Baseline Scenario

Proponent(s) TIP ID Project Name MassDOT District MAPC
Subregion
Evaluation Score Programmed Year(s) Project Status Current
 FFY 2023
Proposed
 FFY 2023
Current
 FFY 2024
Proposed
 FFY 2024
Current
FFY 2025
Proposed
 FFY 2025
Current
FFY 2026
Proposed  FFY 2026 Current
FFY 2027
Proposed
FFY 2027
Proposed
FFY 2028
Other Non-Target Funds Current Program Cost (FFY23-28) Cost Change Proposed Total Cost (all FYs)
MassDOT 608007 COHASSET- SCITUATE- CORRIDOR IMPROVEMENTS AND RELATED WORK ON JUSTICE CUSHING HIGHWAY (ROUTE 3A), FROM BEECHWOOD STREET TO HENRY TURNER BAILEY ROAD 5 SSC 37 2024 100% Design Complete (9/22/2022) $0   $12,509,786   $0   $0   $0     $0 $12,509,786 $12,509,786 $0
Wilmington 609253 WILMINGTON- INTERSECTION IMPROVEMENTS AT LOWELL STREET (ROUTE 129) AND WOBURN STREET 4 NSPC 53 2023 100% Package Comments to DE (9/9/2022) $6,441,358   $0   $0   $0   $0     $0 $6,441,358 $6,441,358 $0
Norwood 606130 NORWOOD- INTERSECTION IMPROVEMENTS AT ROUTE 1A & UPLAND ROAD/WASHINGTON STREET & PROSPECT STREET/FULTON STREET 5 TRIC 47 2023 100% Package Comments to DE (as of 7/06/2022) $7,952,280   $0   $0   $0   $0     $0 $7,952,280 $7,952,280 $0
Dedham 607899 DEDHAM- PEDESTRIAN IMPROVEMENTS ALONG BUSSEY STREET, INCLUDING SUPERSTRUCTURE REPLACEMENT, D-05-010, BUSSEY STREET OVER MOTHER BROOK 6 TRIC 35 2023 100% Package Comments to DE (as of 8/17/2022) $6,130,676   $0   $0   $0   $0     $2,165,266 $8,295,942 $6,130,676 $2,165,266
Littleton 609054 LITTLETON- RECONSTRUCTION OF FOSTER STREET 3 MAGIC 38 2024 100% Package Received (10/22/2022) $0   $3,992,645   $0   $0   $0     $0 $3,992,645 $3,992,645 $0
Winthrop 607244 WINTHROP- RECONSTRUCTION & RELATED WORK ALONG WINTHROP STREET & REVERE STREET CORRIDOR 6 ICC 54 2023 100% Package Received (10/24/2022) $6,779,797   $0   $0   $0   $0     $0 $6,779,797 $6,779,797 $0
MassDOT 603722 LEXINGTON- BRIDGE REPLACEMENT, L-10-010, ROUTE 2A (MARRETT ROAD) OVER I-95/ROUTE 128 4 MAGIC N/A 2023 100% received (6/30/2022) $0   $0   $0   $0   $0     $28,658,164 $28,658,164 $0 $28,658,164
MassDOT 608045 MILFORD- REHABILITATION ON ROUTE 16, FROM ROUTE 109 TO BEAVER STREET 3 SWAP 50 2026 25% Package Comments to DE (7/30/2022) $0   $0   $0   $10,119,616   $0     $0 $10,119,616 $10,119,616 $0
MassDOT 605313 NATICK- BRIDGE REPLACEMENT, N-03-020, ROUTE 27 (NORTH MAIN STREET) OVER ROUTE 9 (WORCESTER STREET) AND INTERCHANGE IMPROVEMENTS 3 MWRC 57.7 2024 25% Package Received - Resub 1 (5/16/2022) $0   $0   $0   $0   $0     $46,901,244 $46,901,244 $0 $46,901,244
Weston 608940 WESTON- INTERSECTION IMPROVEMENTS BOSTON POST ROAD (ROUTE 20) AT WELLESLEY STREET  6 MWRC 50.6 2026 25% Package Received - Resub 1 (5/18/2021) $0   $0   $0   $2,681,330   $0     $0 $2,681,330 $2,681,330 $0
Boston 606453 BOSTON- IMPROVEMENTS ON BOYLSTON STREET, FROM INTERSECTION OF BROOKLINE AVENUE & PARK DRIVE TO IPSWICH STREET 6 ICC 60 2023 25% resubmitted (1/29/2021) $0   $8,665,052   $0   $0   $0     $0 $8,665,052 $8,665,052 $0
Norwood 605857 NORWOOD- INTERSECTION IMPROVEMENTS @ ROUTE 1 & UNIVERSITY AVENUE/EVERETT STREET  5 TRIC 55 2025-26 25% resubmitted (1/5/2021) $0   $0   $9,000,000   $15,837,870   $0     $0 $24,837,870 $24,837,870 $0
Ipswich 605743 IPSWICH- RESURFACING & RELATED WORK ON CENTRAL & SOUTH MAIN STREETS 4 NSTF 48 2024 25% resubmitted (8/19/2020) $0   $5,490,888   $0   $0   $0     $0 $5,490,888 $5,490,888 $0
Boston 606226 BOSTON- RECONSTRUCTION OF RUTHERFORD AVENUE, FROM CITY SQUARE TO SULLIVAN SQUARE 6 ICC 59 2025-2027 25% resubmitted (May 2021) $0   $0   $32,783,959   $33,500,000   $33,500,000     $0 $99,783,959 $99,783,959 $0
Swampscott 610666 SWAMPSCOTT- RAIL TRAIL CONSTRUCTION 4 NSTF 66.4 2027 25% submitted (1/27/2021) $0   $0   $0   $0   $8,932,000     $0 $8,932,000 $8,932,000 $0
MassDOT 608955 MILTON- INTERSECTION IMPROVEMENTS SQUANTUM STREET AT ADAMS STREET 6 TRIC 34.4 2024 25% submitted (11/19/2020) $0   $0   $0   $0   $0     $2,403,651 $2,403,651 $0 $2,403,651
Belmont 609204 BELMONT- COMMUNITY PATH, BELMONT COMPONENT OF THE MCRT (PHASE I) 4 ICC 64.6 2026 25% submitted (11/3/2021) $0   $0   $0   $21,034,382   $0     $0 $21,034,382 $21,034,382 $0
Ashland 608436 ASHLAND- REHABILITATION AND RAIL CROSSING IMPROVEMENTS ON CHERRY STREET 3 MWRC 38 2024 25% submitted (2/4/2020) $0   $1,222,315   $0   $0   $0     $0 $1,222,315 $1,222,315 $0
Peabody 608933 *PEABODY- REHABILITATION OF CENTRAL STREET 4 NSTF 61 2023 25% submitted (DPH 6/23/2021) $15,219,860   $0   $0   $0   $0     $0 $15,219,860 $15,219,860 $0
Salem 609437 SALEM- PEABODY- BOSTON STREET IMPROVEMENTS 4 NSTF 67.8 2026 25% submitted (DPH 9/27/2022) $0   $0   $0   $13,977,600   $0     $0 $13,977,600 $13,977,600 $0
Beverly 608348 *BEVERLY- RECONSTRUCTION OF BRIDGE STREET 4 NSTF 66 2023 75% Approved (12/16/2021) $8,839,401   $0   $0   $0   $0     $3,755,531 $12,594,932 $8,839,401 $3,755,531
Quincy 608707 QUINCY- RECONSTRUCTION OF SEA STREET 6 ICC 40 2023 75% Package Comments to DE (as of 12/13/2021) $12,166,638   $0   $0   $0   $0     $0 $12,166,638 $12,166,638 $0
MassDOT 603739 WRENTHAM- CONSTRUCTION OF ROUTE I-495/ROUTE 1A RAMPS 5 SWAP 55 2024 75% Package Comments to DE (as of 8/02/2022) $0   $15,587,884   $0   $0   $0     $0 $15,587,884 $15,587,884 $0
MassDOT 110980 NEWTON- WESTON- BRIDGE REHABILITATION, N-12-010=W-29-005, COMMONWEALTH AVENUE (ROUTE 30) OVER THE CHARLES RIVER 6 ICC N/A 2024 75% Package Received (2/3/2022) $0   $22,725,820   $0   $0   $0     $0 $22,725,820 $22,725,820 $0
MassDOT 608051 WILMINGTON- RECONSTRUCTION ON ROUTE 38 (MAIN STREET), FROM ROUTE 62 TO THE WOBURN C.L. 4 NSPC 59 2025-26 75% submitted (1/18/2021) $0   $0   $24,644,177   $0   $0     $0 $24,644,177 $24,644,177 $0
MassDOT 606476 BOSTON- ROADWAY, CEILING, ARCH & WALL RECONSTRUCTION AND OTHER CONTROL SYSTEMS IN SUMNER TUNNEL 6 ICC N/A 2023 Advertised $0   $0   $0   $0   $0     $16,869,801 $16,869,801 $0 $16,869,801
Hingham 605168 HINGHAM- IMPROVEMENTS ON ROUTE 3A FROM OTIS STREET/COLE ROAD  INCLUDING SUMMER STREET AND ROTARY; ROCKLAND STREET TO GEORGE WASHINGTON BOULEVARD.   5 SSC 57 2025 DPH (1/11/2022) $0   $0   $15,596,550   $0   $0     $0 $15,596,550 $15,596,550 $0
Watertown 607777 *WATERTOWN- REHABILITATION OF MOUNT AUBURN STREET (ROUTE 16) 6 ICC 75 2023-24 DPH (11/04/2021) $24,405,096   $2,841,078   $0   $0   $0     $0 $27,246,174 $27,246,174 $0
Peabody 609211 PEABODY- INDEPENDENCE GREENWAY EXTENSION 4 NSTF 34 2024 DPH (6/22/2022) $0   $3,922,122   $0   $0   $0     $0 $3,922,122 $3,922,122 $0
Weston 608954 WESTON- RECONSTRUCTION ON ROUTE 30 6 MWRC 49.2 2026 DPH (9/22/2022) $0   $0   $0   $17,028,272   $0     $0 $17,028,272 $17,028,272 $0
Regionwide S12113 TRANSIT MODERNIZATION PROGRAM Regionwide Regionwide N/A 2025-27 Admin $0   $0   $6,500,000   $6,500,000   $6,500,000     $0 $19,500,000 $19,500,000 $0
Canton S12114 ROYALL STREET SHUTTLE 6 TRIC 51 2023-24 Community Connections: Operating $177,177   $148,542   $0   $0   $0     $0 $325,719 $325,719 $0
Regionwide S12124 COMMUNITY CONNECTIONS PROGRAM Regionwide Regionwide N/A 2024-27 Admin $0   $641,495   $1,075,304   $2,500,000   $2,500,000     $0 $6,716,799 $6,716,799 $0
Newton S12694 NEWMO MICROTRANSIT SERVICE EXPANSION 6 ICC 87 2023-2025 Community Connections: Operating $412,665   $268,246   $209,663   $0   $0     $0 $890,574 $890,574 $0
Cambridge S12695 BLUEBIKES STATION REPLACEMENT AND SYSTEM EXPANSION 6 ICC 78 2023 Community Connections: Construction $349,608   $0   $0   $0   $0     $0 $349,608 $349,608 $0
Medford S12696 BLUEBIKES SYSTEM EXPANSION 4 ICC 78 2023 Community Connections: Construction $145,821   $0   $0   $0   $0     $0 $145,821 $145,821 $0
Watertown S12697 PLEASANT STREET SHUTTLE SERVICE EXPANSION 6 ICC 78 2023-2025 Community Connections: Operating $437,825   $335,434   $228,939   $0   $0     $0 $1,002,198 $1,002,198 $0
Salem S12698 BLUEBIKES SYSTEM EXPANSION 4 NSTF 77 2023 Community Connections: Construction $119,629   $0   $0   $0   $0     $0 $119,629 $119,629 $0
Stoneham S12699 STONEHAM SHUTTLE SERVICE 4 NSPC 72 2023-2025 Community Connections: Operating $330,189   $261,439   $205,189   $0   $0     $0 $796,817 $796,817 $0
CATA S12700 CATA ON DEMAND MICROTRANSIT SERVICE EXPANSION 4 NSTF 61.75 2023-2025 Community Connections: Operating $333,450   $265,065   $214,776   $0   $0     $0 $813,291 $813,291 $0
MWRTA S12701 MWRTA CATCHCONNECT MICROTRANSIT SERVICE EXPANSION 3 MWRC 59 2023-2025 Community Connections: Operating $141,250   $149,425   $159,488   $0   $0     $0 $450,163 $450,163 $0
Acton S12702 BICYCLE PARKING ALONG THE BRUCE FREEMAN RAIL TRAIL 3 MAGIC 58 2023 Community Connections: Construction $8,017   $0   $0   $0   $0     $0 $8,017 $8,017 $0
MART S12703 MONTACHUSETT RTA MICROTRANSIT SERVICE 3 MAGIC 57 2023-2025 Community Connections: Operating $479,066   $430,354   $406,641   $0   $0     $0 $1,316,061 $1,316,061 $0
Belmont S12704 CHENERY MIDDLE SCHOOL BICYCLE PARKING 4 ICC 49.75 2023 Community Connections: Construction $8,289   $0   $0   $0   $0     $0 $8,289 $8,289 $0
MBTA S12705 LYNN STATION IMPROVEMENTS PHASE II 4 ICC N/A 2023-2024 MBTA Project $34,500,000   $13,600,000   $0   $0   $0     $0 $48,100,000 $48,100,000 $0
MBTA S12706 FOREST HILLS IMPROVEMENT PROJECT 6 ICC N/A 2024 MBTA Project $0   $6,400,000   $0   $0   $0     $0 $6,400,000 $6,400,000 $0
MassDOT 608067 WOBURN- INTERSECTION RECONSTRUCTION AT ROUTE 3 (CAMBRIDGE ROAD) & BEDFORD ROAD AND SOUTH BEDFORD STREET 4 NSPC 52 2025 PRC approved (11/6/2014) $0   $0   $1,555,200   $0   $0     $0 $1,555,200 $1,555,200 $0
Peabody 610544 PEABODY- MULTI-USE PATH CONSTRUCTION OF INDEPENDENCE GREENWAY AT I-95 AND ROUTE 1 4 NSTF 53 2025 PRC approved (12/19/2019) $0   $0   $6,334,200   $0   $0     $0 $6,334,200 $6,334,200 $0
Woburn 610662 WOBURN- ROADWAY AND INTERSECTION IMPROVEMENTS AT WOBURN COMMON, ROUTE 38 (MAIN STREET), WINN STREET, PLEASANT STREET AND MONTVALE AVENUE 4 NSPC 75 2025 PRC approved (12/19/2019) $0   $0   $15,530,400   $0   $0     $0 $15,530,400 $15,530,400 $0
Lynn 609252 LYNN- REHABILITATION OF ESSEX STREET 4 ICC 66 2024 PRC approved (12/6/2018) $0   $17,602,000   $0   $0   $0     $0 $17,602,000 $17,602,000 $0
Everett 609257 EVERETT- RECONSTRUCTION OF BEACHAM STREET 4 ICC 54 2025 PRC approved (12/6/2018) $0   $0   $10,168,416   $0   $0     $0 $10,168,416 $10,168,416 $0
MassDOT 607981 SOMERVILLE- MCGRATH BOULEVARD CONSTRUCTION 4 ICC 72.2 2027 PRC approved (2014) $0   $0   $0   $0   $20,000,000     $0 $20,000,000 $20,000,000 $0
Lynn 609246 LYNN- REHABILITATION OF WESTERN AVENUE (ROUTE 107) 4 ICC 74.9 2027 PRC approved (2018) $0   $0   $0   $0   $15,000,000     $0 $15,000,000 $15,000,000 $0
Brookline 610932 BROOKLINE- REHABILITATION OF WASHINGTON STREET 6 ICC 62.4 2027 PRC approved (2020) $0   $0   $0   $0   $30,030,812     $0 $30,030,812 $30,030,812 $0
Chelsea 611983 *CHELSEA- PARK STREET & PEARL STREET RECONSTRUCTION 6 ICC 69.9 2027 PRC approved (2021) $0   $0   $0   $0   $12,123,769     $0 $12,123,769 $12,123,769 $0
Framingham 608889 FRAMINGHAM- TRAFFIC SIGNAL INSTALLATION AT EDGELL ROAD AT CENTRAL STREET 3 MWRC 41 2023 PS&E Received (08/08/2022) $2,484,704   $0   $0   $0   $0     $0 $2,484,704 $2,484,704 $0
MassDOT 604564 MAYNARD- BRIDGE REPLACEMENT, M-10-004, ROUTE 62 (MAIN STREET) OVER THE ASSABET RIVER State Highway Project State Highway Project State Highway Project State Highway Project State Highway Project $0   $0   $0   $0   $0     $1,520,953 $1,520,953 $0 $1,520,953
MassDOT 605276 BEVERLY- SALEM- DRAWBRIDGE REPLACEMENT/REHABILITATION OF B-11-005=S-01-013, KERNWOOD AVENUE OVER DANVERS RIVER State Highway Project State Highway Project State Highway Project State Highway Project State Highway Project $0   $0   $0   $0   $0     $95,383,436 $95,383,436 $0 $95,383,436
MassDOT 605321 NORWOOD- BRIDGE PRESERVATION, N-25-026, PROVIDENCE HIGHWAY (STATE ROUTE 1) OVER THE NEPONSET RIVER State Highway Project State Highway Project State Highway Project State Highway Project State Highway Project $0   $0   $0   $0   $0     $3,588,426 $3,588,426 $0 $3,588,426
MassDOT 606449 CAMBRIDGE- BRIDGE REPLACEMENT, C-01-008, FIRST STREET BRIDGE & C-01-040, LAND BOULEVARD/BROAD CANAL BRIDGE State Highway Project State Highway Project State Highway Project State Highway Project State Highway Project $0   $0   $0   $0   $0     $14,896,000 $14,896,000 $0 $14,896,000
