,495,643 | $2,373,911 | ||
2024 | 608007 | Boston Region | Multiple | COHASSET- SCITUATE- CORRIDOR IMPROVEMENTS AND RELATED WORK ON JUSTICE CUSHING HIGHWAY (ROUTE 3A), FROM BEECHWOOD STREET TO HENRY TURNER BAILEY ROAD | 5 | TAP | $15,496,957 | $627,403 | $501,922 | $125,481 | ||
2024 | 609054 | Boston Region | Littleton | LITTLETON- RECONSTRUCTION OF FOSTER STREET | 3 | CMAQ | $5,164,375 | $1,500,000 | $1,200,000 | $300,000 | ||
2024 | 609054 | Boston Region | Littleton | LITTLETON- RECONSTRUCTION OF FOSTER STREET | 3 | STBG | $5,164,375 | $2,664,375 | $2,131,500 | $532,875 | ||
2024 | 609054 | Boston Region | Littleton | LITTLETON- RECONSTRUCTION OF FOSTER STREET | 3 | TAP | $5,164,375 | $1,000,000 | $800,000 | $200,000 | ||
Bicycle and Pedestrian | $7,556,704 | $6,045,363 | $1,511,341 | |||||||||
2024 | 609211 | Boston Region | Peabody | PEABODY- INDEPENDENCE GREENWAY EXTENSION | 4 | CMAQ | $7,524,204 | $3,524,204 | $2,819,363 | $704,841 | ||
2024 | 609211 | Boston Region | Peabody | PEABODY- INDEPENDENCE GREENWAY EXTENSION | 4 | TAP | $7,524,204 | $4,000,000 | $3,200,000 | $800,000 | ||
2024 | S12805 | Boston Region | Canton | CANTON PUBLIC SCHOOLS BIKE PROGRAM | 6 | CMAQ | $22,500 | $22,500 | $18,000 | $4,500 | ||
2024 | S12806 | Boston Region | Canton | CANTON CENTER BICYCLE RACKS | 6 | CMAQ | $10,000 | $10,000 | $8,000 | $2,000 | ||
Transit Grant Program | $2,549,479 | $2,039,583 | $509,896 | |||||||||
2024 | S12114 | Boston Region | Canton | ROYALL STREET SHUTTLE | CMAQ | $534,820 | $148,542 | $118,834 | $29,708 | |||
2024 | S12124 | Boston Region | Multiple | COMMUNITY CONNECTIONS PROGRAM | CMAQ | $8,334,827 | $0 | $0 | $0 | |||
2024 | S12694 | Boston Region | Newton | NEWMO MICROTRANSIT SERVICE EXPANSION | 6 | CMAQ | $890,574 | $268,246 | $214,597 | $53,649 | ||
2024 | S12697 | Boston Region | Watertown | PLEASANT STREET SHUTTLE SERVICE EXPANSION | 6 | CMAQ | $1,002,198 | $335,434 | $268,347 | $67,087 | ||
2024 | S12699 | Boston Region | Stoneham | STONEHAM SHUTTLE SERVICE | 4 | CMAQ | $796,817 | $261,439 | $209,151 | $52,288 | ||
2024 | S12803 | Boston Region | Medford | MEDFORD - BICYCLE PARKING (TIER 1) | 4 | CMAQ | $29,600 | $29,600 | $23,680 | $5,920 | ||
2024 | S12804 | Boston Region | Medford | MEDFORD - BLUEBIKES EXPANSION | 4 | CMAQ | $118,643 | $118,643 | $94,914 | $23,729 | ||
2024 | S12818 | Boston Region | Acton | ACTON PARKING MANAGEMENT SYSTEM | 3 | CMAQ | $15,000 | $15,000 | $12,000 | $3,000 | ||
2024 | S12823 | Boston Region | Boston | BOSTON - ELECTRIC BLUEBIKES ADOPTION | 6 | CMAQ | $1,020,000 | $1,020,000 | $816,000 | $204,000 | ||
2024 | S12824 | Boston Region | Cambridge | CAMBRIDGE - ELECTRIC BLUEBIKES ADOPTION | 6 | CMAQ | $352,575 | $352,575 | $282,060 | $70,515 | ||
Flex to FTA | $46,482,644 | $37,186,115 | $9,296,529 | |||||||||
2024 | S12700 | Boston Region | Multiple | CATA ON DEMAND MICROTRANSIT SERVICE EXPANSION | 4 | CMAQ | $813,291 | $265,065 | $212,052 | $53,013 | ||
2024 | S12701 | Boston Region | Multiple | MWRTA CATCHCONNECT MICROTRANSIT SERVICE EXPANSION | 3 | CMAQ | $450,163 | $149,425 | $119,540 | $29,885 | ||
2024 | S12703 | Boston Region | Multiple | MONTACHUSETT RTA MICROTRANSIT SERVICE | 3 | CMAQ | $1,316,061 | $430,354 | $344,283 | $86,071 | ||
2024 | S12705 | Boston Region | Lynn | LYNN STATION IMPROVEMENTS PHASE II | 4 | CMAQ | $48,100,000 | $13,600,000 | $10,880,000 | $2,720,000 | ||
2024 | S12705 | Boston Region | Lynn | LYNN STATION IMPROVEMENTS PHASE II | 4 | STBG | $48,100,000 | $0 | $0 | $0 | ||
2024 | S12802 | Boston Region | Lynn | LYNN - BROAD STREET CORRIDOR TRANSIT SIGNAL PRIORITY | 4 | CMAQ | $297,800 | $297,800 | $238,240 | $59,560 | ||
2024 | S12807 | Boston Region | Multiple | MWRTA CATCHCONNECT MICROTRANSIT EXPANSION PHASE 2 | 3 | CMAQ | $380,477 | $140,000 | $112,000 | $28,000 | ||
2024 | S12819 | Boston Region | Boston | JACKSON SQUARE STATION ACCESSIBILITY IMPROVEMENTS | 6 | CMAQ | $21,000,000 | $11,000,000 | $8,800,000 | $2,200,000 | ||
2024 | S12821 | Boston Region | Multiple | RAIL TRANSFORMATION - EARLY ACTION ITEMS - READING STATION AND WILBUR INTERLOCKING | 4 | CMAQ | $11,200,000 | $11,200,000 | $8,960,000 | $2,240,000 | ||
2024 | S12822 | Boston Region | Boston | COLUMBUS AVENUE BUS LANES PHASE 2 | 6 | CMAQ | $9,400,000 | $9,400,000 | $7,520,000 | $1,880,000 | ||
Section 1B / Earmark or Discretionary Grant Funded Projects | $126,391,302 | $112,872,525 | $13,518,777 | |||||||||
Bridge On-System NHS NB | $25,769,762 | $20,615,810 | $5,153,952 | |||||||||
2024 | 605313 | Boston Region | Natick | NATICK- BRIDGE REPLACEMENT, N-03-020, ROUTE 27 (NORTH MAIN STREET) OVER ROUTE 9 (WORCESTER STREET) AND INTERCHANGE IMPROVEMENTS | 3 | HIP-BR | $75,677,350 | $16,879,931 | $13,503,945 | $3,375,986 | ||
2024 | 606902 | Boston Region | Boston | BOSTON- BRIDGE REPLACEMENT, B-16-181, WEST ROXBURY PARKWAY OVER MBTA | 6 | HIP-BR | $8,889,831 | $8,889,831 | $7,111,865 | $1,777,966 | ||
Earmark Discretionary | $84,714,980 | $79,531,468 | $5,183,512 | |||||||||
2024 | 605313 | Boston Region | Natick | NATICK- BRIDGE REPLACEMENT, N-03-020, ROUTE 27 (NORTH MAIN STREET) OVER ROUTE 9 (WORCESTER STREET) AND INTERCHANGE IMPROVEMENTS | 3 | CRRSAA | $75,677,350 | $58,797,419 | $58,797,419 | $0 | ||
2024 | 607977 | Boston Region | Multiple | HOPKINTON- WESTBOROUGH- RECONSTRUCTION OF I-90/I-495 INTERCHANGE | 3 | HIP | $300,942,837 | $0 | $0 | $0 | ||
2024 | 607977 | Boston Region | Multiple | HOPKINTON- WESTBOROUGH- RECONSTRUCTION OF I-90/I-495 INTERCHANGE | 3 | HIP-BR | $300,942,837 | $25,917,561 | $20,734,049 | $5,183,512 | ||
Bridge On-system Non-NHS NB | $3,635,960 | $2,908,768 | $727,192 | |||||||||
2024 | 608522 | Boston Region | Middleton | MIDDLETON- BRIDGE REPLACEMENT, M-20-003, ROUTE 62 (MAPLE STREET) OVER IPSWICH RIVER | 4 | HIP-BR | $3,635,960 | $3,635,960 | $2,908,768 | $727,192 | ||
Bridge Systematic Maintenance NB | $12,270,600 | $9,816,480 | $2,454,120 | |||||||||
2024 | 613196 | Boston Region | Burlington | BURLINGTON- LYNNFIELD- WAKEFIELD- WOBURN- BRIDGE PRESERVATION OF 10 BRIDGES CARRYING I-95 | 4 | HIP-BR | $3,999,600 | $3,999,600 | $3,199,680 | $799,920 | ||
2024 | 613209 | Boston Region | Boston | BOSTON- BRIDGE PRESERVATION, B-16-236 (39M, 39P, 39U, 39W, 39Y), 5 BRIDGES CARRYING STATE ROUTE 1A (EAST BOSTON EXPRESSWAY NB/SB) AND RAMPS | 6 | HIP-BR | $6,525,000 | $6,525,000 | $5,220,000 | $1,305,000 | ||
2024 | 613211 | Boston Region | Medford | MEDFORD- BRIDGE PRESERVATION OF 10 BRIDGES CARRYING I-93 | 4 | HIP-BR | $1,746,000 | $1,746,000 | $1,396,800 | $349,200 | ||
Section 2A / State Prioritized Reliability Projects | $88,206,360 | $23,362,907 | $64,843,453 | |||||||||
Bridge On-system NHS | $49,450,000 | $0 | $49,450,000 | |||||||||
2024 | 606496 | Boston Region | Boston | BOSTON- BRIDGE REHABILITATION, B-16-052, BOWKER OVERPASS OVER MASS PIKE, MBTA/CSX, & IPSWICH STREET AND RAMPS (BINS 4FD, 4FG, 4FE, 4FF & 4FJ) | 6 | NGBP | $0 | $49,450,000 | $0 | $49,450,000 | ||
Bridge On-system Non-NHS | $12,538,835 | $0 | $12,538,835 | |||||||||
2024 | 606901 | Boston Region | Boston | BOSTON- BRIDGE REPLACEMENT, B-16-109, RIVER STREET BRIDGE OVER MBTA/AMTRAK | 6 | NGBP | $12,538,835 | $12,538,835 | $0 | $12,538,835 | ||
