FFYs 2024-2028  Transportation Improvement Program Final Scenario (Performance Measures - Amended)

 

Proponent(s) TIP ID Project Name MassDOT District Investment Category MAPC
Subregion
Evaluation Score Programmed Year(s) Current
 FFY 2024
Proposed
 FFY 2024
Current
FFY 2025
Proposed
 FFY 2025
Current
FFY 2026
Proposed  FFY 2026 Current
FFY 2027
Proposed
FFY 2027
Proposed
FFY 2028
Other Non-Target Funds Current Program Cost
 (FFYs 2023-28)
Cost Change Proposed Total Cost (all FYs)
Boston 606453 BOSTON- IMPROVEMENTS ON BOYLSTON STREET, FROM INTERSECTION OF BROOKLINE AVENUE & PARK DRIVE TO IPSWICH STREET 6 CS ICC 60 2023 $8,665,052 $0 $0 $8,665,052 $0   $0     $0 $8,665,052 $0 $8,665,052
Littleton 609054 LITTLETON- RECONSTRUCTION OF FOSTER STREET 3 CS MAGIC 38 2024 $3,992,645 $5,164,375 $0   $0   $0     $0 $3,992,645 ($1,171,730) $5,164,375
Ashland 608436 ASHLAND- REHABILITATION AND RAIL CROSSING IMPROVEMENTS ON CHERRY STREET 3 CS MWRC 38 2024 $1,222,315 $0 $0 $1,222,315 $0   $0     $0 $1,222,315 ($0) $1,222,315
Ipswich 605743 IPSWICH- RESURFACING & RELATED WORK ON CENTRAL & SOUTH MAIN STREETS 4 CS NSTF 48 2024 $5,490,888 $0 $0 $0 $0 $5,702,076 $0     $0 $5,490,888 ($211,188) $5,702,076
Peabody 609211 PEABODY- INDEPENDENCE GREENWAY EXTENSION 4 BP NSTF 34 2024 $3,922,122 $7,524,204 $0 $0 $0   $0     $0 $3,922,122 ($3,602,082) $7,524,204
Lynn 609252 LYNN- REHABILITATION OF ESSEX STREET 4 CS ICC 66 2024 $17,602,000 $0 $0 $19,698,640 $0   $0     $0 $17,602,000 ($2,096,640) $19,698,640
MassDOT 608007 COHASSET- SCITUATE- CORRIDOR IMPROVEMENTS AND RELATED WORK ON JUSTICE CUSHING HIGHWAY (ROUTE 3A), FROM BEECHWOOD STREET TO HENRY TURNER BAILEY ROAD 5 CS SSC 37 2024 $12,509,786 $15,496,957 $0   $0   $0     $0 $12,509,786 ($2,987,171) $15,496,957
MassDOT 603739 WRENTHAM- CONSTRUCTION OF ROUTE I-495/ROUTE 1A RAMPS 5 MI SWAP 55 2024 $15,587,884 $20,117,638 $0   $0   $0     $0 $15,587,884 ($4,529,754) $20,117,638
MassDOT 110980 NEWTON- WESTON- BRIDGE REHABILITATION, N-12-010=W-29-005, COMMONWEALTH AVENUE (ROUTE 30) OVER THE CHARLES RIVER 6 CS ICC N/A 2024 $22,725,820 $21,851,750 $0   $0   $0     $0 $22,725,820 $874,070 $21,851,750
MassDOT 608067 WOBURN- INTERSECTION RECONSTRUCTION AT ROUTE 3 (CAMBRIDGE ROAD) & BEDFORD ROAD AND SOUTH BEDFORD STREET 4 II NSPC 52 2025 $0   $1,555,200 $1,978,080 $0   $0     $0 $1,555,200 ($422,880) $1,978,080
Peabody 610544 PEABODY- MULTI-USE PATH CONSTRUCTION OF INDEPENDENCE GREENWAY AT I-95 AND ROUTE 1 4 BP NSTF 53 2025 $0   $6,334,200 $15,777,132 $0   $0     $0 $6,334,200 ($9,442,932) $15,777,132