MassDOT 606496 BOSTON- BRIDGE REHABILITATION, B-16-052, BOWKER OVERPASS OVER MASS PIKE, MBTA/CSX, & IPSWICH STREET AND RAMPS (BINS 4FD, 4FG, 4FE, 4FF & 4FJ) State Highway Project State Highway Project State Highway Project State Highway Project State Highway Project $0   $0   $0   $0   $0     $49,450,000 $49,450,000 $0 $49,450,000
MassDOT 606728 BOSTON- BRIDGE REPLACEMENT B-16-365, STORROW DRIVE OVER BOWKER RAMPS State Highway Project State Highway Project State Highway Project State Highway Project State Highway Project $0   $0   $0   $0   $0     $116,058,000 $116,058,000 $0 $116,058,000
MassDOT 606901 BOSTON- BRIDGE REPLACEMENT, B-16-109, RIVER STREET BRIDGE OVER MBTA/AMTRAK State Highway Project State Highway Project State Highway Project State Highway Project State Highway Project $0   $0   $0   $0   $0     $11,732,339 $11,732,339 $0 $11,732,339
MassDOT 606902 BOSTON- BRIDGE REPLACEMENT, B-16-181, WEST ROXBURY PARKWAY OVER MBTA State Highway Project State Highway Project State Highway Project State Highway Project State Highway Project $0   $0   $0   $0   $0     $6,644,290 $6,644,290 $0 $6,644,290
MassDOT 607327 WILMINGTON- BRIDGE REPLACEMENT, W-38-002, ROUTE 38 (MAIN STREET) OVER THE B&M RAILROAD State Highway Project State Highway Project State Highway Project State Highway Project State Highway Project $0   $0   $0   $0   $0     $9,200,000 $9,200,000 $0 $9,200,000
MassDOT 607329 WAKEFIELD- LYNNFIELD- RAIL TRAIL EXTENSION, FROM THE GALVIN MIDDLE SCHOOL TO LYNNFIELD/PEABODY T.L. State Highway Project State Highway Project State Highway Project State Highway Project State Highway Project $0   $0   $0   $0   $0     $12,360,675 $12,360,675 $0 $12,360,675
MassDOT 607342 MILTON- INTERSECTION & SIGNAL IMPROVEMENTS @ ROUTE 28 (RANDOLPH AVENUE) & CHICKATAWBUT ROAD State Highway Project State Highway Project State Highway Project State Highway Project State Highway Project $0   $0   $0   $0   $0     $7,062,751 $7,062,751 $0 $7,062,751
MassDOT 607420 NATICK- SUPERSTRUCTURE REPLACEMENT, N-03-012, BODEN LANE OVER CSX/MBTA State Highway Project State Highway Project State Highway Project State Highway Project State Highway Project $0   $0   $0   $0   $0     $8,270,800 $8,270,800 $0 $8,270,800
MassDOT 607684 BRAINTREE- BRIDGE REPLACEMENT, B-21-017, WASHINGTON STREET (ST 37) OVER MBTA/CSX RAILROAD State Highway Project State Highway Project State Highway Project State Highway Project State Highway Project $0   $0   $0   $0   $0     $7,681,489 $7,681,489 $0 $7,681,489
MassDOT 607748 ACTON- INTERSECTION & SIGNAL IMPROVEMENTS ON SR 2 & SR 111 (MASSACHUSETTS AVENUE) AT PIPER ROAD & TAYLOR ROAD State Highway Project State Highway Project State Highway Project State Highway Project State Highway Project $0   $0   $0   $0   $0     $4,231,214 $4,231,214 $0 $4,231,214
MassDOT 607977 HOPKINTON- WESTBOROUGH- RECONSTRUCTION OF I-90/I-495 INTERCHANGE State Highway Project State Highway Project State Highway Project State Highway Project State Highway Project $0   $0   $0   $0   $0     $329,953,874 $329,953,874 $0 $329,953,874
MassDOT 608009 BOXBOROUGH- BRIDGE REPLACEMENT, B-18-002, ROUTE 111 OVER I-495 State Highway Project State Highway Project State Highway Project State Highway Project State Highway Project $0   $0   $0   $0   $0     $12,763,392 $12,763,392 $0 $12,763,392
MassDOT 608197 BOSTON- BRIDGE REHABILITATION, B-16-107, CANTERBURY STREET OVER AMTRAK RAILROAD State Highway Project State Highway Project State Highway Project State Highway Project State Highway Project $0   $0   $0   $0   $0     $4,504,926 $4,504,926 $0 $4,504,926
MassDOT 608208 QUINCY- MILTON- BOSTON- INTERSTATE MAINTENANCE & RELATED WORK ON I-93 State Highway Project State Highway Project State Highway Project State Highway Project State Highway Project $0   $0   $0   $0   $0     $38,671,350 $38,671,350 $0 $38,671,350
MassDOT 608255 STOW- BRIDGE REPLACEMENT, S-29-011, BOX MILL ROAD OVER ELIZABETH BROOK State Highway Project State Highway Project State Highway Project State Highway Project State Highway Project $0   $0   $0   $0   $0     $3,454,408 $3,454,408 $0 $3,454,408
MassDOT 608480 FOXBOROUGH- RESURFACING AND RELATED WORK ON ROUTE 1 State Highway Project State Highway Project State Highway Project State Highway Project State Highway Project $0   $0   $0   $0   $0     $9,442,596 $9,442,596 $0 $9,442,596
MassDOT 608498 QUINCY- WEYMOUTH- BRAINTREE- RESURFACING AND RELATED WORK ON ROUTE 53 State Highway Project State Highway Project State Highway Project State Highway Project State Highway Project $0   $0   $0   $0   $0     $6,000,522 $6,000,522 $0 $6,000,522
MassDOT 608514 BEVERLY- BRIDGE REPLACEMENT, B-11-001, BRIDGE STREET OVER BASS RIVER (HALL-WHITAKER DRAWBRIDGE) State Highway Project State Highway Project State Highway Project State Highway Project State Highway Project $0   $0   $0   $0   $0     $40,020,000 $40,020,000 $0 $40,020,000
MassDOT 608522 MIDDLETON- BRIDGE REPLACEMENT, M-20-003, ROUTE 62 (MAPLE STREET) OVER IPSWICH RIVER State Highway Project State Highway Project State Highway Project State Highway Project State Highway Project $0   $0   $0   $0   $0     $3,781,398 $3,781,398 $0 $3,781,398
MassDOT 608562 SOMERVILLE- SIGNAL AND INTERSECTION IMPROVEMENT ON I-93 AT MYSTIC AVENUE AND MCGRATH HIGHWAY (TOP 200 CRASH LOCATION) State Highway Project State Highway Project State Highway Project State Highway Project State Highway Project $0   $0   $0   $0   $0     $6,525,116 $6,525,116 $0 $6,525,116
MassDOT 608564 WATERTOWN- INTERSECTION IMPROVEMENTS AT ROUTE 16 AND GALEN STREET State Highway Project State Highway Project State Highway Project State Highway Project State Highway Project $0   $0   $0   $0   $0     $3,080,230 $3,080,230 $0 $3,080,230
MassDOT 608609 BOSTON- WESTWOOD- STEEL SUPERSTRUCTURE CLEANING (FULL REMOVAL) AND PAINTING OF 2 BRIDGES: B-16-118 & W-31-006 State Highway Project State Highway Project State Highway Project State Highway Project State Highway Project $0   $0   $0   $0   $0     $2,142,857 $2,142,857 $0 $2,142,857
MassDOT 608703 WILMINGTON- BRIDGE REPLACEMENT, W-38-029 (2KV), ST 129 LOWELL STREET OVER I 93 State Highway Project State Highway Project State Highway Project State Highway Project State Highway Project $0   $0   $0   $0   $0     $15,951,816 $15,951,816 $0 $15,951,816
MassDOT 608818 *DANVERS- MIDDLETON- RESURFACING AND RELATED WORK ON ROUTE 114 State Highway Project State Highway Project State Highway Project State Highway Project State Highway Project $0   $0   $0   $0   $0     $5,837,027 $5,837,027 $0 $5,837,027
MassDOT 608929 WILMINGTON- BRIDGE REPLACEMENT, W-38-003, BUTTERS ROW OVER MBTA State Highway Project State Highway Project State Highway Project State Highway Project State Highway Project $0   $0   $0   $0   $0     $10,225,199 $10,225,199 $0 $10,225,199
MassDOT 608952 CHELSEA- BRIDGE SUPERSTRUCTURE REPLACMENT C-09-013, WASHINGTON AVENUE, CARTER STREET & COUNTY ROAD/ROUTE 1 State Highway Project State Highway Project State Highway Project State Highway Project State Highway Project $0   $0   $0   $0   $0     $10,584,000 $10,584,000 $0 $10,584,000
MassDOT 609053 CANTON- DEDHAM- NORWOOD- HIGHWAY LIGHTING IMPROVEMENTS AT I-93 & I-95/128 State Highway Project State Highway Project State Highway Project State Highway Project State Highway Project $0   $0   $0   $0   $0     $3,800,868 $3,800,868 $0 $3,800,868
MassDOT 609254 LYNN- INTERSECTION IMPROVEMENTS AT TWO INTERSECTIONS ON BROADWAY State Highway Project State Highway Project State Highway Project State Highway Project State Highway Project $0   $0   $0   $0   $0     $5,413,401 $5,413,401 $0 $5,413,401
MassDOT 609399 RANDOLPH- RESURFACING AND RELATED WORK ON ROUTE 28 State Highway Project State Highway Project State Highway Project State Highway Project State Highway Project $0   $0   $0   $0   $0     $6,930,814 $6,930,814 $0 $6,930,814
MassDOT 609402 FRAMINGHAM- NATICK- RESURFACING AND RELATED WORK ON ROUTE 9 State Highway Project State Highway Project State Highway Project State Highway Project State Highway Project $0   $0   $0   $0   $0     $48,665,364 $48,665,364 $0 $48,665,364
MassDOT 609438 CANTON- BRIDGE REPLACEMENT, C-02-042, REVERE COURT OVER WEST BRANCH OF  THE NEPONSET RIVER State Highway Project State Highway Project State Highway Project State Highway Project State Highway Project $0   $0   $0   $0   $0     $2,185,168 $2,185,168 $0 $2,185,168
MassDOT 609467 HAMILTON- IPSWICH- SUPERSTRUCTURE REPLACEMENT, H-03-002=I-01-006, WINTHROP STREET OVER IPSWICH RIVER State Highway Project State Highway Project State Highway Project State Highway Project State Highway Project $0   $0   $0   $0   $0     $3,135,789 $3,135,789 $0 $3,135,789
MassDOT 609516 BURLINGTON- IMPROVEMENTS AT I-95 (ROUTE 128)/ROUTE 3 INTERCHANGE State Highway Project State Highway Project State Highway Project State Highway Project State Highway Project $0   $0   $0   $0   $0     $3,121,560 $3,121,560 $0 $3,121,560
MassDOT 609527 READING- IMPROVEMENTS ON I-95 State Highway Project State Highway Project State Highway Project State Highway Project State Highway Project $0   $0   $0   $0   $0     $17,376,800 $17,376,800 $0 $17,376,800
Medway 609530 MEDWAY- HOLLISTON STREET AND CASSIDY LANE IMPROVEMENTS (SRTS) State Highway Project State Highway Project State Highway Project State Highway Project State Highway Project $0   $0   $0   $0   $0     $2,807,468 $2,807,468 $0 $2,807,468
Arlington 609531 ARLINGTON- STRATTON SCHOOL IMPROVEMENTS (SRTS) State Highway Project State Highway Project State Highway Project State Highway Project State Highway Project $0   $0   $0   $0   $0     $1,302,209 $1,302,209 $0 $1,302,209
MassDOT 609532 CHELSEA- TARGETED SAFETY IMPROVEMENTS AND RELATED WORK ON BROADWAY, FROM WILLIAMS STREET TO CITY HALL AVENUE State Highway Project State Highway Project State Highway Project State Highway Project State Highway Project $0   $0   $0   $0   $0     $6,557,898 $6,557,898 $0 $6,557,898
Boston 610537 BOSTON- ELLIS ELEMENTARY TRAFFIC CALMING (SRTS) State Highway Project State Highway Project State Highway Project State Highway Project State Highway Project $0   $0   $0   $0   $0     $2,361,218 $2,361,218 $0 $2,361,218
MassDOT 610541 CANTON- INTERIM INTERCHANGE IMPROVEMENTS AT I-95/ROUTE 128/I-93  State Highway Project State Highway Project State Highway Project State Highway Project State Highway Project $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $6,169,280 $6,169,280 $0 $6,169,280
MassDOT 610543 REVERE- MALDEN- IMPROVEMENTS AT ROUTE 1 (NB) State Highway Project State Highway Project State Highway Project State Highway Project State Highway Project $0   $0   $0   $0   $0     $8,363,600 $8,363,600 $0 $8,363,600
MassDOT 610552 MARLBOROUGH- HUDSON- RAMP IMPROVEMENTS AND RELATED WORK AT I-495 (SB) TO I-290 (WB) State Highway Project State Highway Project State Highway Project State Highway Project State Highway Project $0   $0   $0   $0   $0     $5,941,995 $5,941,995 $0 $5,941,995
MassDOT 610660 SUDBURY- WAYLAND- MASS CENTRAL RAIL TRAIL (MCRT) State Highway Project State Highway Project State Highway Project State Highway Project State Highway Project $0   $0   $0   $0   $0     $4,206,464 $4,206,464 $0 $4,206,464
MassDOT 610665 STONEHAM- INTERSECTION IMPROVEMENTS AT ROUTE 28 (MAIN STREET), NORTH BORDER ROAD AND SOUTH STREET State Highway Project State Highway Project State Highway Project State Highway Project State Highway Project $0   $0   $0   $0   $0     $4,872,001 $4,872,001 $0 $4,872,001
Newton 610674 NEWTON- RECONSTRUCTION OF COMMONWEALTH AVENUE (ROUTE 30), FROM EAST OF AUBURN STREET TO ASH STREET State Highway Project State Highway Project State Highway Project State Highway Project State Highway Project $0   $0   $0   $0   $0     $6,546,367 $6,546,367 $0 $6,546,367
MassDOT 610680 NATICK- LAKE COCHITUATE PATH State Highway Project State Highway Project State Highway Project State Highway Project State Highway Project $0   $0   $0   $0   $0     $3,582,995 $3,582,995 $0 $3,582,995
MassDOT 610722 ACTON- BOXBOROUGH- LITTLETON- PAVEMENT PRESERVATION ROUTE 2 State Highway Project State Highway Project State Highway Project State Highway Project State Highway Project $0   $0   $0   $0   $0     $7,563,792 $7,563,792 $0 $7,563,792
MassDOT 610726 MEDFORD- READING- SOMERVILLE- STONEHAM- WINCHESTER- WOBURN- INTERSTATE PAVEMENT PRESERVATION ON I-93 State Highway Project State Highway Project State Highway Project State Highway Project State Highway Project $0   $0   $0   $0   $0     $48,391,130 $48,391,130 $0 $48,391,130