Bridge Off-system | $2,328,651 | $1,862,921 | $465,730 | |||||||||
2024 | 609438 | Boston Region | Canton | CANTON- BRIDGE REPLACEMENT, C-02-042, REVERE COURT OVER WEST BRANCH OF THE NEPONSET RIVER | 6 | STBG-BR-Off | $2,328,651 | $2,328,651 | $1,862,921 | $465,730 | ||
Interstate Pavement | $23,888,874 | $21,499,987 | $2,388,887 | |||||||||
2024 | 612034 | Boston Region | Woburn | WOBURN- INTERSTATE PAVEMENT PRESERVATION AND RELATED WORK ON I-95 | 4 | NHPP-I | $7,849,699 | $7,849,699 | $7,064,729 | $784,970 | ||
2024 | 612048 | Boston Region | Waltham | WALTHAM- INTERSTATE MAINTENANCE AND RELATED WORK ON I-95 | 4 | NHPP-I | $16,039,175 | $16,039,175 | $14,435,258 | $1,603,918 | ||
Section 2B / State Prioritized Modernization Projects | $35,700,614 | $32,130,553 | $3,570,061 | |||||||||
Intersection Improvements | $14,020,988 | $12,618,889 | $1,402,099 | |||||||||
2024 | 607342 | Boston Region | Milton | MILTON- INTERSECTION IMPROVEMENTS AT ROUTE 28 (RANDOLPH AVENUE) & CHICKATAWBUT ROAD | 6 | HSIP | $7,746,838 | $7,746,838 | $6,972,154 | $774,684 | ||
2024 | 608562 | Boston Region | Somerville | SOMERVILLE- SIGNAL AND INTERSECTION IMPROVEMENT ON I-93 AT MYSTIC AVENUE AND MCGRATH HIGHWAY (TOP 200 CRASH LOCATION) | 4 | VUS | $6,274,150 | $2,500,000 | $2,250,000 | $250,000 | ||
2024 | 608562 | Boston Region | Somerville | SOMERVILLE- SIGNAL AND INTERSECTION IMPROVEMENT ON I-93 AT MYSTIC AVENUE AND MCGRATH HIGHWAY (TOP 200 CRASH LOCATION) | 4 | HSIP | $6,274,150 | $3,774,150 | $3,396,735 | $377,415 | ||
Roadway Reconstruction | $21,679,626 | $19,511,663 | $2,167,963 | |||||||||
2024 | 607977 | Boston Region | Multiple | HOPKINTON- WESTBOROUGH- RECONSTRUCTION OF I-90/I-495 INTERCHANGE | 3 | NHPP-I | $300,942,837 | $10,000,000 | $9,000,000 | $1,000,000 | ||
2024 | 607977 | Boston Region | Multiple | HOPKINTON- WESTBOROUGH- RECONSTRUCTION OF I-90/I-495 INTERCHANGE | 3 | NFP-I | $300,942,837 | $11,679,626 | $10,511,663 | $1,167,963 | ||
Section 2C / State Prioritized Expansion Projects | $0 | $0 | $0 | |||||||||
Bicycle and Pedestrian | $0 | $0 | $0 | |||||||||
2024 | 611982 | Boston Region | Medford | MEDFORD- SHARED USE PATH CONNECTION AT THE ROUTE 28/WELLINGTON UNDERPASS | 4 | CMAQ | $4,560,833 | $0 | $0 | $0 | ||
Section 3B / Non-Federal Aid Funded | $88,668,835 | $0 | $88,668,835 | |||||||||
Bridge On-system NHS | $49,450,000 | $0 | $49,450,000 | |||||||||
2024 | 606496 | Boston Region | Boston | BOSTON- BRIDGE REHABILITATION, B-16-052, BOWKER OVERPASS OVER MASS PIKE, MBTA/CSX, & IPSWICH STREET AND RAMPS (BINS 4FD, 4FG, 4FE, 4FF & 4FJ) | 6 | NGBP | $0 | $49,450,000 | $0 | $49,450,000 | ||
Bridge On-system Non-NHS | $12,538,835 | $0 | $12,538,835 | |||||||||
2024 | 606901 | Boston Region | Boston | BOSTON- BRIDGE REPLACEMENT, B-16-109, RIVER STREET BRIDGE OVER MBTA/AMTRAK | 6 | NGBP | $12,538,835 | $12,538,835 | $0 | $12,538,835 | ||
NFA | $26,680,000 | $0 | $26,680,000 | |||||||||
2024 | 607977 | Boston Region | Multiple | HOPKINTON- WESTBOROUGH- RECONSTRUCTION OF I-90/I-495 INTERCHANGE | 3 | NFA | $300,942,837 | $26,680,000 | $0 | $26,680,000 |
STIP: 2024 - 2028 (D) | ||||||||||||
Year | MassDOT Project ID | MPO | Municipality | MassDOT Project Description | District | Funding Source | Adjusted TFPC | Total Programmed Funds | Federal Funds | Non-Federal Funds | ||
Federal Fiscal Year 2025 | $501,572,137 | $215,647,964 | $285,924,173 | |||||||||
Section 1A / Regionally Prioritized Projects | $126,475,489 | $102,560,356 | $23,915,134 | |||||||||
Roadway Reconstruction | $78,662,949 | $63,530,359 | $15,132,590 | |||||||||
2025 | 605168 | Boston Region | Hingham | HINGHAM- IMPROVEMENTS ON ROUTE 3A FROM OTIS STREET/COLE ROAD INCLUDING SUMMER STREET AND ROTARY; ROCKLAND STREET TO GEORGE WASHINGTON BOULEVARD. | 5 | STBG | $15,018,900 | $13,518,900 | $10,815,120 | $2,703,780 | ||
2025 | 605168 | Boston Region | Hingham | HINGHAM- IMPROVEMENTS ON ROUTE 3A FROM OTIS STREET/COLE ROAD INCLUDING SUMMER STREET AND ROTARY; ROCKLAND STREET TO GEORGE WASHINGTON BOULEVARD. | 5 | TAP | $15,018,900 | $1,500,000 | $1,200,000 | $300,000 | ||
2025 | 605743 | Boston Region | Ipswich | IPSWICH- RESURFACING & RELATED WORK ON CENTRAL & SOUTH MAIN STREETS | 4 | STBG | $11,728,698 | $0 | $0 | $0 | ||
2025 | 605743 | Boston Region | Ipswich | IPSWICH- RESURFACING & RELATED WORK ON CENTRAL & SOUTH MAIN STREETS | 4 | TAP | $11,728,698 | $0 | $0 | $0 | ||
2025 | 606226 | Boston Region | Boston | BOSTON- RECONSTRUCTION OF RUTHERFORD AVENUE, FROM CITY SQUARE TO SULLIVAN SQUARE | 6 | NHPP | $197,759,449 | $0 | $0 | $0 | ||
2025 | 606226 | Boston Region | Boston | BOSTON- RECONSTRUCTION OF RUTHERFORD AVENUE, FROM CITY SQUARE TO SULLIVAN SQUARE | 6 | STBG | $197,759,449 | $0 | $0 | $0 | ||
2025 | 606226 | Boston Region | Boston | BOSTON- RECONSTRUCTION OF RUTHERFORD AVENUE, FROM CITY SQUARE TO SULLIVAN SQUARE | 6 | TAP | $197,759,449 | $0 | $0 | $0 | ||
2025 | 606453 | Boston Region | Boston | BOSTON- IMPROVEMENTS ON BOYLSTON STREET, FROM INTERSECTION OF BROOKLINE AVENUE & PARK DRIVE TO IPSWICH STREET | 6 | CMAQ | $8,665,052 | $5,000,000 | $4,000,000 | $1,000,000 | ||
2025 | 606453 | Boston Region | Boston | BOSTON- IMPROVEMENTS ON BOYLSTON STREET, FROM INTERSECTION OF BROOKLINE AVENUE & PARK DRIVE TO IPSWICH STREET | 6 | STBG | $8,665,052 | $2,851,808 | $2,281,446 | $570,362 | ||
2025 | 606453 | Boston Region | Boston | BOSTON- IMPROVEMENTS ON BOYLSTON STREET, FROM INTERSECTION OF BROOKLINE AVENUE & PARK DRIVE TO IPSWICH STREET | 6 | TAP | $8,665,052 | $813,244 | $650,595 | $162,649 | ||
2025 | 608051 | Boston Region | Wilmington | WILMINGTON- RECONSTRUCTION ON ROUTE 38 (MAIN STREET), FROM ROUTE 62 TO THE WOBURN C.L. | 4 | CMAQ | $23,731,429 | $2,200,000 | $1,760,000 | $440,000 | ||
2025 | 608051 | Boston Region | Wilmington | WILMINGTON- RECONSTRUCTION ON ROUTE 38 (MAIN STREET), FROM ROUTE 62 TO THE WOBURN C.L. | 4 | HSIP | $23,731,429 | $1,000,000 | $900,000 | $100,000 | ||
2025 | 608051 | Boston Region | Wilmington | WILMINGTON- RECONSTRUCTION ON ROUTE 38 (MAIN STREET), FROM ROUTE 62 TO THE WOBURN C.L. | 4 | STBG | $23,731,429 | $20,531,429 | $16,425,143 | $4,106,286 | ||
2025 | 609252 | Boston Region | Lynn | LYNN- REHABILITATION OF ESSEX STREET | 4 | CMAQ | $19,698,640 | $10,500,000 | $8,400,000 | $2,100,000 | ||
2025 | 609252 | Boston Region | Lynn | LYNN- REHABILITATION OF ESSEX STREET | 4 | HSIP | $19,698,640 | $4,000,000 | $3,600,000 | $400,000 | ||
2025 | 609252 | Boston Region | Lynn | LYNN- REHABILITATION OF ESSEX STREET | 4 | STBG | $19,698,640 | $5,198,640 | $4,158,912 | $1,039,728 | ||
2025 | 609257 | Boston Region | Everett | EVERETT- RECONSTRUCTION OF BEACHAM STREET | 4 | HSIP | $10,548,928 | $1,000,000 | $900,000 | $100,000 | ||
2025 | 609257 | Boston Region | Everett | EVERETT- RECONSTRUCTION OF BEACHAM STREET | 4 | STBG | $10,548,928 | $7,648,928 | $6,119,142 | $1,529,786 | ||
2025 | 609257 | Boston Region | Everett | EVERETT- RECONSTRUCTION OF BEACHAM STREET | 4 | TAP | $10,548,928 | $1,900,000 | $1,520,000 | $380,000 | ||