Woburn 610662 WOBURN- ROADWAY AND INTERSECTION IMPROVEMENTS AT WOBURN COMMON, ROUTE 38 (MAIN STREET), WINN STREET, PLEASANT STREET AND MONTVALE AVENUE 4 CS NSPC 75 2025 $0   $15,530,400 $0 $0 $17,382,600 $0     $0 $15,530,400 ($1,852,200) $17,382,600
Everett 609257 EVERETT- RECONSTRUCTION OF BEACHAM STREET 4 CS ICC 54 2025 $0   $10,168,416 $10,548,928 $0   $0     $0 $10,168,416 ($380,512) $10,548,928
Hingham 605168 HINGHAM- IMPROVEMENTS ON ROUTE 3A FROM OTIS STREET/COLE ROAD  INCLUDING SUMMER STREET AND ROTARY; ROCKLAND STREET TO GEORGE WASHINGTON BOULEVARD.   5 CS SSC 57 2025 $0   $15,596,550 $15,018,900 $0   $0     $0 $15,596,550 $577,650 $15,018,900
MassDOT 608045 MILFORD- REHABILITATION ON ROUTE 16, FROM ROUTE 109 TO BEAVER STREET 3 CS SWAP 50 2026 $0   $0   $10,119,616 $9,758,201 $0     $0 $10,119,616 $361,415 $9,758,201
Belmont 609204 BELMONT- COMMUNITY PATH, BELMONT COMPONENT OF THE MCRT (PHASE I) 4 BP ICC 64.6 2026 $0   $0   $21,034,382 $21,288,202 $0     $0 $21,034,382 ($253,820) $21,288,202
Salem 609437 SALEM- PEABODY- BOSTON STREET IMPROVEMENTS 4 CS NSTF 67.8 2026 $0   $0   $13,977,600 $14,172,868 $0     $0 $13,977,600 ($195,268) $14,172,868
Weston 608940 WESTON- INTERSECTION IMPROVEMENTS BOSTON POST ROAD (ROUTE 20) AT WELLESLEY STREET  6 II MWRC 50.6 2026 $0   $0   $2,681,330 $2,185,303 $0     $0 $2,681,330 $496,027 $2,185,303
Weston 608954 WESTON- RECONSTRUCTION ON ROUTE 30 6 CS MWRC 49.2 2026 $0   $0   $17,028,272 $16,420,119 $0     $0 $17,028,272 $608,153 $16,420,119
Swampscott 610666 SWAMPSCOTT- RAIL TRAIL CONSTRUCTION 4 BP NSTF 66.4 2027 $0   $0   $0   $8,932,000 $0 $8,932,000 $0 $8,932,000 $0 $8,932,000
MassDOT 607981 SOMERVILLE- MCGRATH BOULEVARD CONSTRUCTION 4 MI ICC 72.2 2027-28 $0   $0   $0   $20,000,000 $35,000,000 $30,000,000 $0 $20,000,000 ($45,000,000) $65,000,000
Lynn 609246 LYNN- REHABILITATION OF WESTERN AVENUE (ROUTE 107) 4 CS ICC 74.9 2027-28 $0   $0   $0   $15,000,000 $15,000,000 $20,000,000 $0 $15,000,000 ($20,000,000) $35,000,000
Brookline 610932 BROOKLINE- REHABILITATION OF WASHINGTON STREET 6 CS ICC 62.4 2027 $0   $0   $0   $30,030,812 $28,995,267   $0 $30,030,812 $1,035,545 $28,995,267
Chelsea 611983 CHELSEA- PARK STREET & PEARL STREET RECONSTRUCTION 6 CS ICC 69.9 2027 $0   $0   $0   $12,123,769 $11,705,708   $0 $12,123,769 $418,061 $11,705,708
Newton S12125 NEWTON MICROTRANSIT SERVICE 4 CC ICC 53 2021-2023 $0   $0   $0   $0     $0 $152,000 $0 $152,000
MWRTA S12701 MWRTA CATCHCONNECT MICROTRANSIT SERVICE EXPANSION 3 CC MWRC 59 2023-2025 $149,425 $149,425 $159,488 $159,488 $0   $0     $0 $450,163 $0 $450,163
MART S12703 MONTACHUSETT RTA MICROTRANSIT SERVICE 3 CC MAGIC 57 2023-2025 $430,354 $430,354 $406,641 $406,641 $0   $0     $0 $1,316,061 $0 $1,316,061