MassDOT 610776 CAMBRIDGE- SUPERSTRUCTURE REPLACEMENT, C-01-031, US ROUTE 3/ROUTE 16/ROUTE 2 OVER MBTA REDLINE State Highway Project State Highway Project State Highway Project State Highway Project State Highway Project $0   $0   $0   $0   $0     $13,424,399 $13,424,399 $0 $13,424,399
MassDOT 610782 DANVERS- MIDDLETON- BRIDGE REPLACEMENT, D-03-009=M-20-005, ANDOVER STREET (SR 114) OVER IPSWICH RIVER State Highway Project State Highway Project State Highway Project State Highway Project State Highway Project $0   $0   $0   $0   $0     $5,279,051 $5,279,051 $0 $5,279,051
MassDOT 610919 LYNN- NAHANT- NORTHERN STRAND EXTENSION State Highway Project State Highway Project State Highway Project State Highway Project State Highway Project $0   $0   $0   $0   $0     $9,363,750 $9,363,750 $0 $9,363,750
MassDOT 611954 BOSTON- GUIDE AND TRAFFIC SIGN REPLACEMENT ON I-90/I-93 WITHIN CENTRAL ARTERY/TUNNEL SYSTEM State Highway Project State Highway Project State Highway Project State Highway Project State Highway Project $0   $0   $0   $0   $0     $2,513,504 $2,513,504 $0 $2,513,504
MassDOT 611969 EVERETT- INTERSECTION IMPROVEMENTS ON ROUTE 16 State Highway Project State Highway Project State Highway Project State Highway Project State Highway Project $0   $0   $0   $0   $0     $17,748,000 $17,748,000 $0 $17,748,000
MassDOT 611974 MEDFORD- INTERSECTION IMPROVEMENTS AT MAIN STREET/SOUTH STREET, MAIN STREET/MYSTIC VALLEY PARKWAY RAMPS, AND MAIN STREET/MYSTIC AVENUE State Highway Project State Highway Project State Highway Project State Highway Project State Highway Project $0   $0   $0   $0   $0     $9,517,760 $9,517,760 $0 $9,517,760
MassDOT 611982 MEDFORD- SHARED USE PATH CONNECTION AT THE ROUTE 28/WELLINGTON UNDERPASS State Highway Project State Highway Project State Highway Project State Highway Project State Highway Project $0   $0   $0   $0   $0     $4,676,111 $4,676,111 $0 $4,676,111
MassDOT 611987 CAMBRIDGE- BRIDGE REPLACEMENT, C-01-026, MEMORIAL DRIVE OVER BROOKLINE STREET State Highway Project State Highway Project State Highway Project State Highway Project State Highway Project $0   $0   $0   $0   $0     $52,933,955 $52,933,955 $0 $52,933,955
Newton 611997 NEWTON- HORACE MANN ELEMENTARY SCHOOL IMPROVEMENTS (SRTS) State Highway Project State Highway Project State Highway Project State Highway Project State Highway Project $0   $0   $0   $0   $0     $861,962 $861,962 $0 $861,962
Medford 612001 MEDFORD- MILTON FULLER ROBERTS ELEMENTARY SCHOOL (SRTS) State Highway Project State Highway Project State Highway Project State Highway Project State Highway Project $0   $0   $0   $0   $0     $1,020,854 $1,020,854 $0 $1,020,854
MassDOT 612028 STONEHAM- DECK REPLACEMENT & SUPERSTRUCTURE REPAIRS, S-27-006 (2L2), (ST 28) FELLSWAY WEST OVER I-93 State Highway Project State Highway Project State Highway Project State Highway Project State Highway Project $0   $0   $0   $0   $0     $3,240,000 $3,240,000 $0 $3,240,000
MassDOT 612034 BURLINGTON- WOBURN- INTERSTATE MAINTENANCE AND RELATED WORK ON I-95 State Highway Project State Highway Project State Highway Project State Highway Project State Highway Project $0   $0   $0   $0   $0     $12,947,687 $12,947,687 $0 $12,947,687
MassDOT 612048 WALTHAM- INTERSTATE MAINTENANCE AND RELATED WORK ON I-95 State Highway Project State Highway Project State Highway Project State Highway Project State Highway Project $0   $0   $0   $0   $0     $16,680,742 $16,680,742 $0 $16,680,742
MassDOT 612049 RANDOLPH- RESURFACING AND RELATED WORK ON ROUTE 24 State Highway Project State Highway Project State Highway Project State Highway Project State Highway Project $0   $0   $0   $0   $0     $9,466,800 $9,466,800 $0 $9,466,800
MassDOT 612050 BRAINTREE- WEYMOUTH- RESURFACING AND RELATED WORK ON ROUTE 3 State Highway Project State Highway Project State Highway Project State Highway Project State Highway Project $0   $0   $0   $0   $0     $8,584,520 $8,584,520 $0 $8,584,520
MassDOT 612051 CANTON- MILTON- RANDOLPH- INTERSTATE MAINTENANCE AND RELATED WORK ON I-93 State Highway Project State Highway Project State Highway Project State Highway Project State Highway Project $0   $0   $0   $0   $0     $15,407,700 $15,407,700 $0 $15,407,700
MassDOT 612075 SALEM- BRIDGE REPLACEMENT, S-01-024, JEFFERSON AVENUE OVER PARALLEL STREET State Highway Project State Highway Project State Highway Project State Highway Project State Highway Project $0   $0   $0   $0   $0     $3,239,040 $3,239,040 $0 $3,239,040
MassDOT 612076 TOPSFIELD- BRIDGE REPLACEMENT, T-06-013, PERKINS ROW OVER MILE BROOK State Highway Project State Highway Project State Highway Project State Highway Project State Highway Project $0   $0   $0   $0   $0     $3,258,119 $3,258,119 $0 $3,258,119
MassDOT 612099 ASHLAND- BRIDGE REPLACEMENT, A-14-006, CORDAVILLE ROAD OVER SUDBURY RIVER State Highway Project State Highway Project State Highway Project State Highway Project State Highway Project $0   $0   $0   $0   $0     $3,965,472 $3,965,472 $0 $3,965,472
Revere 612100 REVERE- IMPROVEMENTS AT BEACHMONT VETERANS ELEMENTARY (SRTS) State Highway Project State Highway Project State Highway Project State Highway Project State Highway Project $0   $0   $0   $0   $0     $338,381 $338,381 $0 $338,381
MassDOT 612173 BELLINGHAM- BRIDGE REPLACEMENT, B-06-022, MAPLE STREET OVER I-495 State Highway Project State Highway Project State Highway Project State Highway Project State Highway Project $0   $0   $0   $0   $0     $14,249,535 $14,249,535 $0 $14,249,535
MassDOT 612178 NATICK- BRIDGE REPLACEMENT, N-03-010, SPEEN STREET OVER RR MBTA/CSX State Highway Project State Highway Project State Highway Project State Highway Project State Highway Project $0   $0   $0   $0   $0     $6,711,629 $6,711,629 $0 $6,711,629
MassDOT 612182 NEWTON- BRIDGE REPLACEMENT, N-12-040, BOYLSTON STREET OVER GREEN LINE D State Highway Project State Highway Project State Highway Project State Highway Project State Highway Project $0   $0   $0   $0   $0     $15,186,854 $15,186,854 $0 $15,186,854
MassDOT 612184 REVERE- BRIDGE REPLACEMENT, R-05-015, REVERE BEACH PARKWAY OVER BROADWAY State Highway Project State Highway Project State Highway Project State Highway Project State Highway Project $0   $0   $0   $0   $0     $20,243,805 $20,243,805 $0 $20,243,805
MassDOT 612196 BRAINTREE- BRIDGE REPLACEMENT, B-21-067, JW MAHER HIGHWAY OVER MONATIQUOT RIVER State Highway Project State Highway Project State Highway Project State Highway Project State Highway Project $0   $0   $0   $0   $0     $11,876,518 $11,876,518 $0 $11,876,518
MassDOT 612496 SOMERVILLE- BRIDGE PRESERVATION, S-17-031, I-93 (NB & SB) FROM ROUTE 28 TO TEMPLE STREET (PHASE 2) State Highway Project State Highway Project State Highway Project State Highway Project State Highway Project $0   $0   $0   $0   $0     $203,259,260 $203,259,260 $0 $203,259,260
MassDOT 612499 MEDFORD- SOUTH MEDFORD CONNECTOR BIKE PATH State Highway Project State Highway Project State Highway Project State Highway Project State Highway Project $0   $0   $0   $0   $0     $7,903,741 $7,903,741 $0 $7,903,741
MassDOT 612519 * BOSTON- BRIDGE REPLACEMENT, B-16-165, BLUE HILL AVENUE OVER RAILROAD State Highway Project State Highway Project State Highway Project State Highway Project State Highway Project $0   $0   $0   $0   $0     $36,007,685 $36,007,685 $0 $36,007,685
MassDOT 612523 REVERE- STATE ROAD BEACHMONT CONNECTOR State Highway Project State Highway Project State Highway Project State Highway Project State Highway Project $0   $0   $0   $0   $0     $5,095,005 $5,095,005 $0 $5,095,005
MassDOT 612599 LYNN- TARGETED SAFETY AND MULTIMODAL IMPROVEMENTS (PLAYBOOK PRIORITY CORRIDORS) State Highway Project State Highway Project State Highway Project State Highway Project State Highway Project $0   $0   $0   $0   $0     $8,937,800 $8,937,800 $0 $8,937,800
MassDOT 612607 DANVERS- RAIL TRAIL WEST EXTENSION (PHASE 3) State Highway Project State Highway Project State Highway Project State Highway Project State Highway Project $0   $0   $0   $0   $0     $3,288,600 $3,288,600 $0 $3,288,600
MassDOT 612615 * CANTON- MILTON- ROADWAY RECONSTRUCTION ON ROUTE 138, FROM ROYALL STREET TO DOLLAR LANE State Highway Project State Highway Project State Highway Project State Highway Project State Highway Project $0   $0   $0   $0   $0     $18,360,944 $18,360,944 $0 $18,360,944
MassDOT 612624 BOSTON- DECK REPLACEMENT, B-16-056, CAMBRIDGE STREET OVER I-90, INCLUDES PRESERVATION OF B-16-057, LINCOLN STREET PED OVERPASS OVER I-90 State Highway Project State Highway Project State Highway Project State Highway Project State Highway Project $0   $0   $0   $0   $0     $0 $0 $0 $0
MassDOT 612662 BOSTON- BRIDGE PRESERVATION, B-16-235 (39T & 3A0), ROUTE 1A OVER CHELSEA STREET/BREMEN STREET & RAILROAD State Highway Project State Highway Project State Highway Project State Highway Project State Highway Project $0   $0   $0   $0   $0     $3,000,000 $3,000,000 $0 $3,000,000
MassDOT 612663 BOSTON- BRIDGE PRESERVATION, B-16-053 (4T3), BROOKLINE AVENUE OVER I-90 & RAILROAD State Highway Project State Highway Project State Highway Project State Highway Project State Highway Project $0   $0   $0   $0   $0     $750,000 $750,000 $0 $750,000
MassDOT 612664 BOSTON- BRIDGE PRESERVATION, B-16-179, AUSTIN STREET OVER I-93 AND B-16-281, I-93 UPPER/LOWER DECK State Highway Project State Highway Project State Highway Project State Highway Project State Highway Project $0   $0   $0   $0   $0     $3,500,400 $3,500,400 $0 $3,500,400
MassDOT 612804 DEDHAM- IMPROVEMENTS AT AVERY ELEMENTARY (SRTS) State Highway Project State Highway Project State Highway Project State Highway Project State Highway Project $0   $0   $0   $0   $0     $1,686,569 $1,686,569 $0 $1,686,569
MassDOT 612816 BROOKLINE- IMPROVEMENTS AT WILLIAM H. LINCOLN SCHOOL (SRTS) State Highway Project State Highway Project State Highway Project State Highway Project State Highway Project $0   $0   $0   $0   $0     $919,360 $919,360 $0 $919,360
MassDOT 612884 CHELSEA- IMPROVEMENTS AT MARY C. BURKE ELEMENTARY (SRTS) State Highway Project State Highway Project State Highway Project State Highway Project State Highway Project $0   $0   $0   $0   $0     $1,677,581 $1,677,581 $0 $1,677,581
MassDOT 612889 SHARON- COTTAGE STREET SCHOOL IMPROVEMENTS (SRTS) State Highway Project State Highway Project State Highway Project State Highway Project State Highway Project $0   $0   $0   $0   $0     $1,553,384 $1,553,384 $0 $1,553,384
MassDOT 612894 FRAMINGHAM- IMPROVEMENTS AT HARMONY GROVE ELEMENTARY SCHOOL (SRTS) State Highway Project State Highway Project State Highway Project State Highway Project State Highway Project $0   $0   $0   $0   $0     $1,420,810 $1,420,810 $0 $1,420,810
Newton S12125 NEWTON MICROTRANSIT SERVICE 4 ICC 53 2021-2023 Community Connections: Operating $152,000   $0   $0   $0   $0     $0 $152,000 $152,000 $0
MassDOT S12640 FRAMINGHAM-HIGH RISK AT-GRADE RAILROAD CROSSING COUNTERMEASURES ON ROUTE 126 State Highway Project State Highway Project State Highway Project State Highway Project State Highway Project $0   $0   $0   $0   $0     $3,500,000 $3,500,000 $0 $3,500,000
      2023 2024 2025 2026 2027 2028
Projects in red text were identified as being high risk for not meeting their advertisement date at February 2021 TIP readiness meeting. Total Available Regional Highway Target Funds (2024-28 STIP): $128,950,081 $130,647,095 $128,427,689 $125,285,687 $155,132,142 $158,052,175
*Projects with an asterisk were identified as candidates to remain in current year if near-term issue resolution occurs. Total AVAILABLE Regional Highway Target Funds (2024-28 STIP): $128,950,081 $130,647,095 $128,427,689   N/A      
  Current Proposed Current Proposed Current Proposed Current Proposed Current Proposed Proposed
Indicates an increase in project cost (> $500,000 or 20% of project cost) Draft Total Programmed Regional Highway Target Funds: $128,014,796 $0 $117,059,590 $0 $124,612,902 $0 $123,179,070 $0 $128,586,581 $0 $0
Indicates a project was recommended to move out to a later TIP year Regional Highway Target Funds Remaining (Unprogrammed): $935,285 $128,950,081 $13,587,505 $130,647,095 $3,814,787 $128,427,689 $2,106,617 $125,285,687 $26,545,561 $155,132,142 $158,052,175
Percent Unprogrammed 0.7% 100.0% 10.4% 100.0% 3.0% 100.0% 1.7% 100.0% 17.1% 100.0% 100.0%
Indicates a project was recommended to move into an earlier TIP year
Indicates a project is proposed to be newly added to the TIP
LRTP Goal
CS 45
MI 30
INT 13
B/P 5
TM 5
CC 2
Total allocated
Remaining