2025 | S12820 | Boston Region | BIKESHARE SUPPORT SET ASIDE | STBG | $6,000,000 | $1,000,000 | $800,000 | $200,000 | ||||
Intersection Improvements | $1,978,080 | $1,582,464 | $395,616 | |||||||||
2025 | 605857 | Boston Region | Norwood | NORWOOD- INTERSECTION IMPROVEMENTS @ ROUTE 1 & UNIVERSITY AVENUE/EVERETT STREET | 5 | CMAQ | $28,699,272 | $0 | $0 | $0 | ||
2025 | 605857 | Boston Region | Norwood | NORWOOD- INTERSECTION IMPROVEMENTS @ ROUTE 1 & UNIVERSITY AVENUE/EVERETT STREET | 5 | HSIP | $28,699,272 | $0 | $0 | $0 | ||
2025 | 605857 | Boston Region | Norwood | NORWOOD- INTERSECTION IMPROVEMENTS @ ROUTE 1 & UNIVERSITY AVENUE/EVERETT STREET | 5 | NHPP | $28,699,272 | $0 | $0 | $0 | ||
2025 | 605857 | Boston Region | Norwood | NORWOOD- INTERSECTION IMPROVEMENTS @ ROUTE 1 & UNIVERSITY AVENUE/EVERETT STREET | 5 | STBG | $28,699,272 | $0 | $0 | $0 | ||
2025 | 608067 | Boston Region | Woburn | WOBURN- INTERSECTION RECONSTRUCTION AT ROUTE 3 (CAMBRIDGE ROAD) & BEDFORD ROAD AND SOUTH BEDFORD STREET | 4 | CMAQ | $1,978,080 | $1,978,080 | $1,582,464 | $395,616 | ||
Railroad Crossings | $742,315 | $742,315 | $0 | |||||||||
2025 | 608436 | Boston Region | ASHLAND- REHABILITATION AND RAIL CROSSING IMPROVEMENTS ON CHERRY STREET | 3 | RRHE | $1,222,315 | $742,315 | $742,315 | $0 | |||
Safety Improvements | $6,315,013 | $5,683,512 | $631,501 | |||||||||
2025 | 609532 | Boston Region | Chelsea | CHELSEA- TARGETED SAFETY IMPROVEMENTS AND RELATED WORK ON BROADWAY, FROM WILLIAMS STREET TO CITY HALL AVENUE | 6 | HSIP | $6,315,013 | $6,315,013 | $5,683,512 | $631,501 | ||
Bicycle and Pedestrian | $15,777,132 | $12,621,706 | $3,155,426 | |||||||||
2025 | 610544 | Boston Region | Peabody | PEABODY- MULTI-USE PATH CONSTRUCTION OF INDEPENDENCE GREENWAY AT I-95 AND ROUTE 1 | 4 | CMAQ | $15,777,132 | $5,500,000 | $4,400,000 | $1,100,000 | ||
2025 | 610544 | Boston Region | Peabody | PEABODY- MULTI-USE PATH CONSTRUCTION OF INDEPENDENCE GREENWAY AT I-95 AND ROUTE 1 | 4 | STBG | $15,777,132 | $7,277,132 | $5,821,706 | $1,455,426 | ||
2025 | 610544 | Boston Region | Peabody | PEABODY- MULTI-USE PATH CONSTRUCTION OF INDEPENDENCE GREENWAY AT I-95 AND ROUTE 1 | 4 | TAP | $15,777,132 | $3,000,000 | $2,400,000 | $600,000 | ||
Flex to FTA | $17,413,405 | $13,930,724 | $3,482,681 | |||||||||
2025 | S12113 | Boston Region | TRANSIT MODERNIZATION PROGRAM | CMAQ | $26,000,000 | $6,500,000 | $5,200,000 | $1,300,000 | ||||
2025 | S12700 | Boston Region | Multiple | CATA ON DEMAND MICROTRANSIT SERVICE EXPANSION | 4 | CMAQ | $813,291 | $214,776 | $171,821 | $42,955 | ||
2025 | S12701 | Boston Region | Multiple | MWRTA CATCHCONNECT MICROTRANSIT SERVICE EXPANSION | 3 | CMAQ | $450,163 | $159,488 | $127,590 | $31,898 | ||
2025 | S12703 | Boston Region | Multiple | MONTACHUSETT RTA MICROTRANSIT SERVICE | 3 | CMAQ | $1,316,061 | $406,641 | $325,313 | $81,328 | ||
2025 | S12807 | Boston Region | Multiple | MWRTA CATCHCONNECT MICROTRANSIT EXPANSION PHASE 2 | 3 | CMAQ | $380,477 | $132,500 | $106,000 | $26,500 | ||
2025 | S12819 | Boston Region | Boston | JACKSON SQUARE STATION ACCESSIBILITY IMPROVEMENTS | 6 | CMAQ | $21,000,000 | $10,000,000 | $8,000,000 | $2,000,000 | ||
Transit Grant Program | $1,586,595 | $1,269,276 | $317,319 | |||||||||
2025 | S12124 | Boston Region | Multiple | COMMUNITY CONNECTIONS PROGRAM | CMAQ | $8,334,827 | $942,804 | $754,243 | $188,561 | |||
2025 | S12694 | Boston Region | Newton | NEWMO MICROTRANSIT SERVICE EXPANSION | 6 | CMAQ | $890,574 | $209,663 | $167,730 | $41,933 | ||
2025 | S12697 | Boston Region | Watertown | PLEASANT STREET SHUTTLE SERVICE EXPANSION | 6 | CMAQ | $1,002,198 | $228,939 | $183,151 | $45,788 | ||
2025 | S12699 | Boston Region | Stoneham | STONEHAM SHUTTLE SERVICE | 4 | CMAQ | $796,817 | $205,189 | $164,151 | $41,038 | ||
Roadway Improvements | $4,000,000 | $3,200,000 | $800,000 | |||||||||
2025 | S12825 | Boston Region | Multiple | BOSTON MPO REGION - FFY2025 PROJECT DESIGN PILOT | Multiple | STBG | $4,000,000 | $4,000,000 | $3,200,000 | $800,000 | ||
Section 1B / Earmark or Discretionary Grant Funded Projects | $34,984,926 | $28,083,941 | $6,900,985 | |||||||||
Earmark Discretionary | $30,480,000 | $24,480,000 | $6,000,000 | |||||||||
2025 | 607977 | Boston Region | Multiple | HOPKINTON- WESTBOROUGH- RECONSTRUCTION OF I-90/I-495 INTERCHANGE | 3 | HIP | $300,942,837 | $0 | $0 | $0 | ||
2025 | 607977 | Boston Region | Multiple | HOPKINTON- WESTBOROUGH- RECONSTRUCTION OF I-90/I-495 INTERCHANGE | 3 | HIP-BR | $300,942,837 | $30,000,000 | $24,000,000 | $6,000,000 | ||
2025 | 608436 | Boston Region | ASHLAND- REHABILITATION AND RAIL CROSSING IMPROVEMENTS ON CHERRY STREET | 3 | HPP-100 | $1,222,315 | $480,000 | $480,000 | $0 | |||
Bridge On-system Non-NHS NB | $4,504,926 | $3,603,941 | $900,985 | |||||||||
2025 | 608197 | Boston Region | Boston | BOSTON- BRIDGE REHABILITATION, B-16-107, CANTERBURY STREET OVER AMTRAK RAILROAD | 6 | HIP-BR | $4,504,926 | $4,504,926 | $3,603,941 | $900,985 | ||
Section 2A / State Prioritized Reliability Projects | $159,642,391 | $43,187,022 | $116,455,369 | |||||||||
Bridge On-system NHS | $81,232,390 | $23,120,374 | $58,112,016 | |||||||||
2025 | 604564 | Boston Region | Maynard | MAYNARD- BRIDGE REPLACEMENT, M-10-004, ROUTE 62 (MAIN STREET) OVER THE ASSABET RIVER | 3 | NGBP | $6,036,680 | $6,036,680 | $0 | $6,036,680 | ||
2025 | 607684 | Boston Region | Braintree | BRAINTREE- BRIDGE REPLACEMENT, B-21-017, WASHINGTON STREET (ST 37) OVER MBTA/CSX RAILROAD | 6 | NGBP | $7,695,470 | $7,695,470 | $0 | $7,695,470 | ||
2025 | 608703 | Boston Region | Wilmington | WILMINGTON- BRIDGE REPLACEMENT, W-38-029 (2KV), ST 129 LOWELL STREET OVER I 93 | 4 | NHPP-PEN | $16,592,888 | $16,592,888 | $13,274,310 | $3,318,578 | ||
2025 | 610776 | Boston Region | Cambridge | CAMBRIDGE- SUPERSTRUCTURE REPLACEMENT, C-01-031, US ROUTE 3/ROUTE 16/ROUTE 2 OVER MBTA REDLINE | 6 | NHPP-PEN | $6,604,208 | $6,604,208 | $5,283,366 | $1,320,842 | ||
2025 | 610782 | Boston Region | Multiple | DANVERS- MIDDLETON- BRIDGE REPLACEMENT, D-03-009=M-20-005, ANDOVER STREET (SR 114) OVER IPSWICH RIVER | 4 | NHPP-PEN | $5,703,371 | $5,703,371 | $4,562,697 | $1,140,674 | ||
2025 | 612028 | Boston Region | Stoneham | STONEHAM- DECK REPLACEMENT & SUPERSTRUCTURE REPAIRS, S-27-006 (2L2), (ST 28) FELLSWAY WEST OVER I-93 | 4 | NGBP | $3,120,000 | $3,120,000 | $0 | $3,120,000 | ||
2025 | 612182 | Boston Region | Newton | NEWTON- BRIDGE REPLACEMENT, N-12-040, BOYLSTON STREET OVER GREEN LINE D | 6 | NGBP | $15,206,778 | $15,206,778 | $0 | $15,206,778 | ||
2025 | 612184 | Boston Region | Revere | REVERE- BRIDGE REPLACEMENT, R-05-015, REVERE BEACH PARKWAY OVER BROADWAY | 4 | NGBP | $20,272,995 | $20,272,995 | $0 | $20,272,995 | ||
Non-Interstate Pavement | $21,696,726 | $17,357,381 | $4,339,345 | |||||||||
2025 | 608498 | Boston Region | Multiple | QUINCY- WEYMOUTH- BRAINTREE- RESURFACING AND RELATED WORK ON ROUTE 53 | 6 | NHPP | $6,635,050 | $6,635,050 | $5,308,040 | $1,327,010 | ||
2025 | 609399 | Boston Region | Randolph | RANDOLPH- RESURFACING AND RELATED WORK ON ROUTE 28 | 6 | NHPP | $7,194,377 | $7,194,377 | $5,755,502 | $1,438,875 | ||