Stoneham S12699 STONEHAM SHUTTLE SERVICE 4 CC NSPC 72 2023-2025 $261,439 $261,439 $205,189 $205,189 $0   $0     $0 $796,817 $0 $796,817
CATA S12700 CATA ON DEMAND MICROTRANSIT SERVICE EXPANSION 4 CC NSTF 61.75 2023-2025 $265,065 $265,065 $214,776 $214,776 $0   $0     $0 $813,291 $0 $813,291
Newton S12694 NEWMO MICROTRANSIT SERVICE EXPANSION 6 CC ICC 87 2023-2025 $268,246 $268,246 $209,663 $209,663 $0   $0     $0 $890,574 $0 $890,574
Watertown S12697 PLEASANT STREET SHUTTLE SERVICE EXPANSION 6 CC ICC 78 2023-2025 $335,434 $335,434 $228,939 $228,939 $0   $0     $0 $1,002,198 $0 $1,002,198
Watertown 607777 WATERTOWN- REHABILITATION OF MOUNT AUBURN STREET (ROUTE 16) 6 CS ICC 75 2023-24 $2,841,078 $3,494,249 $0 $0 $0   $0     $0 $27,246,174 ($653,171) $27,899,345
Canton S12114 ROYALL STREET SHUTTLE 6 CC TRIC 51 2023-24 $148,542 $148,542 $0 $0 $0   $0     $0 $325,719 $0 $325,719
Boston 606226 BOSTON- RECONSTRUCTION OF RUTHERFORD AVENUE, FROM CITY SQUARE TO SULLIVAN SQUARE 6 MI ICC 59 2027-28 $0 $0 $32,783,959 $0 $33,500,000 $0 $33,500,000 $8,600,000 $33,500,000 $0 $99,783,959 $57,683,959 $42,100,000
MassDOT 608051 WILMINGTON- RECONSTRUCTION ON ROUTE 38 (MAIN STREET), FROM ROUTE 62 TO THE WOBURN C.L. 4 CS NSPC 59 2025-26 $0 $0 $24,644,177 $23,731,429 $0 $0 $0 $0   $0 $24,644,177 $912,748 $23,731,429
Norwood 605857 NORWOOD- INTERSECTION IMPROVEMENTS @ ROUTE 1 & UNIVERSITY AVENUE/EVERETT STREET  5 II TRIC 55 2026 $0 $0 $9,000,000 $0 $15,837,870 $11,125,872 $0 $17,573,400   $0 $24,837,870 ($3,861,402) $28,699,272
Regionwide S12113 TRANSIT MODERNIZATION PROGRAM Regionwide TM Regionwide N/A 2025-2028 $0 $0 $6,500,000 $6,500,000 $6,500,000 $6,500,000 $6,500,000 $6,500,000 $6,500,000 $0 $19,500,000 ($6,500,000) $26,000,000
Regionwide S12124 COMMUNITY CONNECTIONS PROGRAM Regionwide CC Regionwide N/A 2025-28 $641,495 $0 $1,075,304 $942,804 $2,500,000 $2,392,023 $2,500,000 $2,500,000 $2,500,000 $0 $6,716,799 ($1,618,028) $8,334,827
MWRTA S12807 CATCHCONNECT MICTROTRANSIT EXPANSION PHASE 2 Regionwide CC MWRC 90 2024-27 $0 $140,000 $0 $132,500 $0 $107,977 $0     $0 $0 ($380,477) $380,477
Lynn S12802 BROAD STREET CORRIDOR TSP 4 CC ICC 88 2024 $0 $297,800 $0   $0   $0     $0 $0 ($297,800) $297,800
Medford S12803 MEDFORD BICYCLE PARKING (TIER 1) 4 CC ICC 84 2024 $0 $29,600 $0   $0   $0     $0 $0 ($29,600) $29,600
Medford S12804 MEDFORD BLUEBIKES EXPANSION 4 CC ICC 78 2024 $0 $118,643 $0   $0   $0     $0 $0 ($118,643) $118,643
Canton S12806 CANTON CENTER BICYCLE RACKS 6 CC TRIC 72 2024 $0 $10,000 $0   $0   $0     $0 $0 ($10,000) $10,000
Canton S12805 CANTON PUBLIC SCHOOLS BIKE PROGRAM 6 CC TRIC 38 2024 $0 $22,500 $0   $0   $0     $0 $0 ($22,500) $22,500