 

MassDOT and MBTA Projects

Recommended Programming Year Project Proponent Project ID Project Name Municipality MAPC Subregion(s) 2024 2025 2026 2027 2028 Request from MPO Currently Programmed?
2024 Acton S12122 Acton - Parking Management System Acton MAGIC $15,000         $15,000 No - Project previously programmed but dropped off FFY22-26 TIP.
2024 MassDOT 606496 Boston - Bridge Rehabilitation, B-16-052, Bowker Overpass over Mass Pike, MBTA/CSX, & Ipswich Street and Ramps (BINS 4FD, 4FG, 4FE, 4FF &4FJ) Boston ICC $59,000,000         $59,000,000 Yes, in TIP with State Highway Funds
2024 MBTA TBD Massachusetts Avenue Station Accessibility Improvements Boston ICC $35,400,000         $35,400,000 No - Project not in MBTA CIP
2024 MBTA TBD Jackson Square Station Accessibility Improvements Boston ICC $21,000,000         $21,000,000 No - Project not in MBTA CIP
2024 MBTA TBD Rail Transformation - Early Action Items: Reading Station Turn Track and Wilbur Interlocking Siding Improvements Reading, Woburn NSPC $11,200,000         $11,200,000 No - Project not in MBTA CIP
2024 MBTA TBD Columbus Avenue Bus Lane Phase 2 Boston ICC $9,400,000         $9,400,000 Yes, in TIP, but additional funding not in MBTA CIP.
2025 MassDOT 609532 Chelsea - Targeted Safety Improvements and Related Work on Broadway (Williams Street to City Hall Avenue) Chelsea ICC   $6,315,013       $6,315,013 Yes, in TIP with State Highway Funds.  The project was scored by MPO staff at 83/134 points.
2025 MassDOT 611982 Medford - Shared Use Path Connection at the Route 28/Wellington Underpass Medford ICC   $4,385,416       $4,385,416 Yes, in TIP with State Highway Funds
2025 MassDOT 610680 Natick - Lake Cochituate Path Natick MWRC   $3,296,494       $3,296,494 Yes, in TIP with State Highway Funds
2026 MassDOT 612523 Revere - State Road Beachmont Connector Revere ICC       $5,015,827   $5,015,827 Yes, in TIP with State Highway Funds
2026 MassDOT 611974 Medford - Intersection Improvements at Main Street/South Street, Main Street/Mystic Valley Parkway Ramps, and Main Street/Mystic Avenue Medford ICC     $7,870,500     $7,870,500 Yes, in TIP with State Highway Funds
2027 MassDOT 613121 Everett- Targeted Multi-Modal and Safety Improvements on Route 16 Everett ICC       $4,684,750   $4,684,750.00 No, not in TIP.
2027 MassDOT 612499 Medford - South Medford Connector Bike Path Medford ICC       $7,903,743   $7,903,743.00 Yes, in TIP with State Highway Funds
2028 MassDOT (on behalf of DCR) 613164 Boston-Milton- New Bridge and Shared Use Path Construction over Neponset River at Osceola Street Milton ICC/TRIC         $4,597,650 $4,597,650.00 No, not in TIP.
2026 MassDOT 612496 Somerville - Bridge Preservation, S-17-031, I-93 (NB &SB) from Route 28 to Temple Street (Phase 2) Somerville ICC     $175,000,000     $175,000,000.50 Yes, in TIP with State Highway Funds
2027 MassDOT 610660 Sudbury-Wayland - Mass Central Rail Trail (MCRT) Sudbury, Wayland MAGIC, MWRC       $4,061,413   $4,061,413 Yes, in TIP with State Highway Funds
2027 MassDOT 606728 Boston - Bridge Replacement B-16-365, Storrow Drive over Bowker Ramps Boston ICC       $120,000,000   $120,000,000 Yes, in TIP with State Highway Funds
Metropolitan Area Planning Council (MAPC) subregions: ICC = Inner Core Committee.  MAGIC = Minuteman Advisory Group on Interlocal Coordination.  MWRC = MetroWest Regional Collaborative.  NSPC = North Suburban Planning Council.  NSTF = North Shore Task Force.  SSC = South Shore Coalition.  SWAP = SouthWest Advisory Planning Committee.  TRIC = Three Rivers Interlocal Council.
Other abbreviations: MassDOT = Massachusetts Department of Transportation.  MBTA = Massachusetts Bay Transportation Authority.  DCR = Massachusetts Department of Conservation and Recreation.  BINS = Bridge Identification Numbers.  FFY = federal fiscal year.  N/A = not applicable.  NB = Northbound.  SB = Southbound.  

 