2025 | 610722 | Boston Region | Multiple | ACTON- BOXBOROUGH- LITTLETON- PAVEMENT PRESERVATION ROUTE 2 | 3 | NHPP | $7,867,299 | $7,867,299 | $6,293,839 | $1,573,460 | ||
Bridge On-system Non-NHS | $53,326,690 | $0 | $53,326,690 | |||||||||
2025 | 608952 | Boston Region | Chelsea | CHELSEA- BRIDGE SUPERSTRUCTURE REPLACMENT C-09-013, WASHINGTON AVENUE, CARTER STREET & COUNTY ROAD/ROUTE 1 | 6 | NGBP | $20,438,134 | $20,438,134 | $0 | $20,438,134 | ||
2025 | 612173 | Boston Region | Bellingham | BELLINGHAM- BRIDGE REPLACEMENT, B-06-022, MAPLE STREET OVER I-495 | 3 | NGBP | $14,270,687 | $14,270,687 | $0 | $14,270,687 | ||
2025 | 612178 | Boston Region | Natick | NATICK- BRIDGE REPLACEMENT, N-03-010, SPEEN STREET OVER RR MBTA/CSX | 3 | NGBP | $6,722,582 | $6,722,582 | $0 | $6,722,582 | ||
2025 | 612196 | Boston Region | Braintree | BRAINTREE- BRIDGE REPLACEMENT, B-21-067, JW MAHER HIGHWAY OVER MONATIQUOT RIVER | 6 | NGBP | $11,895,287 | $11,895,287 | $0 | $11,895,287 | ||
Bridge Off-system | $3,386,585 | $2,709,268 | $677,317 | |||||||||
2025 | 609467 | Boston Region | Multiple | HAMILTON- IPSWICH- SUPERSTRUCTURE REPLACEMENT, H-03-002=I-01-006, WINTHROP STREET OVER IPSWICH RIVER | 4 | STBG-BR-Off | $3,386,585 | $3,386,585 | $2,709,268 | $677,317 | ||
Section 2B / State Prioritized Modernization Projects | $40,141,530 | $35,425,295 | $4,716,235 | |||||||||
Intersection Improvements | $0 | $0 | $0 | |||||||||
2025 | 607342 | Boston Region | Milton | MILTON- INTERSECTION IMPROVEMENTS AT ROUTE 28 (RANDOLPH AVENUE) & CHICKATAWBUT ROAD | 6 | HSIP | $7,746,838 | $0 | $0 | $0 | ||
Roadway Reconstruction | $36,619,271 | $32,607,488 | $4,011,783 | |||||||||
2025 | 607977 | Boston Region | Multiple | HOPKINTON- WESTBOROUGH- RECONSTRUCTION OF I-90/I-495 INTERCHANGE | 3 | NHPP-I | $300,942,837 | $15,000,000 | $13,500,000 | $1,500,000 | ||
2025 | 607977 | Boston Region | Multiple | HOPKINTON- WESTBOROUGH- RECONSTRUCTION OF I-90/I-495 INTERCHANGE | 3 | NFP-I | $300,942,837 | $18,120,711 | $16,308,640 | $1,812,071 | ||
2025 | 609516 | Boston Region | Burlington | BURLINGTON- IMPROVEMENTS AT I-95 (ROUTE 128)/ROUTE 3 INTERCHANGE | 4 | NHPP | $3,498,560 | $3,498,560 | $2,798,848 | $699,712 | ||
Safe Routes to School | $3,522,259 | $2,817,807 | $704,452 | |||||||||
2025 | 609531 | Boston Region | Arlington | ARLINGTON- STRATTON SCHOOL IMPROVEMENTS (SRTS) | 4 | TAP | $1,302,209 | $1,302,209 | $1,041,767 | $260,442 | ||
2025 | 611997 | Boston Region | Newton | NEWTON- HORACE MANN ELEMENTARY SCHOOL IMPROVEMENTS (SRTS) | 6 | TAP | $861,238 | $861,237 | $688,990 | $172,247 | ||
2025 | 612001 | Boston Region | Medford | MEDFORD- MILTON FULLER ROBERTS ELEMENTARY SCHOOL (SRTS) | 4 | TAP | $1,020,484 | $1,020,484 | $816,387 | $204,097 | ||
2025 | 612100 | Boston Region | Revere | REVERE- IMPROVEMENTS AT BEACHMONT VETERANS ELEMENTARY (SRTS) | 4 | TAP | $338,329 | $338,329 | $270,663 | $67,666 | ||
Section 2C / State Prioritized Expansion Projects | $7,989,188 | $6,391,350 | $1,597,838 | |||||||||
Bicycle and Pedestrian | $7,989,188 | $6,391,350 | $1,597,838 | |||||||||
2025 | 610680 | Boston Region | Natick | NATICK- LAKE COCHITUATE PATH | 3 | CMAQ | $3,428,355 | $3,428,355 | $2,742,684 | $685,671 | ||
2025 | 611982 | Boston Region | Medford | MEDFORD- SHARED USE PATH CONNECTION AT THE ROUTE 28/WELLINGTON UNDERPASS | 4 | CMAQ | $4,560,833 | $4,560,833 | $3,648,666 | $912,167 | ||
Section 3B / Non-Federal Aid Funded | $132,338,613 | $0 | $132,338,613 | |||||||||
Bridge On-system NHS | $52,331,923 | $0 | $52,331,923 | |||||||||
2025 | 604564 | Boston Region | Maynard | MAYNARD- BRIDGE REPLACEMENT, M-10-004, ROUTE 62 (MAIN STREET) OVER THE ASSABET RIVER | 3 | NGBP | $6,036,680 | $6,036,680 | $0 | $6,036,680 | ||
2025 | 607684 | Boston Region | Braintree | BRAINTREE- BRIDGE REPLACEMENT, B-21-017, WASHINGTON STREET (ST 37) OVER MBTA/CSX RAILROAD | 6 | NGBP | $7,695,470 | $7,695,470 | $0 | $7,695,470 | ||
2025 | 612028 | Boston Region | Stoneham | STONEHAM- DECK REPLACEMENT & SUPERSTRUCTURE REPAIRS, S-27-006 (2L2), (ST 28) FELLSWAY WEST OVER I-93 | 4 | NGBP | $3,120,000 | $3,120,000 | $0 | $3,120,000 | ||
2025 | 612182 | Boston Region | Newton | NEWTON- BRIDGE REPLACEMENT, N-12-040, BOYLSTON STREET OVER GREEN LINE D | 6 | NGBP | $15,206,778 | $15,206,778 | $0 | $15,206,778 | ||
2025 | 612184 | Boston Region | Revere | REVERE- BRIDGE REPLACEMENT, R-05-015, REVERE BEACH PARKWAY OVER BROADWAY | 4 | NGBP | $20,272,995 | $20,272,995 | $0 | $20,272,995 | ||
NFA | $26,680,000 | $0 | $26,680,000 | |||||||||
2025 | 607977 | Boston Region | Multiple | HOPKINTON- WESTBOROUGH- RECONSTRUCTION OF I-90/I-495 INTERCHANGE | 3 | NFA | $300,942,837 | $26,680,000 | $0 | $26,680,000 | ||
Bridge On-system Non-NHS | $53,326,690 | $0 | $53,326,690 | |||||||||
2025 | 608952 | Boston Region | Chelsea | CHELSEA- BRIDGE SUPERSTRUCTURE REPLACMENT C-09-013, WASHINGTON AVENUE, CARTER STREET & COUNTY ROAD/ROUTE 1 | 6 | NGBP | $20,438,134 | $20,438,134 | $0 | $20,438,134 | ||
2025 | 612173 | Boston Region | Bellingham | BELLINGHAM- BRIDGE REPLACEMENT, B-06-022, MAPLE STREET OVER I-495 | 3 | NGBP | $14,270,687 | $14,270,687 | $0 | $14,270,687 | ||
2025 | 612178 | Boston Region | Natick | NATICK- BRIDGE REPLACEMENT, N-03-010, SPEEN STREET OVER RR MBTA/CSX | 3 | NGBP | $6,722,582 | $6,722,582 | $0 | $6,722,582 | ||
2025 | 612196 | Boston Region | Braintree | BRAINTREE- BRIDGE REPLACEMENT, B-21-067, JW MAHER HIGHWAY OVER MONATIQUOT RIVER | 6 | NGBP | $11,895,287 | $11,895,287 | $0 | $11,895,287 |
STIP: 2024 - 2028 (D) | ||||||||||||
Year | MassDOT Project ID | MPO | Municipality | MassDOT Project Description | District | Funding Source | Adjusted TFPC | Total Programmed Funds | Federal Funds | Non-Federal Funds | ||
Federal Fiscal Year 2026 | $505,966,124 | $394,371,383 | $111,594,741 | |||||||||
Section 1A / Regionally Prioritized Projects | $124,667,241 | $100,565,496 | $24,101,746 | |||||||||
Roadway Reconstruction | $64,435,864 | $52,098,691 | $12,337,173 | |||||||||
2026 | 605743 | Boston Region | Ipswich | IPSWICH- RESURFACING & RELATED WORK ON CENTRAL & SOUTH MAIN STREETS | 4 | STBG | $11,728,698 | $4,971,338 | $3,977,070 | $994,268 | ||
2026 | 605743 | Boston Region | Ipswich | IPSWICH- RESURFACING & RELATED WORK ON CENTRAL & SOUTH MAIN STREETS | 4 | TAP | $11,728,698 | $730,738 | $584,590 | $146,148 | ||
2026 | 606226 | Boston Region | Boston | BOSTON- RECONSTRUCTION OF RUTHERFORD AVENUE, FROM CITY SQUARE TO SULLIVAN SQUARE | 6 | NHPP | $197,759,449 | $0 | $0 | $0 | ||
2026 | 606226 | Boston Region | Boston | BOSTON- RECONSTRUCTION OF RUTHERFORD AVENUE, FROM CITY SQUARE TO SULLIVAN SQUARE | 6 | STBG | $197,759,449 | $0 | $0 | $0 | ||
2026 | 606226 | Boston Region | Boston | BOSTON- RECONSTRUCTION OF RUTHERFORD AVENUE, FROM CITY SQUARE TO SULLIVAN SQUARE | 6 | TAP | $197,759,449 | $0 | $0 | $0 | ||
2026 | 608045 | Boston Region | Milford | MILFORD- REHABILITATION ON ROUTE 16, FROM ROUTE 109 TO BEAVER STREET | 3 | HSIP | $9,758,201 | $1,500,000 | $1,350,000 | $150,000 | ||