Boston S12823 BOSTON ELECTRIC BLUEBIKES ADOPTION 6 CC ICC 84 2024 $0 $1,020,000 $0   $0   $0     $0 $0 ($1,020,000) $1,020,000
Cambridge S12824 CAMBRIDGE ELECTRIC BLUEBIKES ADOPTION 6 CC ICC 81 2024 $0 $352,575 $0   $0   $0     $0 $0 ($352,575) $352,575
MBTA S12705 LYNN STATION IMPROVEMENTS PHASE II 4 TM ICC N/A 2023-2024 $13,600,000 $13,600,000 $0   $0   $0     $0 $48,100,000 $0 $48,100,000
Natick 610691 COCHITUATE RAIL TRAIL EXTENSION (MBTA STATION TO MECHANIC STREET) - NATICK CENTER CONNECTION 3 BP MWRC 67 2028 $0 $0 $0   $0   $0   $7,760,451 $0 $0 ($7,760,451) $7,760,451
Westwood 608158 WESTWOOD- NORWOOD- RECONSTRUCTION OF CANTON STREET TO UNIVERSITY DRIVE, INCLUDING REHAB OF N-25-032=W-31-018 6 CS TRIC 53.3 2028 $0 $0 $0   $0   $0   $22,094,875 $0 $0 ($22,094,875) $22,094,875
Wakefield 613145 WAKEFIELD- COMPREHENSIVE DOWNTOWN TRANSPORTATION IMPROVEMENT PROJECT 4 CS NSPC 61.8 2028 $0 $0 $0   $0   $0   $16,581,200 $0 $0 ($16,581,200) $16,581,200
Malden 613088 MALDEN- SPOT POND BROOK GREENWAY 4 BP ICC 73 2027 $0 $0 $0   $0   $0 $4,858,127 $0 $0 $0 ($4,858,127) $4,858,127
Boston 612989 BOSTON- BRIDGE PRESERVATION, B-16-066 (38D), CAMBRIDGE STREET OVER MBTA 6 CS ICC 53.1 2026 $0 $0 $0   $0 $16,632,000 $0   $0 $0 $0 ($16,632,000) $16,632,000
Acton S12818 ACTON PARKING MANAGEMENT SYSTEM 3 CC MAGIC 29 2024 $0 $15,000 $0   $0   $0   $0 $0 $0 ($15,000) $15,000
MassDOT 613121 EVERETT- TARGETED MULTI-MODAL AND SAFETY IMPROVEMENTS ON ROUTE 16 4 II ICC N/A 2027 $0   $0   $0   $0 $5,246,920 $0 $0 $0 ($5,246,920) $5,246,920
MassDOT 609532 CHELSEA- TARGETED SAFETY IMPROVEMENTS AND RELATED WORK ON BROADWAY, FROM WILLIAMS STREET TO CITY HALL AVENUE 4 II ICC N/A 2025 $0   $0 $6,315,013 $0   $0   $0 $6,557,898 $6,557,898 ($6,315,013) $12,872,911
MassDOT 606728 BOSTON- BRIDGE REPLACEMENT B-16-365-STORROW DRIVE OVER BOWKER RAMPS 4 MI ICC N/A 2027 $0 $0 $0 $0 $0 $0 $0 $15,000,000 $0 $116,058,000 $116,058,000 ($15,000,000) $131,058,000
MBTA S12819 JACKSON SQUARE STATION ACCESSIBILITY IMPROVEMENTS N/A TM ICC N/A 2024-25 $0 $11,000,000 $0 $10,000,000 $0   $0   $0 $0 $0 ($21,000,000) $21,000,000
MBTA S12821 RAIL TRANSFORMATION - EARLY ACTION ITEMS - READING STATION AND WILBUR INTERLOCKING N/A TM NSPC N/A 2024 $0 $11,200,000 $0 $0 $0   $0   $0 $0 $0 ($11,200,000) $11,200,000
MBTA S12822 COLUMBUS AVE BUS LANE PHASE II N/A TM ICC N/A 2024 $0 $9,400,000 $0   $0   $0   $0 $0 $0 ($9,400,000) $9,400,000
CTPS S12820 BIKESHARE STATE OF GOOD REPAIR SET-ASIDE Regionwide CC Regionwide N/A 2025-2028 $0 $0 $0 $1,000,000 $0 $1,000,000 $0 $2,000,000 $2,000,000 $0 $0 ($6,000,000) $6,000,000
CTPS S12825 PROJECT DESIGN SUPPORT PILOT Regionwide CS Regionwide N/A 2025 $0 $0 $0 $4,000,000 $0 $0 $0   $0 $0 $0 ($4,000,000) $4,000,000