Scenario 4-Fiscal Sustainability

Proponent(s) TIP ID Project Name MassDOT District MAPC
Subregion
Evaluation Score Programmed Year(s) Design Status Current
 FFY 2024
Proposed
 FFY 2024
Current
FFY 2025
Proposed
 FFY 2025
Current
FFY 2026
Proposed  FFY 2026 Current
FFY 2027
Proposed
FFY 2027
Proposed
FFY 2028
Other Non-Target Funds Current Program Cost
 (FFYs 2023-28)
Cost Change Proposed Total Cost (all FYs)
Boston 606453 BOSTON- IMPROVEMENTS ON BOYLSTON STREET, FROM INTERSECTION OF BROOKLINE AVENUE & PARK DRIVE TO IPSWICH STREET 6 ICC 60 2023 25% Received R1 $8,665,052 $0 $0 $8,664,240 $0   $0     $0 $8,665,052 $812 $8,664,240
Littleton 609054 LITTLETON- RECONSTRUCTION OF FOSTER STREET 3 MAGIC 38 2024 100% Received $3,992,645 $5,164,375 $0   $0   $0     $0 $3,992,645 ($1,171,730) $5,164,375
Ashland 608436 ASHLAND- REHABILITATION AND RAIL CROSSING IMPROVEMENTS ON CHERRY STREET 3 MWRC 38 2024 25% Comments $1,222,315 $0 $0 $1,222,315 $0   $0     $0 $1,222,315 ($0) $1,222,315
Ipswich 605743 IPSWICH- RESURFACING & RELATED WORK ON CENTRAL & SOUTH MAIN STREETS 4 NSTF 48 2024 25% Received $5,490,888 $0 $0 $0 $0 $5,702,076 $0     $0 $5,490,888 ($211,188) $5,702,076
Peabody 609211 PEABODY- INDEPENDENCE GREENWAY EXTENSION 4 NSTF 34 2024 75% Received $3,922,122 $7,524,204 $0 $0 $0   $0     $0 $3,922,122 ($3,602,082) $7,524,204
Lynn 609252 LYNN- REHABILITATION OF ESSEX STREET 4 ICC 66 2024 Approved $17,602,000 $0 $0 $18,941,000 $0   $0     $0 $17,602,000 ($1,339,000) $18,941,000
MassDOT 608007 COHASSET- SCITUATE- CORRIDOR IMPROVEMENTS AND RELATED WORK ON JUSTICE CUSHING HIGHWAY (ROUTE 3A), FROM BEECHWOOD STREET TO HENRY TURNER BAILEY ROAD 5 SSC 37 2024 100% Complete $12,509,786 $15,496,957 $0   $0   $0     $0 $12,509,786 ($2,987,171) $15,496,957
MassDOT 603739 WRENTHAM- CONSTRUCTION OF ROUTE I-495/ROUTE 1A RAMPS 5 SWAP 55 2024 75% Comments $15,587,884 $20,117,638 $0   $0   $0     $0 $15,587,884 ($4,529,754) $20,117,638
MassDOT 110980 NEWTON- WESTON- BRIDGE REHABILITATION, N-12-010=W-29-005, COMMONWEALTH AVENUE (ROUTE 30) OVER THE CHARLES RIVER 6 ICC N/A 2024 25% Received $22,725,820 $21,851,750 $0   $0   $0     $0 $22,725,820 $874,070 $21,851,750
MassDOT 608067 WOBURN- INTERSECTION RECONSTRUCTION AT ROUTE 3 (CAMBRIDGE ROAD) & BEDFORD ROAD AND SOUTH BEDFORD STREET 4 NSPC 52 2025 Approved $0   $1,555,200 $1,902,000 $0   $0     $0 $1,555,200 ($346,800) $1,902,000
Peabody 610544 PEABODY- MULTI-USE PATH CONSTRUCTION OF INDEPENDENCE GREENWAY AT I-95 AND ROUTE 1 4 NSTF 53 2025 25% Received $0   $6,334,200 $15,170,319 $0   $0     $0 $6,334,200 ($8,836,119) $15,170,319
Woburn 610662 WOBURN- ROADWAY AND INTERSECTION IMPROVEMENTS AT WOBURN COMMON, ROUTE 38 (MAIN STREET), WINN STREET, PLEASANT STREET AND MONTVALE AVENUE 4 NSPC 75 2025 Approved $0   $15,530,400 $0 $0 $16,095,000 $0     $0 $15,530,400 ($564,600) $16,095,000
Everett 609257 EVERETT- RECONSTRUCTION OF BEACHAM STREET 4 ICC 54 2025 Approved $0   $10,168,416 $10,143,200 $0   $0     $0 $10,168,416 $25,216 $10,143,200
Hingham 605168 HINGHAM- IMPROVEMENTS ON ROUTE 3A FROM OTIS STREET/COLE ROAD  INCLUDING SUMMER STREET AND ROTARY; ROCKLAND STREET TO GEORGE WASHINGTON BOULEVARD.   5 SSC 57 2025 25% DPH $0   $15,596,550 $14,441,250 $0   $0     $0 $15,596,550 $1,155,300 $14,441,250
MassDOT 608045 MILFORD- REHABILITATION ON ROUTE 16, FROM ROUTE 109 TO BEAVER STREET 3 SWAP 50 2026 25% Comments $0   $0   $10,119,616 $9,035,371 $0     $0 $10,119,616 $1,084,245 $9,035,371
Belmont 609204 BELMONT- COMMUNITY PATH, BELMONT COMPONENT OF THE MCRT (PHASE I) 4 ICC 64.6 2026 25% Received $0   $0   $21,034,382 $19,711,298 $0     $0 $21,034,382 $1,323,084 $19,711,298
Salem 609437 SALEM- PEABODY- BOSTON STREET IMPROVEMENTS 4 NSTF 67.8 2026 25% DPH $0   $0   $13,977,600 $13,123,026 $0     $0 $13,977,600 $854,574 $13,123,026
Weston 608940 WESTON- INTERSECTION IMPROVEMENTS BOSTON POST ROAD (ROUTE 20) AT WELLESLEY STREET  6 MWRC 50.6 2026 25% Received R1 $0   $0   $2,681,330 $2,023,429 $0     $0 $2,681,330 $657,901 $2,023,429
Weston 608954 WESTON- RECONSTRUCTION ON ROUTE 30 6 MWRC 49.2 2026 25% DPH $0   $0   $17,028,272 $15,203,814 $0     $0 $17,028,272 $1,824,458 $15,203,814
Swampscott 610666 SWAMPSCOTT- RAIL TRAIL CONSTRUCTION 4 NSTF 66.4 2027 Approved $0   $0   $0   $8,932,000 $0 $8,624,000 $0 $8,932,000 $308,000 $8,624,000
MassDOT 607981 SOMERVILLE- MCGRATH BOULEVARD CONSTRUCTION 4 ICC 72.2 2027 Approved $0   $0   $0   $20,000,000 $35,000,000 $30,000,000 $0 $20,000,000 ########### $65,000,000
Lynn 609246 LYNN- REHABILITATION OF WESTERN AVENUE (ROUTE 107) 4 ICC 74.9 2027 Approved $0   $0   $0   $15,000,000 $15,000,000 $20,000,000 $0 $15,000,000 ########### $35,000,000
Brookline 610932 BROOKLINE- REHABILITATION OF WASHINGTON STREET 6 ICC 62.4 2027 Approved $0   $0   $0   $30,030,812 $28,995,267   $0 $30,030,812 $1,035,545 $28,995,267
Chelsea 611983 CHELSEA- PARK STREET & PEARL STREET RECONSTRUCTION 6 ICC 69.9 2027 Approved $0   $0   $0   $12,123,769 $11,705,708   $0 $12,123,769 $418,061 $11,705,708
Newton S12125 NEWTON MICROTRANSIT SERVICE 4 ICC 53 2021-2023 N/A $0   $0   $0   $0     $0 $152,000 $0 $152,000
MWRTA S12701 MWRTA CATCHCONNECT MICROTRANSIT SERVICE EXPANSION 3 MWRC 59 2023-2025 N/A $149,425 $149,425 $159,488 $159,488 $0   $0     $0 $450,163 $0 $450,163
MART S12703 MONTACHUSETT RTA MICROTRANSIT SERVICE 3 MAGIC 57 2023-2025 N/A $430,354 $430,354 $406,641 $406,641 $0   $0     $0 $1,316,061 $0 $1,316,061
Stoneham S12699 STONEHAM SHUTTLE SERVICE 4 NSPC 72 2023-2025 N/A $261,439 $261,439 $205,189 $205,189 $0   $0     $0 $796,817 $0 $796,817
CATA S12700 CATA ON DEMAND MICROTRANSIT SERVICE EXPANSION 4 NSTF 61.75 2023-2025 N/A $265,065 $265,065 $214,776 $214,776 $0   $0     $0 $813,291 $0 $813,291
Newton S12694 NEWMO MICROTRANSIT SERVICE EXPANSION 6 ICC 87 2023-2025 N/A $268,246 $268,246 $209,663 $209,663 $0   $0     $0 $890,574 $0 $890,574
Watertown S12697 PLEASANT STREET SHUTTLE SERVICE EXPANSION 6 ICC 78 2023-2025 N/A $335,434 $335,434 $228,939 $228,939 $0   $0     $0 $1,002,198 $0 $1,002,198
Watertown 607777 WATERTOWN- REHABILITATION OF MOUNT AUBURN STREET (ROUTE 16) 6 ICC 75 2023-24 75% Received $2,841,078 $3,494,249 $0 $0 $0   $0     $0 $27,246,174 ($653,171) $27,899,345
Canton S12114 ROYALL STREET SHUTTLE 6 TRIC 51 2023-24 N/A $148,542 $148,542 $0 $0 $0   $0     $0 $325,719 $0 $325,719
Boston 606226 BOSTON- RECONSTRUCTION OF RUTHERFORD AVENUE, FROM CITY SQUARE TO SULLIVAN SQUARE 6 ICC 59 2028 25% Received R1 $0 $0 $32,783,959 $0 $33,500,000 $0 $33,500,000 $0 $33,500,000 $0 $99,783,959 $66,283,959 $33,500,000
MassDOT 608051 WILMINGTON- RECONSTRUCTION ON ROUTE 38 (MAIN STREET), FROM ROUTE 62 TO THE WOBURN C.L. 4 NSPC 59 2025-26 75% Comments $0 $0 $24,644,177 $22,818,682 $0 $0 $0 $0   $0 $24,644,177 $1,825,495 $22,818,682
Norwood 605857 NORWOOD- INTERSECTION IMPROVEMENTS @ ROUTE 1 & UNIVERSITY AVENUE/EVERETT STREET  5 TRIC 55 2026 25% Received R1 $0 $0 $9,000,000 $0 $15,837,870 $9,000,000 $0 $17,573,400   $0 $24,837,870 ($1,735,530) $26,573,400
Regionwide S12113 TRANSIT MODERNIZATION PROGRAM Regionwide Regionwide N/A 2025-2028 Administrative $0 $0 $6,500,000 $3,500,000 $6,500,000 $6,500,000 $6,500,000 $6,500,000 $6,500,000 $0 $19,500,000 ($3,500,000) $23,000,000
Regionwide S12124 COMMUNITY CONNECTIONS PROGRAM Regionwide Regionwide N/A 2025-28 N/A $641,495 $0 $1,075,304 $1,075,304 $2,500,000 $2,500,000 $2,500,000 $2,500,000 $2,500,000 $0 $6,716,799 ($1,858,505) $8,575,304
MWRTA S12807 CatchConnect MicroTransit Expansion Phase 2 Regionwide MWRC 90 2024-27 N/A $0 $140,000 $0 $132,500 $0 $107,977 $0     $0 $0 ($380,477) $380,477
Lynn S12802 Broad Street Corridor TSP 4 ICC 88 2024 N/A $0 $297,800 $0   $0   $0     $0 $0 ($297,800) $297,800
Medford S12803 Medford Bicycle Parking (Tier 1) 4 ICC 84 2024 N/A $0 $29,600 $0   $0   $0     $0 $0 ($29,600) $29,600
Medford S12804 Medford BlueBikes Expansion 4 ICC 78 2024 N/A $0 $118,643 $0   $0   $0     $0 $0 ($118,643) $118,643
Canton S12806 Canton Center Bicycle Racks 6 TRIC 72 2024 N/A $0 $10,000 $0   $0   $0     $0 $0 ($10,000) $10,000
Canton S12805 Canton Public Schools Bike Program 6 TRIC 38 2024 N/A $0 $22,500 $0   $0   $0     $0 $0 ($22,500) $22,500
MBTA S12705 LYNN STATION IMPROVEMENTS PHASE II 4 ICC N/A 2023-2024 N/A $13,600,000 $13,600,000 $0   $0   $0     $0 $48,100,000 $0 $48,100,000
MBTA S12706 FOREST HILLS IMPROVEMENT PROJECT 6 ICC N/A REMOVED N/A $6,400,000 $0 $0   $0   $0     $0 $6,400,000 $0 $6,400,000
Natick 610691 COCHITUATE RAIL TRAIL EXTENSION (MBTA STATION TO MECHANIC STREET) - NATICK CENTER CONNECTION 3 MWRC 67 2028 25% Received $0 $0 $0   $0   $0   $6,690,043 $0 $0 ($6,690,043) $6,690,043
Westwood 608158 WESTWOOD- NORWOOD- RECONSTRUCTION OF CANTON STREET TO UNIVERSITY DRIVE, INCLUDING REHAB OF N-25-032=W-31-018 6 TRIC 53.3 2028 25% Received $0 $0 $0   $0   $0   $19,047,306 $0   ########### $19,047,306
Wakefield 613145 WAKEFIELD- COMPREHENSIVE DOWNTOWN TRANSPORTATION IMPROVEMENT PROJECT 4 NSPC 61.8 2028 Approved $0 $0 $0   $0   $0   $16,581,200 $0 $0 ########### $16,581,200
Malden 613088 MALDEN- SPOT POND BROOK GREENWAY 4 ICC 73 2027 Approved $0 $0 $0   $0   $0 $4,337,613 $0 $0 $0 ($4,337,613) $4,337,613
Boston 612989 BOSTON- BRIDGE PRESERVATION, B-16-066 (38D), CAMBRIDGE STREET OVER MBTA 6 ICC 53.1 2026 Approved $0 $0 $0   $0 $15,400,000 $0   $0 $0 $0 ########### $15,400,000
Acton S12122 ACTON PARKING MANAGEMENT SYSTEM 3 MAGIC 29 2024 Approved $0 $15,000 $0   $0   $0     $0 $0 ($15,000) $15,000
MBTA TBD JACKSON SQUARE STATION ACCESSIBILITY IMPROVEMENTS N/A ICC N/A 2024-2025 N/A $0 $8,000,000 $0 $13,000,000 $0   $0   $0 $0 $0 ########### $21,000,000
MBTA TBD RAIL TRANSFORMATION - EARLY ACTION ITEMS - READING STATION AND WILBUR INTERLOCKING N/A NSPC N/A 2024 N/A $0 $11,200,000 $0 $0 $0   $0   $0 $0 $0 ########### $11,200,000
MBTA TBD COLUMBUS AVE BUS LANE PHASE II N/A ICC N/A 2024 N/A $0 $9,400,000 $0   $0   $0   $0 $0 $0 ($9,400,000) $9,400,000
CTPS TBD BikeShare State of Good Repair Set-Aside Regionwide Regionwide N/A 2025-2028 Administrative $0 $0 $0 $2,500,000 $0 $1,000,000 $0 $1,000,000 $1,000,000 $0 $0 ($5,500,000) $5,500,000
CTPS TBD Project Design Support Pilot (FFY 2025) Regionwide Regionwide N/A 2025 Administrative $0 $0 $0 $1,500,000 $0 $0 $0   $0 $0 $0 ($1,500,000) $1,500,000
Projects in red text were identified as being high risk for not meeting their advertisement date at February 2023 TIP readiness meeting.   2024 2025 2026 2027 2028 2024-28 Total
*Projects with an asterisk were identified as candidates to remain in current year if near-term issue resolution occurs. Total Available Regional Highway Target Funds (2024-28 TIP): $130,647,095 $128,427,689 $125,285,687 $155,132,142 ########### ###########
Indicates an increase in project cost (> $500,000 or 20% of project cost)
Indicates a project was recommended to move out to a later TIP year   Current Proposed Current Proposed Current Proposed Current Proposed Proposed Proposed
Indicates a project was recommended to move into an earlier TIP year Draft Total Programmed Regional Highway Target Funds: $117,059,590 $118,341,220 $124,612,902 $116,435,507 $123,179,070 $115,401,990 $128,586,581 $122,611,988 $144,442,549 $617,233,254
Indicates a project is proposed to be newly added to the TIP Regional Highway Target Funds Remaining (Unprogrammed): $13,587,505 $12,305,875 $3,814,787 $11,992,182 $2,106,617 $9,883,697 $26,545,561 $32,520,154 $13,609,626 $80,311,534
Indicates a project that is proposed to be newly added to the TIP and for which a project application was received by the MPO. Percent Unprogrammed 10.4% 9.4% 3.0% 9.3% 1.7% 7.9% 17.1% 21.0% 8.6% 11.5%
Indicates a project that has seen significant adjustment or is new to scenarios from the March 16th MPO Board Meeting.                            
                           
                           
Abbreviations                            
TIP Investment programs: BP = Bicycle and Pedestrian.  CC = Community Connections.  CS = Complete Streets.  II = Intersection Improvements.  MI = Major Infrastructure. 
TM = Transit Modernization
                       
                           
Metropolitan Area Planning Council (MAPC) subregions: ICC = Inner Core Committee.  MAGIC = Minuteman Advisory Group on Interlocal Coordination.  MWRC = MetroWest Regional Collaborative.  NSPC = North Suburban Planning Council.  NSTF = North Shore Task Force.  SSC = South Shore Coalition.  SWAP = SouthWest Advisory Planning Committee.  TRIC = Three Rivers Interlocal Council.                        
                           
Other abbreviations: MassDOT = Massachusetts Department of Transportation.  DPH = design public hearing.  FFY = federal fiscal year.  N/A = not applicable.  PRC = MassDOT's Project Review Committee.  PS&E = Plans, Specifications, and EStimates.  R1 = resubmission.  TRD = TIP Readiness Days. NewMo = Newton in Motion.  MassDOT = Massachusetts Department of Transportation.                        

 