2026 | 608045 | Boston Region | Milford | MILFORD- REHABILITATION ON ROUTE 16, FROM ROUTE 109 TO BEAVER STREET | 3 | STBG | $9,758,201 | $8,258,201 | $6,606,561 | $1,651,640 | ||
2026 | 608954 | Boston Region | Weston | WESTON- RECONSTRUCTION ON ROUTE 30 | 6 | STBG | $16,420,119 | $11,420,119 | $9,136,095 | $2,284,024 | ||
2026 | 608954 | Boston Region | Weston | WESTON- RECONSTRUCTION ON ROUTE 30 | 6 | TAP | $16,420,119 | $5,000,000 | $4,000,000 | $1,000,000 | ||
2026 | 609437 | Boston Region | Multiple | SALEM- PEABODY- BOSTON STREET IMPROVEMENTS | 4 | STBG | $14,172,868 | $14,172,868 | $11,338,294 | $2,834,574 | ||
2026 | 610662 | Boston Region | Woburn | WOBURN- ROADWAY AND INTERSECTION IMPROVEMENTS AT WOBURN COMMON, ROUTE 38 (MAIN STREET), WINN STREET, PLEASANT STREET AND MONTVALE AVENUE | 4 | HSIP | $17,382,600 | $4,000,000 | $3,600,000 | $400,000 | ||
2026 | 610662 | Boston Region | Woburn | WOBURN- ROADWAY AND INTERSECTION IMPROVEMENTS AT WOBURN COMMON, ROUTE 38 (MAIN STREET), WINN STREET, PLEASANT STREET AND MONTVALE AVENUE | 4 | STBG | $17,382,600 | $13,382,600 | $10,706,080 | $2,676,520 | ||
2026 | S12820 | Boston Region | BIKESHARE SUPPORT SET ASIDE | STBG | $6,000,000 | $1,000,000 | $800,000 | $200,000 | ||||
Intersection Improvements | $13,311,175 | $10,930,643 | $2,380,532 | |||||||||
2026 | 605857 | Boston Region | Norwood | NORWOOD- INTERSECTION IMPROVEMENTS @ ROUTE 1 & UNIVERSITY AVENUE/EVERETT STREET | 5 | CMAQ | $28,699,272 | $0 | $0 | $0 | ||
2026 | 605857 | Boston Region | Norwood | NORWOOD- INTERSECTION IMPROVEMENTS @ ROUTE 1 & UNIVERSITY AVENUE/EVERETT STREET | 5 | HSIP | $28,699,272 | $631,724 | $568,552 | $63,172 | ||
2026 | 605857 | Boston Region | Norwood | NORWOOD- INTERSECTION IMPROVEMENTS @ ROUTE 1 & UNIVERSITY AVENUE/EVERETT STREET | 5 | NHPP | $28,699,272 | $4,998,901 | $3,999,121 | $999,780 | ||
2026 | 605857 | Boston Region | Norwood | NORWOOD- INTERSECTION IMPROVEMENTS @ ROUTE 1 & UNIVERSITY AVENUE/EVERETT STREET | 5 | STBG | $28,699,272 | $5,495,247 | $4,396,198 | $1,099,049 | ||
2026 | 608940 | Boston Region | Weston | WESTON- INTERSECTION IMPROVEMENTS BOSTON POST ROAD (ROUTE 20) AT WELLESLEY STREET | 6 | HSIP | $2,185,303 | $2,185,303 | $1,966,773 | $218,530 | ||
Bicycle and Pedestrian | $21,288,202 | $17,030,562 | $4,257,640 | |||||||||
2026 | 609204 | Boston Region | Belmont | BELMONT- COMMUNITY PATH, BELMONT COMPONENT OF THE MCRT (PHASE I) | 4 | CMAQ | $21,288,202 | $7,288,202 | $5,830,562 | $1,457,640 | ||
2026 | 609204 | Boston Region | Belmont | BELMONT- COMMUNITY PATH, BELMONT COMPONENT OF THE MCRT (PHASE I) | 4 | STBG | $21,288,202 | $9,000,000 | $7,200,000 | $1,800,000 | ||
2026 | 609204 | Boston Region | Belmont | BELMONT- COMMUNITY PATH, BELMONT COMPONENT OF THE MCRT (PHASE I) | 4 | TAP | $21,288,202 | $5,000,000 | $4,000,000 | $1,000,000 | ||
Roadway Improvements | $1,400,000 | $1,120,000 | $280,000 | |||||||||
2026 | 612989 | Boston Region | Boston | BOSTON- BRIDGE PRESERVATION, B-16-066 (38D), CAMBRIDGE STREET OVER MBTA | 6 | CMAQ | $16,632,000 | $1,400,000 | $1,120,000 | $280,000 | ||
Bridge On-system NHS | $15,232,000 | $12,185,600 | $3,046,400 | |||||||||
2026 | 612989 | Boston Region | Boston | BOSTON- BRIDGE PRESERVATION, B-16-066 (38D), CAMBRIDGE STREET OVER MBTA | 6 | NHPP-PEN | $16,632,000 | $15,232,000 | $12,185,600 | $3,046,400 | ||
Flex to FTA | $6,607,977 | $5,286,382 | $1,321,595 | |||||||||
2026 | S12113 | Boston Region | TRANSIT MODERNIZATION PROGRAM | CMAQ | $26,000,000 | $6,500,000 | $5,200,000 | $1,300,000 | ||||
2026 | S12807 | Boston Region | Multiple | MWRTA CATCHCONNECT MICROTRANSIT EXPANSION PHASE 2 | 3 | CMAQ | $380,477 | $107,977 | $86,382 | $21,595 | ||
Transit Grant Program | $2,392,023 | $1,913,618 | $478,405 | |||||||||
2026 | S12124 | Boston Region | Multiple | COMMUNITY CONNECTIONS PROGRAM | CMAQ | $8,334,827 | $2,392,023 | $1,913,618 | $478,405 | |||
Section 1B / Earmark or Discretionary Grant Funded Projects | $206,088,967 | $165,499,525 | $40,589,442 | |||||||||
Earmark Discretionary | $0 | $0 | $0 | |||||||||
2026 | 607977 | Boston Region | Multiple | HOPKINTON- WESTBOROUGH- RECONSTRUCTION OF I-90/I-495 INTERCHANGE | 3 | HIP | $300,942,837 | $0 | $0 | $0 | ||
Bridge On-system Non-NHS NB | $6,947,208 | $5,557,766 | $1,389,442 | |||||||||
2026 | 612075 | Boston Region | Salem | SALEM- BRIDGE REPLACEMENT, S-01-024, JEFFERSON AVENUE OVER PARALLEL STREET | 4 | HIP-BR | $3,123,360 | $3,123,360 | $2,498,688 | $624,672 | ||
2026 | 612099 | Boston Region | ASHLAND- BRIDGE REPLACEMENT, A-14-006, CORDAVILLE ROAD OVER SUDBURY RIVER | 3 | HIP-BR | $3,823,848 | $3,823,848 | $3,059,078 | $764,770 | |||
Bridge Off-system Local NB | $3,141,758 | $3,141,758 | $0 | |||||||||
2026 | 612076 | Boston Region | Topsfield | TOPSFIELD- BRIDGE REPLACEMENT, T-06-013, PERKINS ROW OVER MILE BROOK | 4 | BROFF | $3,141,758 | $3,141,758 | $3,141,758 | $0 | ||
Bridge On-System NHS NB | $196,000,001 | $156,800,001 | $39,200,000 | |||||||||
2026 | 612496 | Boston Region | Somerville | SOMERVILLE- BRIDGE PRESERVATION, S-17-031, I-93 (NB & SB) FROM ROUTE 28 TO TEMPLE STREET (PHASE 2) | 4 | HIP-BR | $196,000,001 | $196,000,001 | $156,800,001 | $39,200,000 | ||
Section 2A / State Prioritized Reliability Projects | $72,552,107 | $61,441,667 | $11,110,441 | |||||||||
Bridge On-system NHS | $17,824,268 | $14,259,414 | $3,564,854 | |||||||||
2026 | 605321 | Boston Region | Norwood | NORWOOD- BRIDGE PRESERVATION, N-25-026, PROVIDENCE HIGHWAY (STATE ROUTE 1) OVER THE NEPONSET RIVER | 5 | NHPP | $3,460,268 | $868,000 | $694,400 | $173,600 | ||
2026 | 605321 | Boston Region | Norwood | NORWOOD- BRIDGE PRESERVATION, N-25-026, PROVIDENCE HIGHWAY (STATE ROUTE 1) OVER THE NEPONSET RIVER | 5 | NHPP-PEN | $3,460,268 | $2,592,268 | $2,073,814 | $518,454 | ||
2026 | 606449 | Boston Region | Cambridge | CAMBRIDGE- BRIDGE REPLACEMENT, C-01-008, FIRST STREET BRIDGE & C-01-040, LAND BOULEVARD/BROAD CANAL BRIDGE | 6 | NHPP | $14,364,000 | $14,364,000 | $11,491,200 | $2,872,800 | ||
Safety Improvements | $21,175,209 | $18,725,548 | $2,449,661 | |||||||||
2026 | 610675 | Boston Region | Chelsea | CHELSEA- RECONSTRUCTION OF SPRUCE STREET, FROM EVERETT AVENUE TO WILLIAMS STREET | 6 | HSIP | $5,841,153 | $5,841,153 | $5,257,038 | $584,115 | ||
2026 | 611954 | Boston Region | Boston | BOSTON- GUIDE AND TRAFFIC SIGN REPLACEMENT ON I-90/I-93 WITHIN CENTRAL ARTERY/TUNNEL SYSTEM | 6 | HSIP | $2,423,736 | $2,423,736 | $2,181,362 | $242,374 | ||
2026 | 611974 | Boston Region | Medford | MEDFORD- INTERSECTION IMPROVEMENTS AT MAIN STREET/SOUTH STREET, MAIN STREET/MYSTIC VALLEY PARKWAY RAMPS, AND MAIN STREET/MYSTIC AVENUE | 4 | HSIP | $9,177,840 | $4,588,920 | $4,130,028 | $458,892 | ||
2026 | 612599 | Boston Region | Lynn | LYNN- TARGETED SAFETY AND MULTIMODAL IMPROVEMENTS (PLAYBOOK PRIORITY CORRIDORS) | 4 | HSIP | $8,321,400 | $5,000,000 | $4,500,000 | $500,000 | ||
2026 | 612599 | Boston Region | Lynn | LYNN- TARGETED SAFETY AND MULTIMODAL IMPROVEMENTS (PLAYBOOK PRIORITY CORRIDORS) | 4 | STBG | $8,321,400 | $3,321,400 | $2,657,120 | $664,280 | ||
Non-Interstate Pavement | $17,406,630 | $13,925,304 | $3,481,326 | |||||||||