 

Projects in red text were identified as being high risk for not meeting their advertisement date at February 2023 TIP readiness meeting.

*Projects with an asterisk were identified as candidates to remain in current year if near-term issue resolution occurs.

Indicates an increase in project cost (> $500,000 or 20% of project cost)
Indicates a project was recommended to move out to a later TIP year
Indicates a project was recommended to move into an earlier TIP year
Indicates a project is proposed to be newly added to the TIP
Indicates a project that is proposed to be newly added to the TIP and for which a project application was received by the MPO.

 

Abbereviations:

TIP Investment programs: BP = Bicycle and Pedestrian. CC = Community Connections. CS = Complete Streets. II = Intersection Improvements. MI = Major Infrastructure.
TM = Transit Modernization

Metropolitan Area Planning Council (MAPC) subregions: ICC = Inner Core Committee. MAGIC = Minuteman Advisory Group on Interlocal Coordination. MWRC = MetroWest Regional Collaborative. NSPC = North Suburban Planning Council. NSTF = North Shore Task Force. SSC = South Shore Coalition. SWAP = SouthWest Advisory Planning Committee. TRIC = Three Rivers Interlocal Council.

Other abbreviations: MassDOT = Massachusetts Department of Transportation. DPH = design public hearing. FFY = federal fiscal year. N/A = not applicable. PRC = MassDOT's Project Review Committee. PS&E = Plans, Specifications, and EStimates. R1 = resubmission. TRD = TIP Readiness Days. NewMo = Newton in Motion. MassDOT = Massachusetts Department of Transportation.

 

 

 

  2024 2025 2026 2027 2028 2024-28 Total
Total Available Regional Highway Target Funds (2024-28 TIP): $130,647,095 $128,427,689 $125,285,687 $155,132,142 $158,052,175 $697,544,788
  Current Proposed Current Proposed Current Proposed Current Proposed Proposed Proposed
Draft Total Programmed Regional Highway Target Funds: $117,059,590 $122,713,795 $124,612,902 $126,955,489 $123,179,070 $124,667,241 $128,586,581 $152,979,422 $149,868,526 $677,184,474
Regional Highway Target Funds Remaining (Unprogrammed): $13,587,505 $7,933,300 $3,814,787 $1,472,200 $2,106,617 $618,446 $26,545,561 $2,152,720 $8,183,649 $20,360,315
Percent Unprogrammed 10.4% 6.1% 3.0% 1.1% 1.7% 0.5% 17.1% 1.4% 5.2% 2.9%