Scenario 5-Performance

Proponent(s) TIP ID Project Name MassDOT District MAPC
Subregion
Evaluation Score Programmed Year(s) Design Status Current
 FFY 2024
Proposed
 FFY 2024
Current
FFY 2025
Proposed
 FFY 2025
Current
FFY 2026
Proposed  FFY 2026 Current
FFY 2027
Proposed
FFY 2027
Proposed
FFY 2028
Other Non-Target Funds Current Program Cost
 (FFYs 2023-28)
Cost Change Proposed Total Cost (all FYs)
Boston 606453 BOSTON- IMPROVEMENTS ON BOYLSTON STREET, FROM INTERSECTION OF BROOKLINE AVENUE & PARK DRIVE TO IPSWICH STREET 6 ICC 60 2023 25% Received R1 $8,665,052 $0 $0 $8,664,240 $0   $0     $0 $8,665,052 $812 $8,664,240
Littleton 609054 LITTLETON- RECONSTRUCTION OF FOSTER STREET 3 MAGIC 38 2024 100% Received $3,992,645 $5,164,375 $0   $0   $0     $0 $3,992,645 ($1,171,730) $5,164,375
Ashland 608436 ASHLAND- REHABILITATION AND RAIL CROSSING IMPROVEMENTS ON CHERRY STREET 3 MWRC 38 2024 25% Comments $1,222,315 $0 $0 $1,222,315 $0   $0     $0 $1,222,315 ($0) $1,222,315
Ipswich 605743 IPSWICH- RESURFACING & RELATED WORK ON CENTRAL & SOUTH MAIN STREETS 4 NSTF 48 2024 25% Received $5,490,888 $0 $0 $0 $0 $5,702,076 $0     $0 $5,490,888 ($211,188) $5,702,076
Peabody 609211 PEABODY- INDEPENDENCE GREENWAY EXTENSION 4 NSTF 34 2024 75% Received $3,922,122 $7,524,204 $0 $0 $0   $0     $0 $3,922,122 ($3,602,082) $7,524,204
Lynn 609252 LYNN- REHABILITATION OF ESSEX STREET 4 ICC 66 2024 Approved $17,602,000 $0 $0 $18,941,000 $0   $0     $0 $17,602,000 ($1,339,000) $18,941,000
MassDOT 608007 COHASSET- SCITUATE- CORRIDOR IMPROVEMENTS AND RELATED WORK ON JUSTICE CUSHING HIGHWAY (ROUTE 3A), FROM BEECHWOOD STREET TO HENRY TURNER BAILEY ROAD 5 SSC 37 2024 100% Complete $12,509,786 $15,496,957 $0   $0   $0     $0 $12,509,786 ($2,987,171) $15,496,957
MassDOT 603739 WRENTHAM- CONSTRUCTION OF ROUTE I-495/ROUTE 1A RAMPS 5 SWAP 55 2024 75% Comments $15,587,884 $20,117,638 $0   $0   $0     $0 $15,587,884 ($4,529,754) $20,117,638
MassDOT 110980 NEWTON- WESTON- BRIDGE REHABILITATION, N-12-010=W-29-005, COMMONWEALTH AVENUE (ROUTE 30) OVER THE CHARLES RIVER 6 ICC N/A 2024 25% Received $22,725,820 $21,851,750 $0   $0   $0     $0 $22,725,820 $874,070 $21,851,750
MassDOT 608067 WOBURN- INTERSECTION RECONSTRUCTION AT ROUTE 3 (CAMBRIDGE ROAD) & BEDFORD ROAD AND SOUTH BEDFORD STREET 4 NSPC 52 2025 Approved $0   $1,555,200 $1,902,000 $0   $0     $0 $1,555,200 ($346,800) $1,902,000
Peabody 610544 PEABODY- MULTI-USE PATH CONSTRUCTION OF INDEPENDENCE GREENWAY AT I-95 AND ROUTE 1 4 NSTF 53 2025 25% Received $0   $6,334,200 $15,170,319 $0   $0     $0 $6,334,200 ($8,836,119) $15,170,319
Woburn 610662 WOBURN- ROADWAY AND INTERSECTION IMPROVEMENTS AT WOBURN COMMON, ROUTE 38 (MAIN STREET), WINN STREET, PLEASANT STREET AND MONTVALE AVENUE 4 NSPC 75 2025 Approved $0   $15,530,400 $0 $0 $16,095,000 $0     $0 $15,530,400 ($564,600) $16,095,000
Everett 609257 EVERETT- RECONSTRUCTION OF BEACHAM STREET 4 ICC 54 2025 Approved $0   $10,168,416 $10,143,200 $0   $0     $0 $10,168,416 $25,216 $10,143,200
Hingham 605168 HINGHAM- IMPROVEMENTS ON ROUTE 3A FROM OTIS STREET/COLE ROAD  INCLUDING SUMMER STREET AND ROTARY; ROCKLAND STREET TO GEORGE WASHINGTON BOULEVARD.   5 SSC 57 2025 25% DPH $0   $15,596,550 $14,441,250 $0   $0     $0 $15,596,550 $1,155,300 $14,441,250
MassDOT 608045 MILFORD- REHABILITATION ON ROUTE 16, FROM ROUTE 109 TO BEAVER STREET 3 SWAP 50 2026 25% Comments $0   $0   $10,119,616 $9,035,371 $0     $0 $10,119,616 $1,084,245 $9,035,371
Belmont 609204 BELMONT- COMMUNITY PATH, BELMONT COMPONENT OF THE MCRT (PHASE I) 4 ICC 64.6 2026 25% Received $0   $0   $21,034,382 $19,711,298 $0     $0 $21,034,382 $1,323,084 $19,711,298
Salem 609437 SALEM- PEABODY- BOSTON STREET IMPROVEMENTS 4 NSTF 67.8 2026 25% DPH $0   $0   $13,977,600 $13,123,026 $0     $0 $13,977,600 $854,574 $13,123,026
Weston 608940 WESTON- INTERSECTION IMPROVEMENTS BOSTON POST ROAD (ROUTE 20) AT WELLESLEY STREET  6 MWRC 50.6 2026 25% Received R1 $0   $0   $2,681,330 $2,023,429 $0     $0 $2,681,330 $657,901 $2,023,429
Weston 608954 WESTON- RECONSTRUCTION ON ROUTE 30 6 MWRC 49.2 2026 25% DPH $0   $0   $17,028,272 $15,203,814 $0     $0 $17,028,272 $1,824,458 $15,203,814
Swampscott 610666 SWAMPSCOTT- RAIL TRAIL CONSTRUCTION 4 NSTF 66.4 2027 Approved $0   $0   $0   $8,932,000 $0 $8,624,000 $0 $8,932,000 $308,000 $8,624,000
MassDOT 607981 SOMERVILLE- MCGRATH BOULEVARD CONSTRUCTION 4 ICC 72.2 2027 Approved $0   $0   $0   $20,000,000 $35,000,000 $30,000,000 $0 $20,000,000 ########### $65,000,000
Lynn 609246 LYNN- REHABILITATION OF WESTERN AVENUE (ROUTE 107) 4 ICC 74.9 2027 Approved $0   $0   $0   $15,000,000 $15,000,000 $20,000,000 $0 $15,000,000 ########### $35,000,000
Brookline 610932 BROOKLINE- REHABILITATION OF WASHINGTON STREET 6 ICC 62.4 2027 Approved $0   $0   $0   $30,030,812 $25,888,631   $0 $30,030,812 $4,142,181 $25,888,631
Chelsea 611983 CHELSEA- PARK STREET & PEARL STREET RECONSTRUCTION 6 ICC 69.9 2027 Approved $0   $0   $0   $12,123,769 $11,705,708   $0 $12,123,769 $418,061 $11,705,708
Newton S12125 NEWTON MICROTRANSIT SERVICE 4 ICC 53 2021-2023 N/A $0   $0   $0   $0     $0 $152,000 $0 $152,000
MWRTA S12701 MWRTA CATCHCONNECT MICROTRANSIT SERVICE EXPANSION 3 MWRC 59 2023-2025 N/A $149,425 $149,425 $159,488 $159,488 $0   $0     $0 $450,163 $0 $450,163
MART S12703 MONTACHUSETT RTA MICROTRANSIT SERVICE 3 MAGIC 57 2023-2025 N/A $430,354 $430,354 $406,641 $406,641 $0   $0     $0 $1,316,061 $0 $1,316,061
Stoneham S12699 STONEHAM SHUTTLE SERVICE 4 NSPC 72 2023-2025 N/A $261,439 $261,439 $205,189 $205,189 $0   $0     $0 $796,817 $0 $796,817
CATA S12700 CATA ON DEMAND MICROTRANSIT SERVICE EXPANSION 4 NSTF 61.75 2023-2025 N/A $265,065 $265,065 $214,776 $214,776 $0   $0     $0 $813,291 $0 $813,291
Newton S12694 NEWMO MICROTRANSIT SERVICE EXPANSION 6 ICC 87 2023-2025 N/A $268,246 $268,246 $209,663 $209,663 $0   $0     $0 $890,574 $0 $890,574
Watertown S12697 PLEASANT STREET SHUTTLE SERVICE EXPANSION 6 ICC 78 2023-2025 N/A $335,434 $335,434 $228,939 $228,939 $0   $0     $0 $1,002,198 $0 $1,002,198
Watertown 607777 WATERTOWN- REHABILITATION OF MOUNT AUBURN STREET (ROUTE 16) 6 ICC 75 2023-24 75% Received $2,841,078 $3,494,249 $0 $0 $0   $0     $0 $27,246,174 ($653,171) $27,899,345
Canton S12114 ROYALL STREET SHUTTLE 6 TRIC 51 2023-24 N/A $148,542 $148,542 $0 $0 $0   $0     $0 $325,719 $0 $325,719
Boston 606226 BOSTON- RECONSTRUCTION OF RUTHERFORD AVENUE, FROM CITY SQUARE TO SULLIVAN SQUARE 6 ICC 59 2028 25% Received R1 $0 $0 $32,783,959 $0 $33,500,000 $0 $33,500,000 $0 $33,500,000 $0 $99,783,959 $66,283,959 $33,500,000
MassDOT 608051 WILMINGTON- RECONSTRUCTION ON ROUTE 38 (MAIN STREET), FROM ROUTE 62 TO THE WOBURN C.L. 4 NSPC 59 2025-26 75% Comments $0 $0 $24,644,177 $22,818,682 $0 $0 $0 $0   $0 $24,644,177 $1,825,495 $22,818,682
Norwood 605857 NORWOOD- INTERSECTION IMPROVEMENTS @ ROUTE 1 & UNIVERSITY AVENUE/EVERETT STREET  5 TRIC 55 2026 25% Received R1 $0 $0 $9,000,000 $0 $15,837,870 $9,000,000 $0 $17,573,400   $0 $24,837,870 ($1,735,530) $26,573,400
Regionwide S12113 TRANSIT MODERNIZATION PROGRAM Regionwide Regionwide N/A 2025-2028 Administrative $0 $0 $6,500,000 $6,500,000 $6,500,000 $6,500,000 $6,500,000 $6,500,000 $6,500,000 $0 $19,500,000 ($6,500,000) $26,000,000
Regionwide S12124 COMMUNITY CONNECTIONS PROGRAM Regionwide Regionwide N/A 2025-28 N/A $641,495 $0 $1,075,304 $1,075,304 $2,500,000 $2,500,000 $2,500,000 $2,500,000 $2,500,000 $0 $6,716,799 ($1,858,505) $8,575,304
MWRTA S12807 CatchConnect MicroTransit Expansion Phase 2 Regionwide MWRC 90 2024-27 N/A $0 $140,000 $0 $132,500 $0 $107,977 $0     $0 $0 ($380,477) $380,477
Lynn S12802 Broad Street Corridor TSP 4 ICC 88 2024 N/A $0 $297,800 $0   $0   $0     $0 $0 ($297,800) $297,800
Medford S12803 Medford Bicycle Parking (Tier 1) 4 ICC 84 2024 N/A $0 $29,600 $0   $0   $0     $0 $0 ($29,600) $29,600
Medford S12804 Medford BlueBikes Expansion 4 ICC 78 2024 N/A $0 $118,643 $0   $0   $0     $0 $0 ($118,643) $118,643
Canton S12806 Canton Center Bicycle Racks 6 TRIC 72 2024 N/A $0 $10,000 $0   $0   $0     $0 $0 ($10,000) $10,000
Canton S12805 Canton Public Schools Bike Program 6 TRIC 38 2024 N/A $0 $22,500 $0   $0   $0     $0 $0 ($22,500) $22,500
Boston S12808 BOSTON ELECTRIC BLUEBIKES ADOPTION 6 ICC 84 2024 N/A $0 $1,020,000 $0   $0   $0     $0 $0 ($1,020,000) $1,020,000
Cambridge S12809 CAMBRIDGE ELECTRIC BLUEBIKES ADOPTION 6 ICC 81 2024 N/A $0 $352,575 $0   $0   $0     $0 $0 ($352,575) $352,575
MBTA S12705 LYNN STATION IMPROVEMENTS PHASE II 4 ICC N/A 2023-2024 N/A $13,600,000 $13,600,000 $0   $0   $0     $0 $48,100,000 $0 $48,100,000
MBTA S12706 FOREST HILLS IMPROVEMENT PROJECT 6 ICC N/A REMOVED N/A $6,400,000 $0 $0   $0   $0     $0 $6,400,000 $0 $6,400,000
Natick 610691 COCHITUATE RAIL TRAIL EXTENSION (MBTA STATION TO MECHANIC STREET) - NATICK CENTER CONNECTION 3 MWRC 67 2028 25% Received $0 $0 $0   $0   $0   $6,690,043 $0 $0 ($6,690,043) $6,690,043
Westwood 608158 WESTWOOD- NORWOOD- RECONSTRUCTION OF CANTON STREET TO UNIVERSITY DRIVE, INCLUDING REHAB OF N-25-032=W-31-018 6 TRIC 53.3 2028 25% Received $0 $0 $0   $0   $0   $19,047,306 $0 $0 ########### $19,047,306
Wakefield 613145 WAKEFIELD- COMPREHENSIVE DOWNTOWN TRANSPORTATION IMPROVEMENT PROJECT 4 NSPC 61.8 2028 Approved $0 $0 $0   $0   $0   $16,581,200 $0 $0 ########### $16,581,200
Malden 613088 MALDEN- SPOT POND BROOK GREENWAY 4 ICC 73 2027 Approved $0 $0 $0   $0   $0 $4,337,613 $0 $0 $0 ($4,337,613) $4,337,613
Boston 612989 BOSTON- BRIDGE PRESERVATION, B-16-066 (38D), CAMBRIDGE STREET OVER MBTA 6 ICC 53.1 2026 Approved $0 $0 $0   $0 $15,400,000 $0   $0 $0 $0 ########### $15,400,000
Acton S12122 ACTON PARKING MANAGEMENT SYSTEM 3 MAGIC 29 2024 Approved $0 $15,000 $0   $0   $0   $0 $0 $0 ($15,000) $15,000
MassDOT 613121 EVERETT- TARGETED MULTI-MODAL AND SAFETY IMPROVEMENTS ON ROUTE 16 4 ICC N/A 2027 Approved $0   $0   $0   $0 $4,684,750 $0 $0 $0 ($4,684,750) $4,684,750
MassDOT 609532 CHELSEA- TARGETED SAFETY IMPROVEMENTS AND RELATED WORK ON BROADWAY, FROM WILLIAMS STREET TO CITY HALL AVENUE 4 ICC N/A 2025 25% Received $0   $0 $6,315,013 $0   $0   $0 $6,557,898 $6,557,898 ($6,315,013) $12,872,911
MassDOT 606728 BOSTON- BRIDGE REPLACEMENT B-16-365-STORROW DRIVE OVER BOWKER RAMPS 4 ICC N/A 2027 Approved $0 $0 $0 $0 $0 $0 $0 $15,000,000 $0 $116,058,000 $116,058,000 ########### $131,058,000
MBTA TBD JACKSON SQUARE STATION ACCESSIBILITY IMPROVEMENTS N/A ICC N/A 2024 N/A $0 $11,000,000 $0 $10,000,000 $0   $0   $0 $0 $0 ########### $21,000,000
MBTA TBD RAIL TRANSFORMATION - EARLY ACTION ITEMS - READING STATION AND WILBUR INTERLOCKING N/A NSPC N/A 2024 N/A $0 $11,200,000 $0 $0 $0   $0   $0 $0 $0 ########### $11,200,000
MBTA TBD COLUMBUS AVE BUS LANE PHASE II N/A ICC N/A 2024 N/A $0 $9,400,000 $0   $0   $0   $0 $0 $0 ($9,400,000) $9,400,000
CTPS TBD BikeShare State of Good Repair Set-Aside Regionwide Regionwide N/A 2025-2028 Administrative $0 $0 $0 $1,000,000 $0 $1,000,000 $0 $2,000,000 $2,000,000 $0 $0 ($6,000,000) $6,000,000
CTPS TBD Project Design Support Pilot (FFY 2025) Regionwide Regionwide N/A 2025 Administrative $0 $0 $0 $1,500,000 $0 $0 $0   $0 $0 $0 ($1,500,000) $1,500,000
Projects in red text were identified as being high risk for not meeting their advertisement date at February 2023 TIP readiness meeting.   2024 2025 2026 2027 2028 2024-28 Total
*Projects with an asterisk were identified as candidates to remain in current year if near-term issue resolution occurs. Total Available Regional Highway Target Funds (2024-28 TIP): $130,647,095 $128,427,689 $125,285,687 $155,132,142 ########### ###########
Indicates an increase in project cost (> $500,000 or 20% of project cost)
Indicates a project was recommended to move out to a later TIP year   Current Proposed Current Proposed Current Proposed Current Proposed Proposed Proposed
Indicates a project was recommended to move into an earlier TIP year Draft Total Programmed Regional Highway Target Funds: $117,059,590 $122,713,795 $124,612,902 $121,250,520 $123,179,070 $115,401,990 $128,586,581 $140,190,102 $145,442,549 $644,998,957
Indicates a project is proposed to be newly added to the TIP Regional Highway Target Funds Remaining (Unprogrammed): $13,587,505 $7,933,300 $3,814,787 $7,177,169 $2,106,617 $9,883,697 $26,545,561 $14,942,040 $12,609,626 $52,545,831
Indicates a project that is proposed to be newly added to the TIP and for which a project application was received by the MPO. Percent Unprogrammed 10.4% 6.1% 3.0% 5.6% 1.7% 7.9% 17.1% 9.6% 8.0% 7.5%
Indicates a project that has seen significant adjustment or is new to scenarios from the March 16th MPO Board Meeting.                            
                   
                           
Abbreviations                            
TIP Investment programs: BP = Bicycle and Pedestrian.  CC = Community Connections.  CS = Complete Streets.  II = Intersection Improvements.  MI = Major Infrastructure. 
TM = Transit Modernization
                       
                           
Metropolitan Area Planning Council (MAPC) subregions: ICC = Inner Core Committee.  MAGIC = Minuteman Advisory Group on Interlocal Coordination.  MWRC = MetroWest Regional Collaborative.  NSPC = North Suburban Planning Council.  NSTF = North Shore Task Force.  SSC = South Shore Coalition.  SWAP = SouthWest Advisory Planning Committee.  TRIC = Three Rivers Interlocal Council.                    
                       
Other abbreviations: MassDOT = Massachusetts Department of Transportation.  DPH = design public hearing.  FFY = federal fiscal year.  N/A = not applicable.  PRC = MassDOT's Project Review Committee.  PS&E = Plans, Specifications, and EStimates.  R1 = resubmission.  TRD = TIP Readiness Days. NewMo = Newton in Motion.  MassDOT = Massachusetts Department of Transportation.                