2026 | 612049 | Boston Region | Randolph | RANDOLPH- RESURFACING AND RELATED WORK ON ROUTE 24 | 6 | NHPP | $9,128,700 | $9,128,700 | $7,302,960 | $1,825,740 | ||
2026 | 612050 | Boston Region | Multiple | BRAINTREE- WEYMOUTH- RESURFACING AND RELATED WORK ON ROUTE 3 | 6 | NHPP | $8,277,930 | $8,277,930 | $6,622,344 | $1,655,586 | ||
Interstate Pavement | $16,146,000 | $14,531,400 | $1,614,600 | |||||||||
2026 | 612051 | Boston Region | Multiple | CANTON- MILTON- RANDOLPH- INTERSTATE MAINTENANCE AND RELATED WORK ON I-93 | 6 | NHPP-I | $16,146,000 | $16,146,000 | $14,531,400 | $1,614,600 | ||
Section 2B / State Prioritized Modernization Projects | $70,560,716 | $62,531,022 | $8,029,694 | |||||||||
Roadway Reconstruction | $48,088,307 | $43,279,476 | $4,808,831 | |||||||||
2026 | 607977 | Boston Region | Multiple | HOPKINTON- WESTBOROUGH- RECONSTRUCTION OF I-90/I-495 INTERCHANGE | 3 | NHPP-I | $300,942,837 | $41,613,593 | $37,452,234 | $4,161,359 | ||
2026 | 607977 | Boston Region | Multiple | HOPKINTON- WESTBOROUGH- RECONSTRUCTION OF I-90/I-495 INTERCHANGE | 3 | NFP-I | $300,942,837 | $6,474,714 | $5,827,243 | $647,471 | ||
Intersection Improvements | $12,736,182 | $11,462,564 | $1,273,618 | |||||||||
2026 | 608564 | Boston Region | Watertown | WATERTOWN- INTERSECTION IMPROVEMENTS AT ROUTE 16 AND GALEN STREET | 6 | HSIP | $3,449,261 | $3,449,261 | $3,104,335 | $344,926 | ||
2026 | 610665 | Boston Region | Stoneham | STONEHAM- INTERSECTION IMPROVEMENTS AT ROUTE 28 (MAIN STREET), NORTH BORDER ROAD AND SOUTH STREET | 4 | HSIP | $4,698,001 | $4,698,001 | $4,228,201 | $469,800 | ||
2026 | 611974 | Boston Region | Medford | MEDFORD- INTERSECTION IMPROVEMENTS AT MAIN STREET/SOUTH STREET, MAIN STREET/MYSTIC VALLEY PARKWAY RAMPS, AND MAIN STREET/MYSTIC AVENUE | 4 | HSIP | $9,177,840 | $4,588,920 | $4,130,028 | $458,892 | ||
Safe Routes to School | $9,736,227 | $7,788,982 | $1,947,245 | |||||||||
2026 | 610537 | Boston Region | Boston | BOSTON- ELLIS ELEMENTARY TRAFFIC CALMING (SRTS) | 6 | TAP | $2,737,728 | $2,737,728 | $2,190,182 | $547,546 | ||
2026 | 612804 | Boston Region | Dedham | DEDHAM- IMPROVEMENTS AT AVERY ELEMENTARY (SRTS) | 6 | TAP | $1,626,334 | $1,626,334 | $1,301,067 | $325,267 | ||
2026 | 612816 | Boston Region | Brookline | BROOKLINE- IMPROVEMENTS AT WILLIAM H. LINCOLN SCHOOL (SRTS) | 6 | TAP | $886,526 | $886,526 | $709,221 | $177,305 | ||
2026 | 612884 | Boston Region | Chelsea | CHELSEA- IMPROVEMENTS AT MARY C. BURKE ELEMENTARY (SRTS) | 6 | TAP | $1,617,667 | $1,617,667 | $1,294,134 | $323,533 | ||
2026 | 612889 | Boston Region | Sharon | SHARON- COTTAGE STREET SCHOOL IMPROVEMENTS (SRTS) | 5 | TAP | $1,497,906 | $1,497,906 | $1,198,325 | $299,581 | ||
2026 | 612894 | Boston Region | Framingham | FRAMINGHAM- IMPROVEMENTS AT HARMONY GROVE ELEMENTARY SCHOOL (SRTS) | 3 | TAP | $1,370,066 | $1,370,066 | $1,096,053 | $274,013 | ||
Section 2C / State Prioritized Expansion Projects | $5,417,093 | $4,333,674 | $1,083,419 | |||||||||
Bicycle and Pedestrian | $5,417,093 | $4,333,674 | $1,083,419 | |||||||||
2026 | 612523 | Boston Region | Revere | REVERE- STATE ROAD BEACHMONT CONNECTOR | 4 | CMAQ | $5,417,093 | $5,417,093 | $4,333,674 | $1,083,419 | ||
Section 3B / Non-Federal Aid Funded | $26,680,000 | $0 | $26,680,000 | |||||||||
NFA | $26,680,000 | $0 | $26,680,000 | |||||||||
2026 | 607977 | Boston Region | Multiple | HOPKINTON- WESTBOROUGH- RECONSTRUCTION OF I-90/I-495 INTERCHANGE | 3 | NFA | $300,942,837 | $26,680,000 | $0 | $26,680,000 |
STIP: 2024 - 2028 (D) | ||||||||||||
Year | MassDOT Project ID | MPO | Municipality | MassDOT Project Description | District | Funding Source | Adjusted TFPC | Total Programmed Funds | Federal Funds | Non-Federal Funds | ||
Federal Fiscal Year 2027 | $668,873,337 | $238,594,194 | $430,279,144 | |||||||||
Section 1A / Regionally Prioritized Projects | $144,006,044 | $116,629,527 | $27,376,517 | |||||||||
Roadway Reconstruction | $94,327,597 | $76,362,078 | $17,965,519 | |||||||||
2027 | 605743 | Boston Region | Ipswich | IPSWICH- RESURFACING & RELATED WORK ON CENTRAL & SOUTH MAIN STREETS | 4 | STBG | $11,728,698 | $6,026,622 | $4,821,298 | $1,205,324 | ||
2027 | 606226 | Boston Region | Boston | BOSTON- RECONSTRUCTION OF RUTHERFORD AVENUE, FROM CITY SQUARE TO SULLIVAN SQUARE | 6 | NHPP | $197,759,449 | $8,600,000 | $6,880,000 | $1,720,000 | ||
2027 | 606226 | Boston Region | Boston | BOSTON- RECONSTRUCTION OF RUTHERFORD AVENUE, FROM CITY SQUARE TO SULLIVAN SQUARE | 6 | STBG | $197,759,449 | $0 | $0 | $0 | ||
2027 | 606226 | Boston Region | Boston | BOSTON- RECONSTRUCTION OF RUTHERFORD AVENUE, FROM CITY SQUARE TO SULLIVAN SQUARE | 6 | TAP | $197,759,449 | $0 | $0 | $0 | ||
2027 | 607981 | Boston Region | Somerville | SOMERVILLE- MCGRATH BOULEVARD CONSTRUCTION | 4 | STBG | $98,840,000 | $20,000,000 | $16,000,000 | $4,000,000 | ||
2027 | 607981 | Boston Region | Somerville | SOMERVILLE- MCGRATH BOULEVARD CONSTRUCTION | 4 | TAP | $98,840,000 | $2,000,000 | $1,600,000 | $400,000 | ||
2027 | 609246 | Boston Region | Lynn | LYNN- REHABILITATION OF WESTERN AVENUE (ROUTE 107) | 4 | HSIP | $45,897,600 | $3,000,000 | $2,700,000 | $300,000 | ||
2027 | 609246 | Boston Region | Lynn | LYNN- REHABILITATION OF WESTERN AVENUE (ROUTE 107) | 4 | STBG | $45,897,600 | $12,000,000 | $9,600,000 | $2,400,000 | ||
2027 | 610932 | Boston Region | Brookline | BROOKLINE- REHABILITATION OF WASHINGTON STREET | 6 | HSIP | $28,995,267 | $5,000,000 | $4,500,000 | $500,000 | ||
2027 | 610932 | Boston Region | Brookline | BROOKLINE- REHABILITATION OF WASHINGTON STREET | 6 | STBG | $28,995,267 | $23,995,267 | $19,196,214 | $4,799,053 | ||
2027 | 611983 | Boston Region | Chelsea | CHELSEA- PARK STREET & PEARL STREET RECONSTRUCTION | 6 | HSIP | $11,705,708 | $1,000,000 | $900,000 | $100,000 | ||
2027 | 611983 | Boston Region | Chelsea | CHELSEA- PARK STREET & PEARL STREET RECONSTRUCTION | 6 | STBG | $11,705,708 | $10,705,708 | $8,564,566 | $2,141,142 | ||
2027 | S12820 | Boston Region | BIKESHARE SUPPORT SET ASIDE | STBG | $6,000,000 | $2,000,000 | $1,600,000 | $400,000 | ||||
Intersection Improvements | $17,573,400 | $14,058,720 | $3,514,680 | |||||||||
2027 | 605857 | Boston Region | Norwood | NORWOOD- INTERSECTION IMPROVEMENTS @ ROUTE 1 & UNIVERSITY AVENUE/EVERETT STREET | 5 | CMAQ | $28,699,272 | $3,000,000 | $2,400,000 | $600,000 | ||
2027 | 605857 | Boston Region | Norwood | NORWOOD- INTERSECTION IMPROVEMENTS @ ROUTE 1 & UNIVERSITY AVENUE/EVERETT STREET | 5 | NHPP | $28,699,272 | $3,573,400 | $2,858,720 | $714,680 | ||
2027 | 605857 | Boston Region | Norwood | NORWOOD- INTERSECTION IMPROVEMENTS @ ROUTE 1 & UNIVERSITY AVENUE/EVERETT STREET | 5 | STBG | $28,699,272 | $11,000,000 | $8,800,000 | $2,200,000 | ||
Roadway Improvements | $13,000,000 | $10,400,000 | $2,600,000 | |||||||||
2027 | 607981 | Boston Region | Somerville | SOMERVILLE- MCGRATH BOULEVARD CONSTRUCTION | 4 | NHPP | $98,840,000 | $13,000,000 | $10,400,000 | $2,600,000 | ||
Bicycle and Pedestrian | $4,858,127 | $3,886,502 | $971,625 | |||||||||
2027 | 613088 | Boston Region | Malden | MALDEN- SPOT POND BROOK GREENWAY | 4 | CMAQ | $4,858,127 | $3,000,000 | $2,400,000 | $600,000 | ||
2027 | 613088 | Boston Region | Malden | MALDEN- SPOT POND BROOK GREENWAY | 4 | TAP | $4,858,127 | $1,858,127 | $1,486,502 | $371,625 | ||
Safety Improvements | $5,246,920 | $4,722,228 | $524,692 | |||||||||
2027 | 613121 | Boston Region | Everett | EVERETT- TARGETED MULTI-MODAL AND SAFETY IMPROVEMENTS ON ROUTE 16 (DESIGN ONLY) | 4 | HSIP | $5,246,920 | $5,246,920 | $4,722,228 | $524,692 | ||
Flex to FTA | $6,500,000 | $5,200,000 | $1,300,000 | |||||||||
2027 | S12113 | Boston Region | TRANSIT MODERNIZATION PROGRAM | CMAQ | $26,000,000 | $6,500,000 | $5,200,000 | $1,300,000 | ||||
Transit Grant Program | $2,500,000 | $2,000,000 | $500,000 | |||||||||
2027 | S12124 | Boston Region | Multiple | COMMUNITY CONNECTIONS PROGRAM | CMAQ | $8,334,827 | $2,500,000 | $2,000,000 | $500,000 | |||
Section 2A / State Prioritized Reliability Projects | $241,511,844 | $41,990,597 | $199,521,247 | |||||||||
Bridge On-system Non-NHS | $138,719,952 | $0 | $138,719,952 | |||||||||
2027 | 605276 | Boston Region | Multiple | BEVERLY- SALEM- DRAWBRIDGE REPLACEMENT/REHABILITATION OF B-11-005=S-01-013, KERNWOOD AVENUE OVER DANVERS RIVER | 4 | NGBP | $92,094,352 | $92,094,352 | $0 | $92,094,352 | ||
2027 | 607420 | Boston Region | Natick | NATICK- SUPERSTRUCTURE REPLACEMENT, N-03-012, BODEN LANE OVER CSX/MBTA | 3 | NGBP | $7,985,600 | $7,985,600 | $0 | $7,985,600 | ||
2027 | 608514 | Boston Region | Beverly | BEVERLY- BRIDGE REPLACEMENT, B-11-001, BRIDGE STREET OVER BASS RIVER (HALL-WHITAKER DRAWBRIDGE) | 4 | NGBP | $38,640,000 | $38,640,000 | $0 | $38,640,000 | ||
Bridge On-system NHS | $96,351,892 | $36,194,597 | $60,157,295 | |||||||||
2027 | 606728 | Boston Region | Boston | BOSTON- BRIDGE REPLACEMENT B-16-365, STORROW DRIVE OVER BOWKER RAMPS | 6 | NHPP-PEN | $112,056,000 | $10,477,205 | $8,381,764 | $2,095,441 | ||
2027 | 611987 | Boston Region | Cambridge | CAMBRIDGE- BRIDGE REPLACEMENT, C-01-026, MEMORIAL DRIVE OVER BROOKLINE STREET | 6 | NGBP | $51,108,646 | $51,108,646 | $0 | $51,108,646 | ||
2027 | 612519 | Boston Region | Boston | BOSTON- BRIDGE REPLACEMENT, B-16-165, BLUE HILL AVENUE OVER RAILROAD | 6 | NHPP | $34,766,041 | $34,766,041 | $27,812,833 | $6,953,208 | ||
Non-Interstate Pavement | $0 | $0 | $0 | |||||||||
2027 | 609402 | Boston Region | Multiple | FRAMINGHAM- NATICK- RESURFACING AND RELATED WORK ON ROUTE 9 | 3 | NHPP | $48,665,364 | $0 | $0 | $0 | ||
Safety Improvements | $6,440,000 | $5,796,000 | $644,000 | |||||||||
2027 | 610650 | Boston Region | Boston | BOSTON- GALLIVAN BOULEVARD (ROUTE 203) SAFETY IMPROVEMENTS, FROM WASHINGTON STREET TO GRANITE AVENUE | 6 | HSIP | $6,440,000 | $6,440,000 | $5,796,000 | $644,000 | ||
2027 | 612599 | Boston Region | Lynn | LYNN- TARGETED SAFETY AND MULTIMODAL IMPROVEMENTS (PLAYBOOK PRIORITY CORRIDORS) | 4 | HSIP | $8,321,400 | $0 | $0 | $0 | ||
2027 | 612599 | Boston Region | Lynn | LYNN- TARGETED SAFETY AND MULTIMODAL IMPROVEMENTS (PLAYBOOK PRIORITY CORRIDORS) | 4 | STBG | $8,321,400 | $0 | $0 | $0 | ||
Interstate Pavement | $0 | $0 | $0 | |||||||||
2027 | 612033 | Boston Region | Lynnfield | LYNNFIELD- PEABODY- INTERSTATE MAINTENANCE AND RELATED WORK ON I-95 | 4 | NHPP-I | $8,575,451 | $0 | $0 | $0 | ||
Section 2B / State Prioritized Modernization Projects | $70,961,695 | $61,921,945 | $9,039,750 | |||||||||
Roadway Reconstruction | $63,007,343 | $54,763,028 | $8,244,315 | |||||||||
2027 | 607977 | Boston Region | Multiple | HOPKINTON- WESTBOROUGH- RECONSTRUCTION OF I-90/I-495 INTERCHANGE | 3 | NHPP-I | $300,942,837 | $17,928,463 | $16,135,617 | $1,792,846 | ||
2027 | 607977 | Boston Region | Multiple | HOPKINTON- WESTBOROUGH- RECONSTRUCTION OF I-90/I-495 INTERCHANGE | 3 | NFP-I | $300,942,837 | $25,643,072 | $23,078,765 | $2,564,307 | ||
2027 | 612615 | Boston Region | Multiple | CANTON- MILTON- ROADWAY RECONSTRUCTION ON ROUTE 138, FROM ROYALL STREET TO DOLLAR LANE | 6 | NHPP | $19,435,808 | $19,435,808 | $15,548,646 | $3,887,162 | ||
Intersection Improvements | $7,954,352 | $7,158,917 | $795,435 | |||||||||
2027 | 612613 | Boston Region | Newton | NEWTON- INTERSECTION IMPROVEMENTS AT ROUTE 16 AND QUINOBEQUIN ROAD | 6 | HSIP | $4,872,000 | $4,872,000 | $4,384,800 | $487,200 | ||
2027 | 612616 | Boston Region | Milton | MILTON- INTERSECTION IMPROVEMENTS AT ROUTE 138 AND BRADLEE ROAD | 6 | HSIP | $3,082,352 | $3,082,352 | $2,774,117 | $308,235 | ||
Section 2C / State Prioritized Expansion Projects | $22,565,156 | $18,052,125 | $4,513,031 | |||||||||
Bicycle and Pedestrian | $22,565,156 | $18,052,125 | $4,513,031 | |||||||||
2027 | 607329 | Boston Region | Multiple | WAKEFIELD- LYNNFIELD- RAIL TRAIL EXTENSION, FROM THE GALVIN MIDDLE SCHOOL TO LYNNFIELD/PEABODY T.L. | 4 | CMAQ | $24,543,047 | $10,600,000 | $8,480,000 | $2,120,000 | ||
2027 | 610660 | Boston Region | Multiple | SUDBURY- WAYLAND- MASS CENTRAL RAIL TRAIL (MCRT) | 3 | CMAQ | $4,061,413 | $4,061,413 | $3,249,130 | $812,283 | ||
2027 | 612499 | Boston Region | Medford | MEDFORD- SOUTH MEDFORD CONNECTOR BIKE PATH | 4 | CMAQ | $7,903,743 | $7,903,743 | $6,322,994 | $1,580,749 | ||
Section 3B / Non-Federal Aid Funded | $189,828,598 | $0 | $189,828,598 | |||||||||
Bridge On-system Non-NHS | $138,719,952 | $0 | $138,719,952 | |||||||||
2027 | 605276 | Boston Region | Multiple | BEVERLY- SALEM- DRAWBRIDGE REPLACEMENT/REHABILITATION OF B-11-005=S-01-013, KERNWOOD AVENUE OVER DANVERS RIVER | 4 | NGBP | $92,094,352 | $92,094,352 | $0 | $92,094,352 | ||
2027 | 607420 | Boston Region | Natick | NATICK- SUPERSTRUCTURE REPLACEMENT, N-03-012, BODEN LANE OVER CSX/MBTA | 3 | NGBP | $7,985,600 | $7,985,600 | $0 | $7,985,600 | ||
2027 | 608514 | Boston Region | Beverly | BEVERLY- BRIDGE REPLACEMENT, B-11-001, BRIDGE STREET OVER BASS RIVER (HALL-WHITAKER DRAWBRIDGE) | 4 | NGBP | $38,640,000 | $38,640,000 | $0 | $38,640,000 | ||
Bridge On-system NHS | $51,108,646 | $0 | $51,108,646 | |||||||||
2027 | 611987 | Boston Region | Cambridge | CAMBRIDGE- BRIDGE REPLACEMENT, C-01-026, MEMORIAL DRIVE OVER BROOKLINE STREET | 6 | NGBP | $51,108,646 | $51,108,646 | $0 | $51,108,646 |
STIP: 2024 - 2028 (D) | ||||||||||||
Year | MassDOT Project ID | MPO | Municipality | MassDOT Project Description | District | Funding Source | Adjusted TFPC | Total Programmed Funds | Federal Funds | Non-Federal Funds | ||
Federal Fiscal Year 2028 | $500,800,259 | $403,559,552 | $97,240,707 | |||||||||
Section 1A / Regionally Prioritized Projects | $149,868,526 | $120,394,821 | $29,473,705 | |||||||||
Roadway Reconstruction | $124,176,075 | $99,840,860 | $24,335,215 | |||||||||
2028 | 606226 | Boston Region | Boston | BOSTON- RECONSTRUCTION OF RUTHERFORD AVENUE, FROM CITY SQUARE TO SULLIVAN SQUARE | 6 | NHPP | $197,759,449 | $12,000,000 | $9,600,000 | $2,400,000 | ||
2028 | 606226 | Boston Region | Boston | BOSTON- RECONSTRUCTION OF RUTHERFORD AVENUE, FROM CITY SQUARE TO SULLIVAN SQUARE | 6 | STBG | $197,759,449 | $19,500,000 | $15,600,000 | $3,900,000 | ||
2028 | 606226 | Boston Region | Boston | BOSTON- RECONSTRUCTION OF RUTHERFORD AVENUE, FROM CITY SQUARE TO SULLIVAN SQUARE | 6 | TAP | $197,759,449 | $2,000,000 | $1,600,000 | $400,000 | ||