 

Scenario 1 - Project Readiness (backup)

Proponent(s) TIP ID Project Name MassDOT District Investment Category MAPC
Subregion
Evaluation Score Programmed Year(s) Design Status Current
 FFY 2023
Proposed
 FFY 2023
Current
 FFY 2024
Proposed
 FFY 2024
Current
FFY 2025
Proposed
 FFY 2025
Current
FFY 2026
Proposed  FFY 2026 Current
FFY 2027
Proposed
FFY 2027
Proposed
FFY 2028
Other Non-Target Funds Current Program Cost
 (FFYs 2023-28)
Cost Change Proposed Total Cost (all FYs)
Acton S12702 BICYCLE PARKING ALONG THE BRUCE FREEMAN RAIL TRAIL 3 CC MAGIC 58 2023 N/A $8,017 $8,017 $0   $0   $0   $0     $0 $8,017 $0 $8,017
Framingham 608889 FRAMINGHAM- TRAFFIC SIGNAL INSTALLATION AT EDGELL ROAD AT CENTRAL STREET 3 II MWRC 41 2023 PSE $2,484,704 $2,576,265 $0   $0   $0   $0     $0 $2,484,704 ($91,561) $2,576,265
Wilmington 609253 WILMINGTON- INTERSECTION IMPROVEMENTS AT LOWELL STREET (ROUTE 129) AND WOBURN STREET 4 II NSPC 53 2023 Final $6,441,358 $7,031,311 $0   $0   $0   $0     $0 $6,441,358 ($589,953) $7,031,311
Peabody 608933 PEABODY- REHABILITATION OF CENTRAL STREET 4 CS NSTF 61 2023 75% $15,219,860 $15,396,888 $0   $0   $0   $0     $0 $15,219,860 ($177,028) $15,396,888
Beverly 608348 BEVERLY- RECONSTRUCTION OF BRIDGE STREET 4 CS NSTF 66 2023 75% $8,839,401 $9,590,507 $0   $0   $0   $0     $3,755,531 $12,594,932 ($751,106) $13,346,038
Medford S12696 BLUEBIKES SYSTEM EXPANSION 4 CC ICC 78 2023 0% $145,821 $145,821 $0   $0   $0   $0     $0 $145,821 $0 $145,821
Salem S12698 BLUEBIKES SYSTEM EXPANSION 4 CC NSTF 77 2023 0% $119,629 $119,629 $0   $0   $0   $0     $0 $119,629 $0 $119,629
Belmont S12704 CHENERY MIDDLE SCHOOL BICYCLE PARKING 4 CC ICC 49.75 2023 0% $8,289 $8,289 $0   $0   $0   $0     $0 $8,289 $0 $8,289
Norwood 606130 NORWOOD- INTERSECTION IMPROVEMENTS AT ROUTE 1A & UPLAND ROAD/WASHINGTON STREET & PROSPECT STREET/FULTON STREET 5 II TRIC 47 2023 PS&E $7,952,280 $8,313,713 $0   $0   $0   $0     $0 $7,952,280 ($361,433) $8,313,713
Dedham 607899 DEDHAM- PEDESTRIAN IMPROVEMENTS ALONG BUSSEY STREET, INCLUDING SUPERSTRUCTURE REPLACEMENT, D-05-010, BUSSEY STREET OVER MOTHER BROOK 6 CS TRIC 35 2023 Final $6,130,676 $6,130,676 $0   $0   $0   $0     $2,165,266 $8,295,942 $0 $8,295,942
Winthrop 607244 WINTHROP- RECONSTRUCTION & RELATED WORK ALONG WINTHROP STREET & REVERE STREET CORRIDOR 6 CS ICC 54 2023 75% $6,779,797 $6,966,825 $0   $0   $0   $0     $0 $6,779,797 ($187,028) $6,966,825
Boston 606453 BOSTON- IMPROVEMENTS ON BOYLSTON STREET, FROM INTERSECTION OF BROOKLINE AVENUE & PARK DRIVE TO IPSWICH STREET 6 CS ICC 60 2023 25% $0 $0 $8,665,052 $0 $0 $8,665,052 $0   $0     $0 $8,665,052 $0 $8,665,052
Quincy 608707 QUINCY- RECONSTRUCTION OF SEA STREET 6 CS ICC 40 2023 100% $12,166,638 $12,574,637 $0   $0   $0   $0     $0 $12,166,638 ($407,999) $12,574,637
Cambridge S12695 BLUEBIKES STATION REPLACEMENT AND SYSTEM EXPANSION 6 CC ICC 78 2023 0% $349,608 $349,608 $0   $0   $0   $0     $0 $349,608 $0 $349,608
Littleton 609054 LITTLETON- RECONSTRUCTION OF FOSTER STREET 3 CS MAGIC 38 2024 100% $0   $3,992,645 $5,370,950 $0   $0   $0     $0 $3,992,645 ($1,378,305) $5,370,950
Ashland 608436 ASHLAND- REHABILITATION AND RAIL CROSSING IMPROVEMENTS ON CHERRY STREET 3 CS MWRC 38 2024 25% $0   $1,222,315 $0 $0 $1,222,315 $0   $0     $0 $1,222,315 $0 $1,222,315
Ipswich 605743 IPSWICH- RESURFACING & RELATED WORK ON CENTRAL & SOUTH MAIN STREETS 4 CS NSTF 48 2024 25% $0   $5,490,888 $0 $0 $0 $0 $5,490,888 $0     $0 $5,490,888 $0 $5,490,888
Peabody 609211 PEABODY- INDEPENDENCE GREENWAY EXTENSION 4 BP NSTF 34 2024 75% $0   $3,922,122 $5,221,550 $0 $0 $0   $0     $0 $3,922,122 ($1,299,428) $5,221,550
Lynn 609252 LYNN- REHABILITATION OF ESSEX STREET 4 CS ICC 66 2024 Approved $0   $17,602,000 $0 $0 $19,698,640 $0   $0     $0 $17,602,000 ($2,096,640) $19,698,640
MassDOT 608007 COHASSET- SCITUATE- CORRIDOR IMPROVEMENTS AND RELATED WORK ON JUSTICE CUSHING HIGHWAY (ROUTE 3A), FROM BEECHWOOD STREET TO HENRY TURNER BAILEY ROAD 5 CS SSC 37 2024 100% $0   $12,509,786 $17,611,835 $0   $0   $0     $0 $12,509,786 ($5,102,049) $17,611,835
MassDOT 603739 WRENTHAM- CONSTRUCTION OF ROUTE I-495/ROUTE 1A RAMPS 5 MI SWAP 55 2024 75% $0   $15,587,884 $20,922,344 $0   $0   $0     $0 $15,587,884 ($5,334,460) $20,922,344
MassDOT 110980 NEWTON- WESTON- BRIDGE REHABILITATION, N-12-010=W-29-005, COMMONWEALTH AVENUE (ROUTE 30) OVER THE CHARLES RIVER 6 CS ICC N/A 2024 75% $0   $22,725,820 $22,725,820 $0   $0   $0     $0 $22,725,820 $0 $22,725,820
MBTA S12706 FOREST HILLS IMPROVEMENT PROJECT 6 TM ICC N/A 2024 0% $0   $6,400,000 $6,400,000 $0   $0   $0     $0 $6,400,000 $0 $6,400,000
MassDOT 608067 WOBURN- INTERSECTION RECONSTRUCTION AT ROUTE 3 (CAMBRIDGE ROAD) & BEDFORD ROAD AND SOUTH BEDFORD STREET 4 II NSPC 52 2025 Approved $0   $0   $1,555,200 $1,497,600 $0   $0     $0 $1,555,200 $57,600 $1,497,600
Peabody 610544 PEABODY- MULTI-USE PATH CONSTRUCTION OF INDEPENDENCE GREENWAY AT I-95 AND ROUTE 1 4 BP NSTF 53 2025 25% $0   $0   $6,334,200 $6,099,600 $0   $0     $0 $6,334,200 $234,600 $6,099,600
Woburn 610662 WOBURN- ROADWAY AND INTERSECTION IMPROVEMENTS AT WOBURN COMMON, ROUTE 38 (MAIN STREET), WINN STREET, PLEASANT STREET AND MONTVALE AVENUE 4 CS NSPC 75 2025 Approved $0   $0   $15,530,400 $0 $0 $14,955,200 $0     $0 $15,530,400 $575,200 $14,955,200
Everett 609257 EVERETT- RECONSTRUCTION OF BEACHAM STREET 4 CS ICC 54 2025 Approved $0   $0   $10,168,416 $9,791,808 $0   $0     $0 $10,168,416 $376,608 $9,791,808
Hingham 605168 HINGHAM- IMPROVEMENTS ON ROUTE 3A FROM OTIS STREET/COLE ROAD  INCLUDING SUMMER STREET AND ROTARY; ROCKLAND STREET TO GEORGE WASHINGTON BOULEVARD.   5 CS SSC 57 2025 25% $0   $0   $15,596,550 $15,018,900 $0   $0     $0 $15,596,550 $577,650 $15,018,900
MassDOT 608045 MILFORD- REHABILITATION ON ROUTE 16, FROM ROUTE 109 TO BEAVER STREET 3 CS SWAP 50 2026 25% $0   $0   $0   $10,119,616 $9,758,201 $0     $0 $10,119,616 $361,415 $9,758,201
Belmont 609204 BELMONT- COMMUNITY PATH, BELMONT COMPONENT OF THE MCRT (PHASE I) 4 BP ICC 64.6 2026 25% $0   $0   $0   $21,034,382 $20,283,154 $0     $0 $21,034,382 $751,228 $20,283,154
Salem 609437 SALEM- PEABODY- BOSTON STREET IMPROVEMENTS 4 CS NSTF 67.8 2026 25% $0   $0   $0   $13,977,600 $14,172,868 $0     $0 $13,977,600 ($195,268) $14,172,868
Weston 608940 WESTON- INTERSECTION IMPROVEMENTS BOSTON POST ROAD (ROUTE 20) AT WELLESLEY STREET  6 II MWRC 50.6 2026 25% $0   $0   $0   $2,681,330 $2,185,303 $0     $0 $2,681,330 $496,027 $2,185,303
Weston 608954 WESTON- RECONSTRUCTION ON ROUTE 30 6 CS MWRC 49.2 2026 25% $0   $0   $0   $17,028,272 $16,420,119 $0     $0 $17,028,272 $608,153 $16,420,119
Swampscott 610666 SWAMPSCOTT- RAIL TRAIL CONSTRUCTION 4 BP NSTF 66.4 2027 Approved $0   $0   $0   $0   $8,932,000 $0 $8,624,000 $0 $8,932,000 $308,000 $8,624,000
MassDOT 607981 SOMERVILLE- MCGRATH BOULEVARD CONSTRUCTION 4 MI ICC 72.2 2027 Approved $0   $0   $0   $0   $20,000,000 $20,000,000 $30,000,000 $0 $20,000,000 ########### $50,000,000
Lynn 609246 LYNN- REHABILITATION OF WESTERN AVENUE (ROUTE 107) 4 CS ICC 74.9 2027 Approved $0   $0   $0   $0   $15,000,000 $15,000,000 $20,000,000 $0 $15,000,000 ########### $35,000,000
Brookline 610932 BROOKLINE- REHABILITATION OF WASHINGTON STREET 6 CS ICC 62.4 2027 Approved $0   $0   $0   $0   $30,030,812 $28,995,267   $0 $30,030,812 $1,035,545 $28,995,267
Chelsea 611983 CHELSEA- PARK STREET & PEARL STREET RECONSTRUCTION 6 CS ICC 69.9 2027 Approved $0   $0   $0   $0   $12,123,769 $11,705,708   $0 $12,123,769 $418,061 $11,705,708
Newton S12125 NEWTON MICROTRANSIT SERVICE 4 CC ICC 53 2021-2023 0% $152,000 $152,000 $0   $0   $0   $0     $0 $152,000 $0 $152,000
MBTA S12705 LYNN STATION IMPROVEMENTS PHASE II 4 TM ICC N/A 2023-2024 0% $34,500,000 $34,500,000 $13,600,000 $13,600,000 $0   $0   $0     $0 $48,100,000 $0 $48,100,000
MWRTA S12701 MWRTA CATCHCONNECT MICROTRANSIT SERVICE EXPANSION 3 CC MWRC 59 2023-2025 0% $141,250 $141,250 $149,425 $149,425 $159,488 $159,488 $0   $0     $0 $450,163 $0 $450,163
MART S12703 MONTACHUSETT RTA MICROTRANSIT SERVICE 3 CC MAGIC 57 2023-2025 0% $479,066 $479,066 $430,354 $430,354 $406,641 $406,641 $0   $0     $0 $1,316,061 $0 $1,316,061
Stoneham S12699 STONEHAM SHUTTLE SERVICE 4 CC NSPC 72 2023-2025 0% $330,189 $330,189 $261,439 $261,439 $205,189 $205,189 $0   $0     $0 $796,817 $0 $796,817
CATA S12700 CATA ON DEMAND MICROTRANSIT SERVICE EXPANSION 4 CC NSTF 61.75 2023-2025 0% $333,450 $333,450 $265,065 $265,065 $214,776 $214,776 $0   $0     $0 $813,291 $0 $813,291
Newton S12694 NEWMO MICROTRANSIT SERVICE EXPANSION 6 CC ICC 87 2023-2025 0% $412,665 $412,665 $268,246 $268,246 $209,663 $209,663 $0   $0     $0 $890,574 $0 $890,574
Watertown S12697 PLEASANT STREET SHUTTLE SERVICE EXPANSION 6 CC ICC 78 2023-2025 0% $437,825 $437,825 $335,434 $335,434 $228,939 $228,939 $0   $0     $0 $1,002,198 $0 $1,002,198
Watertown 607777 WATERTOWN- REHABILITATION OF MOUNT AUBURN STREET (ROUTE 16) 6 CS ICC 75 2023-24 75% $24,405,096 $24,405,096 $2,841,078 $3,494,249 $0 $0 $0   $0     $0 $27,246,174 ($653,171) $27,899,345
Canton S12114 ROYALL STREET SHUTTLE 6 CC TRIC 51 2023-24 0% $177,177 $177,177 $148,542 $148,542 $0 $0 $0   $0     $0 $325,719 $0 $325,719
Regionwide S12124 COMMUNITY CONNECTIONS PROGRAM Regionwide CC Regionwide N/A 2024-27 0% $0   $641,495 $641,495 $1,075,304 $1,075,304 $2,500,000 $2,500,000 $2,500,000 $2,500,000 $2,500,000 $0 $6,716,799 ($2,500,000) $9,216,799
Boston 606226 BOSTON- RECONSTRUCTION OF RUTHERFORD AVENUE, FROM CITY SQUARE TO SULLIVAN SQUARE 6 MI ICC 59 2025-2027 25% Received R1 $0   $0   $32,783,959 $0 $33,500,000 $0 $33,500,000 $0 $33,500,000 $0 $99,783,959 $66,283,959 $33,500,000
MassDOT 608051 WILMINGTON- RECONSTRUCTION ON ROUTE 38 (MAIN STREET), FROM ROUTE 62 TO THE WOBURN C.L. 4 CS NSPC 59 2025-26 75% Comments $0   $0   $24,644,177 $23,731,429 $0 $0 $0 $0   $0 $24,644,177 $912,748 $23,731,429
Norwood 605857 NORWOOD- INTERSECTION IMPROVEMENTS @ ROUTE 1 & UNIVERSITY AVENUE/EVERETT STREET  5 II TRIC 55 2025-26 25% Received R1 $0   $0   $9,000,000 $0 $15,837,870 $9,000,000 $0 $15,837,870   $0 $24,837,870 $0 $24,837,870
Regionwide S12113 TRANSIT MODERNIZATION PROGRAM Regionwide TM Regionwide N/A 2025-27 0% $0   $0   $6,500,000 $6,500,000 $6,500,000 $6,500,000 $6,500,000 $6,500,000 $6,500,000 $0 $19,500,000 ($6,500,000) $26,000,000
MassDOT 607904 FRAMINGHAM- CULVERT REPLACEMENT ON ROUTE 126 (HOLLIS STREET) OVER WAUSHAKUM POND BROOK State Highway Project CS MWRC N/A N/A N/A $0   $0   $0   $0   $0     $0 $0 $0 $0
Natick 610691 Cochituate Rail Trail Extension (MBTA Station to Mechanic Street) - Natick Center Connection State Highway Project BP MWRC 67 N/A 25% Received $0   $0   $0   $0   $0     $0 $0 $0 $0
Bellingham 612963 Bellingham - Roadway Rehabilitation of Route 126 (Hartford Road), from 800 North of the I-495 NB off ramp to Medway T/L, including B-06-017 State Highway Project CS SWAP 51.8 N/A Approved $0   $0   $0   $0   $0     $0 $0 $0 $0
MassDOT 613121 EVERETT- TARGETED SAFETY IMPROVEMENTS ON ROUTE 16 State Highway Project II ICC N/A N/A Approved $0   $0   $0   $0   $0     $0 $0 $0 $0
Wakefield 613145 WAKEFIELD- COMPRHENSIVE DOWNTOWN TRANSPORTATION IMPROVEMENT PROJECT State Highway Project CS NSPC 61.8 N/A Approved $0   $0   $0   $0   $0     $0 $0 $0 $0
Ipswich 612738 Argilla Roadway Reconstruction and Adaptation (Crane Estate to Crane Beach) State Highway Project CS NSTF 37.1 N/A Approved $0   $0   $0   $0   $0     $0 $0 $0 $0
Malden 613088 Spot Pond Brook Greenway State Highway Project BP ICC 73 N/A Approved $0   $0   $0   $0   $0     $0 $0 $0 $0
MassDOT 608052 NORWOOD- INTERSECTION & SIGNAL IMPROVEMENTS AT US 1 (PROVIDENCE HIGHWAY) & MORSE STREET State Highway Project II TRIC N/A N/A NTP $0   $0   $0   $0   $0     $0 $0 $0 $0
Westwood 608158 WESTWOOD- NORWOOD- RECONSTRUCTION OF CANTON STREET TO UNIVERSITY DRIVE, INCLUDING REHAB OF N-25-032=W-31-018 State Highway Project CS TRIC 53.3 N/A 25% Received $0   $0   $0   $0   $0     $0 $0 $0 $0
DCR 609290 CAMBRIDGE- INTERSECTION IMPROVEMENTS AT FRESH POND PARKWAY/GERRYS LANDING ROAD, FROM BRATTLE STREET TO MEMORIAL DRIVE  State Highway Project II ICC N/A N/A Approved $0   $0   $0   $0   $0     $0 $0 $0 $0
MassDOT 610650 BOSTON- GALLIVAN BOULEVARD (ROUTE 203) SAFETY IMPROVEMENTS, FROM WASHINGTON STREET TO GRANITE AVENUE State Highway Project II ICC N/A N/A Approved $0   $0   $0   $0   $0     $0 $0 $0 $0
Quincy 610823 QUINCY- INTERSECTION IMPROVEMENTS AT WILLARD STREET AND RICCIUTI DRIVE State Highway Project II ICC N/A N/A 25% Received R1 $0   $0   $0   $0   $0     $0 $0 $0 $0
MassDOT 611959 DEDHAM- INTERSECTION AND PEDESTRIAN IMPROVEMENTS ON ROUTE 1, ROUTE 1A, AND ELM STREET State Highway Project II TRIC N/A N/A Approved $0   $0   $0   $0   $0     $0 $0 $0 $0
MassDOT 612613 NEWTON- INTERSECTION IMPROVEMENTS AT ROUTE 16 AND QUINOBEQUIN ROAD State Highway Project II ICC N/A N/A Approved $0   $0   $0   $0   $0     $0 $0 $0 $0
MassDOT 612616 MILTON- INTERSECTION IMPROVEMENTS AT ROUTE 138 AND BRADLEE ROAD State Highway Project II ICC/TRIC N/A N/A Approved $0   $0   $0   $0   $0     $0 $0 $0 $0
Boston 612989 BOSTON- BRIDGE PRESERVATION, B-16-066 (38D), CAMBRIDGE STREET OVER MBTA State Highway Project CS ICC 53.1 N/A Approved $0   $0   $0   $0   $0     $0 $0 $0 $0
MassDOT 613099 BOSTON- SLOPE STABILIZATION ON I-93 State Highway Project CS ICC N/A N/A Approved $0   $0   $0   $0   $0     $0 $0 $0 $0
MassDOT 613154 WELLESLEY- DRAINAGE IMPROVEMENTS ALONG ROUTE 9 BOULDER BROOK CULVERT State Highway Project CS MWRC N/A N/A Approved $0   $0   $0   $0   $0     $0 $0 $0 $0
MassDOT 613164 BOSTON NEPONSET BRIDGE AT OSCEOLA STREET State Highway Project CS ICC N/A N/A N/A $0   $0   $0   $0   $0     $0 $0 $0 $0
Projects in red text were identified as being high risk for not meeting their advertisement date at February 2023 TIP readiness meeting.   2023 2024 2025 2026 2027 2028 2024-28 Total
*Projects with an asterisk were identified as candidates to remain in current year if near-term issue resolution occurs. Total Available Regional Highway Target Funds (2024-28 TIP): $128,950,081 $130,647,095 $128,427,689 $125,285,687 $155,132,142 ########### ###########
Indicates an increase in project cost (> $500,000 or 20% of project cost)
Indicates a project was recommended to move out to a later TIP year   Current Proposed Current Proposed Current Proposed Current Proposed Current Proposed Proposed Proposed
Indicates a project was recommended to move into an earlier TIP year Draft Total Programmed Regional Highway Target Funds: $128,014,796 $130,580,904 $117,059,590 $97,846,748 $124,612,902 $94,725,344 $123,179,070 $101,265,733 $128,586,581 $100,538,845 $101,124,000 $495,500,670
Indicates a project is proposed to be newly added to the TIP Regional Highway Target Funds Remaining (Unprogrammed): $935,285 -$1,630,823 $13,587,505 $32,800,347 $3,814,787 $33,702,345 $2,106,617 $24,019,954 $26,545,561 $54,593,297 $56,928,175 $202,044,118
Indicates a project that is proposed to be newly added to the TIP and for which a project application was received by the MPO. Percent Unprogrammed 0.7% -1.3% 10.4% 25.1% 3.0% 26.2% 1.7% 19.2% 17.1% 35.2% 36.0% 29.0%
                               