2028 | 607981 | Boston Region | Somerville | SOMERVILLE- MCGRATH BOULEVARD CONSTRUCTION | 4 | STBG | $98,840,000 | $30,000,000 | $24,000,000 | $6,000,000 | ||
2028 | 609246 | Boston Region | Lynn | LYNN- REHABILITATION OF WESTERN AVENUE (ROUTE 107) | 4 | HSIP | $45,897,600 | $5,000,000 | $4,500,000 | $500,000 | ||
2028 | 609246 | Boston Region | Lynn | LYNN- REHABILITATION OF WESTERN AVENUE (ROUTE 107) | 4 | STBG | $45,897,600 | $15,000,000 | $12,000,000 | $3,000,000 | ||
2028 | S12820 | Boston Region | BIKESHARE SUPPORT SET ASIDE | STBG | $6,000,000 | $2,000,000 | $1,600,000 | $400,000 | ||||
2028 | S12826 | Boston Region | Multiple | WESTWOOD- NORWOOD- RECONSTRUCTION OF CANTON STREET TO UNIVERSITY DRIVE, INCLUDING REHAB OF N-25-032=W-31-018 | 6 | CMAQ | $22,094,875 | $4,000,000 | $3,200,000 | $800,000 | ||
2028 | S12826 | Boston Region | Multiple | WESTWOOD- NORWOOD- RECONSTRUCTION OF CANTON STREET TO UNIVERSITY DRIVE, INCLUDING REHAB OF N-25-032=W-31-018 | 6 | STBG | $22,094,875 | $18,094,875 | $14,475,900 | $3,618,975 | ||
2028 | S12827 | Boston Region | Wakefield | WAKEFIELD - MAIN STREET CORRIDOR IMPROVEMENT PROJECT | 4 | CMAQ | $16,581,200 | $8,000,000 | $6,400,000 | $1,600,000 | ||
2028 | S12827 | Boston Region | Wakefield | WAKEFIELD - MAIN STREET CORRIDOR IMPROVEMENT PROJECT | 4 | STBG | $16,581,200 | $7,081,200 | $5,664,960 | $1,416,240 | ||
2028 | S12827 | Boston Region | Wakefield | WAKEFIELD - MAIN STREET CORRIDOR IMPROVEMENT PROJECT | 4 | TAP | $16,581,200 | $1,500,000 | $1,200,000 | $300,000 | ||
Bicycle and Pedestrian | $16,692,451 | $13,353,961 | $3,338,490 | |||||||||
2028 | 610666 | Boston Region | Swampscott | SWAMPSCOTT- RAIL TRAIL CONSTRUCTION | 4 | CMAQ | $8,932,000 | $7,300,000 | $5,840,000 | $1,460,000 | ||
2028 | 610666 | Boston Region | Swampscott | SWAMPSCOTT- RAIL TRAIL CONSTRUCTION | 4 | TAP | $8,932,000 | $1,632,000 | $1,305,600 | $326,400 | ||
2028 | 610691 | Boston Region | Natick | NATICK- COCHITUATE RAIL TRAIL EXTENSION, FROM MBTA STATION TO MECHANIC STREET | 3 | STBG | $7,760,451 | $7,760,451 | $6,208,361 | $1,552,090 | ||
Flex to FTA | $6,500,000 | $5,200,000 | $1,300,000 | |||||||||
2028 | S12113 | Boston Region | TRANSIT MODERNIZATION PROGRAM | CMAQ | $26,000,000 | $6,500,000 | $5,200,000 | $1,300,000 | ||||
Transit Grant Program | $2,500,000 | $2,000,000 | $500,000 | |||||||||
2028 | S12124 | Boston Region | Multiple | COMMUNITY CONNECTIONS PROGRAM | CMAQ | $8,334,827 | $2,500,000 | $2,000,000 | $500,000 | |||
Section 1B / Earmark or Discretionary Grant Funded Projects | $64,960,000 | $51,968,000 | $12,992,000 | |||||||||
Bridge On-system Non-NHS NB | $64,960,000 | $51,968,000 | $12,992,000 | |||||||||
2028 | 608397 | Boston Region | Gloucester | GLOUCESTER- BRIDGE RECONSTRUCTION, G-05-002, WESTERN AVENUE OVER BLYNMAN CANAL | 4 | HIP-BR | $64,960,000 | $64,960,000 | $51,968,000 | $12,992,000 | ||
Section 2A / State Prioritized Reliability Projects | $234,431,079 | $189,640,644 | $44,790,435 | |||||||||
Bridge On-system NHS | $152,275,425 | $121,820,340 | $30,455,085 | |||||||||
2028 | 606728 | Boston Region | Boston | BOSTON- BRIDGE REPLACEMENT B-16-365, STORROW DRIVE OVER BOWKER RAMPS | 6 | NHPP-PEN | $112,056,000 | $40,075,975 | $32,060,780 | $8,015,195 | ||
2028 | 608396 | Boston Region | Multiple | LYNN- REVERE- BRIDGE RECONSTRUCTION, L-18-015=R-05-008, ROUTE 1A OVER SAUGUS RIVER | 4 | NHPP | $105,560,000 | $54,185,724 | $43,348,579 | $10,837,145 | ||
2028 | 613124 | Boston Region | Boston | BOSTON- DECK/SUPERSTRUCTURE REPLACEMENT, B-16-054 (4T2), BEACON STREET OVER I-90 (STRUCTURE 50, MILE 132.2) | 6 | NHPP | $42,295,604 | $24,642,463 | $19,713,970 | $4,928,493 | ||
2028 | 613124 | Boston Region | Boston | BOSTON- DECK/SUPERSTRUCTURE REPLACEMENT, B-16-054 (4T2), BEACON STREET OVER I-90 (STRUCTURE 50, MILE 132.2) | 6 | NHPP-PEN | $42,295,604 | $17,653,141 | $14,122,513 | $3,530,628 | ||
2028 | 613125 | Boston Region | Boston | BOSTON- DECK/SUPERSTRUCTURE REPLACEMENT OF BRIDGE B-16-051(4T5), MASS AVENUE OVER I-90 & MBTA (STRUCTURE 54, MILE 132.84) | 6 | NHPP-PEN | $15,718,122 | $15,718,122 | $12,574,498 | $3,143,624 | ||
Safety Improvements | $16,183,809 | $13,312,180 | $2,871,629 | |||||||||
2028 | 607748 | Boston Region | Acton | ACTON- INTERSECTION & SIGNAL IMPROVEMENTS ON SR 2 & SR 111 (MASSACHUSETTS AVENUE) AT PIPER ROAD & TAYLOR ROAD | 3 | HSIP | $4,382,329 | $3,651,329 | $3,286,196 | $365,133 | ||
2028 | 611969 | Boston Region | Everett | EVERETT- INTERSECTION IMPROVEMENTS ON ROUTE 16 | 4 | NHPP | $17,748,000 | $12,532,480 | $10,025,984 | $2,506,496 | ||
Non-Interstate Pavement | $48,665,364 | $38,932,291 | $9,733,073 | |||||||||
2028 | 609402 | Boston Region | Multiple | FRAMINGHAM- NATICK- RESURFACING AND RELATED WORK ON ROUTE 9 | 3 | NHPP | $48,665,364 | $48,665,364 | $38,932,291 | $9,733,073 | ||
Interstate Pavement | $17,306,481 | $15,575,833 | $1,730,648 | |||||||||
2028 | 612033 | Boston Region | Lynnfield | LYNNFIELD- PEABODY- INTERSTATE MAINTENANCE AND RELATED WORK ON I-95 | 4 | NHPP-I | $8,575,451 | $8,575,451 | $7,717,906 | $857,545 | ||
2028 | 612094 | Boston Region | Multiple | CANTON- DEDHAM- WESTWOOD- INTERSTATE MAINTENANCE AND RELATED WORK ON I-95 | 6 | NHPP-I | $8,731,030 | $8,731,030 | $7,857,927 | $873,103 | ||
Section 2B / State Prioritized Modernization Projects | $34,191,557 | $27,676,809 | $6,514,748 | |||||||||
Intersection Improvements | $2,458,573 | $2,212,716 | $245,857 | |||||||||
2028 | 607748 | Boston Region | Acton | ACTON- INTERSECTION & SIGNAL IMPROVEMENTS ON SR 2 & SR 111 (MASSACHUSETTS AVENUE) AT PIPER ROAD & TAYLOR ROAD | 3 | HSIP | $4,382,329 | $731,000 | $657,900 | $73,100 | ||
2028 | 608052 | Boston Region | Norwood | NORWOOD- INTERSECTION & SIGNAL IMPROVEMENTS AT US 1 (PROVIDENCE HIGHWAY) & MORSE STREET | 5 | HSIP | $1,727,573 | $1,727,573 | $1,554,816 | $172,757 | ||
Roadway Reconstruction | $31,732,984 | $25,464,094 | $6,268,890 | |||||||||
2028 | 607977 | Boston Region | Multiple | HOPKINTON- WESTBOROUGH- RECONSTRUCTION OF I-90/I-495 INTERCHANGE | 3 | NHPP-I | $300,942,837 | $777,064 | $699,358 | $77,706 | ||
2028 | 609527 | Boston Region | Reading | READING- IMPROVEMENTS ON I-95 | 4 | NHPP | $17,376,800 | $17,376,800 | $13,901,440 | $3,475,360 | ||
2028 | 610543 | Boston Region | Multiple | REVERE- MALDEN- IMPROVEMENTS AT ROUTE 1 (NB) (PHASE 1) | 4 | NHPP | $8,363,600 | $8,363,600 | $6,690,880 | $1,672,720 | ||
2028 | 611969 | Boston Region | Everett | EVERETT- INTERSECTION IMPROVEMENTS ON ROUTE 16 | 4 | NHPP | $17,748,000 | $5,215,520 | $4,172,416 | $1,043,104 | ||
Section 2C / State Prioritized Expansion Projects | $17,349,097 | $13,879,278 | $3,469,819 | |||||||||
Bicycle and Pedestrian | $17,349,097 | $13,879,278 | $3,469,819 | |||||||||
2028 | 607329 | Boston Region | Multiple | WAKEFIELD- LYNNFIELD- RAIL TRAIL EXTENSION, FROM THE GALVIN MIDDLE SCHOOL TO LYNNFIELD/PEABODY T.L. | 4 | CMAQ | $24,543,047 | $13,943,047 | $11,154,438 | $2,788,609 | ||
2028 | 612607 | Boston Region | Danvers | DANVERS- RAIL TRAIL WEST EXTENSION (PHASE 3) | 4 | CMAQ | $3,406,050 | $3,406,050 | $2,724,840 | $681,210 |