                               
                               
Abbreviations                                
TIP Investment programs: BP = Bicycle and Pedestrian.  CC = Community Connections.  CS = Complete Streets.  II = Intersection Improvements.  MI = Major Infrastructure. 
TM = Transit Modernization
                           
                               
Metropolitan Area Planning Council (MAPC) subregions: ICC = Inner Core Committee.  MAGIC = Minuteman Advisory Group on Interlocal Coordination.  MWRC = MetroWest Regional Collaborative.  NSPC = North Suburban Planning Council.  NSTF = North Shore Task Force.  SSC = South Shore Coalition.  SWAP = SouthWest Advisory Planning Committee.  TRIC = Three Rivers Interlocal Council.                            
                               
Other abbreviations: MassDOT = Massachusetts Department of Transportation.  DPH = design public hearing.  FFY = federal fiscal year.  N/A = not applicable.  PRC = MassDOT's Project Review Committee.  PS&E = Plans, Specifications, and Estimates.  R1 = resubmission.  TRD = TIP Readiness Days. NewMo = Newton in Motion.  MassDOT = Massachusetts Department of Transportation.                            

 

Scenario 2 - Score Performance (backup)

Proponent(s) TIP ID Project Name MassDOT District Investment Category MAPC
Subregion
Evaluation Score Programmed Year(s) Design Status Current
 FFY 2024
Proposed
 FFY 2024
Current
FFY 2025
Proposed
 FFY 2025
Current
FFY 2026
Proposed  FFY 2026 Current
FFY 2027
Proposed
FFY 2027
Proposed
FFY 2028
Other Non-Target Funds Current Program Cost (FFY23-28) Cost Change Proposed Total Cost (all FYs)
Boston 606453 BOSTON- IMPROVEMENTS ON BOYLSTON STREET, FROM INTERSECTION OF BROOKLINE AVENUE & PARK DRIVE TO IPSWICH STREET 6 CS ICC 60 2023 25% Received R1 $8,665,052 $0 $0 $9,011,654 $0   $0     $0 $8,665,052 ($346,602) $9,011,654
Littleton 609054 LITTLETON- RECONSTRUCTION OF FOSTER STREET 3 CS MAGIC 38 2024 100% Received $3,992,645 $5,370,950 $0   $0   $0     $0 $3,992,645 ($1,378,305) $5,370,950
Ashland 608436 ASHLAND- REHABILITATION AND RAIL CROSSING IMPROVEMENTS ON CHERRY STREET 3 CS MWRC 38 2024 25% Comments $1,222,315 $0 $0 $1,271,207 $0   $0     $0 $1,222,315 ($48,892) $1,271,207
Ipswich 605743 IPSWICH- RESURFACING & RELATED WORK ON CENTRAL & SOUTH MAIN STREETS 4 CS NSTF 48 2024 25% Received $5,490,888 $0 $0 $0 $0 $5,930,159 $0     $0 $5,490,888 ($439,271) $5,930,159
Peabody 609211 PEABODY- INDEPENDENCE GREENWAY EXTENSION 4 BP NSTF 34 2024 75% Received $3,922,122 $5,221,550 $0 $0 $0   $0     $0 $3,922,122 ($1,299,428) $5,221,550
Lynn 609252 LYNN- REHABILITATION OF ESSEX STREET 4 CS ICC 66 2024 Approved $17,602,000 $0 $0 $19,698,640 $0   $0     $0 $17,602,000 ($2,096,640) $19,698,640
MassDOT 608007 COHASSET- SCITUATE- CORRIDOR IMPROVEMENTS AND RELATED WORK ON JUSTICE CUSHING HIGHWAY (ROUTE 3A), FROM BEECHWOOD STREET TO HENRY TURNER BAILEY ROAD 5 CS SSC 37 2024 100% Complete $12,509,786 $17,611,835 $0   $0   $0     $0 $12,509,786 ($5,102,049) $17,611,835
MassDOT 603739 WRENTHAM- CONSTRUCTION OF ROUTE I-495/ROUTE 1A RAMPS 5 MI SWAP 55 2024 75% Comments $15,587,884 $20,922,344 $0   $0   $0     $0 $15,587,884 ($5,334,460) $20,922,344
MassDOT 110980 NEWTON- WESTON- BRIDGE REHABILITATION, N-12-010=W-29-005, COMMONWEALTH AVENUE (ROUTE 30) OVER THE CHARLES RIVER 6 CS ICC N/A 2024 25% Received $22,725,820 $22,725,820 $0   $0   $0     $0 $22,725,820 $0 $22,725,820
MassDOT 608067 WOBURN- INTERSECTION RECONSTRUCTION AT ROUTE 3 (CAMBRIDGE ROAD) & BEDFORD ROAD AND SOUTH BEDFORD STREET 4 II NSPC 52 2025 Approved $0 $0 $1,555,200 $1,497,600 $0   $0     $0 $1,555,200 $57,600 $1,497,600
Peabody 610544 PEABODY- MULTI-USE PATH CONSTRUCTION OF INDEPENDENCE GREENWAY AT I-95 AND ROUTE 1 4 BP NSTF 53 2025 25% Received $0 $0 $6,334,200 $6,099,600 $0   $0     $0 $6,334,200 $234,600 $6,099,600
Woburn 610662 WOBURN- ROADWAY AND INTERSECTION IMPROVEMENTS AT WOBURN COMMON, ROUTE 38 (MAIN STREET), WINN STREET, PLEASANT STREET AND MONTVALE AVENUE 4 CS NSPC 75 2025 Approved $0 $0 $15,530,400 $0 $0 $14,955,200 $0     $0 $15,530,400 $575,200 $14,955,200
Everett 609257 EVERETT- RECONSTRUCTION OF BEACHAM STREET 4 CS ICC 54 2025 Approved $0 $0 $10,168,416 $9,791,808 $0   $0     $0 $10,168,416 $376,608 $9,791,808
Hingham 605168 HINGHAM- IMPROVEMENTS ON ROUTE 3A FROM OTIS STREET/COLE ROAD  INCLUDING SUMMER STREET AND ROTARY; ROCKLAND STREET TO GEORGE WASHINGTON BOULEVARD.   5 CS SSC 57 2025 25% DPH $0 $0 $15,596,550 $15,018,900 $0   $0     $0 $15,596,550 $577,650 $15,018,900
MassDOT 608045 MILFORD- REHABILITATION ON ROUTE 16, FROM ROUTE 109 TO BEAVER STREET 3 CS SWAP 50 2026 25% Comments $0 $0 $0   $10,119,616 $9,758,201 $0     $0 $10,119,616 $361,415 $9,758,201
Belmont 609204 BELMONT- COMMUNITY PATH, BELMONT COMPONENT OF THE MCRT (PHASE I) 4 BP ICC 64.6 2026 25% Received $0 $0 $0   $21,034,382 $20,283,154 $0     $0 $21,034,382 $751,228 $20,283,154
Salem 609437 SALEM- PEABODY- BOSTON STREET IMPROVEMENTS 4 CS NSTF 67.8 2026 25% DPH $0 $0 $0   $13,977,600 $14,172,868 $0     $0 $13,977,600 ($195,268) $14,172,868
Weston 608940 WESTON- INTERSECTION IMPROVEMENTS BOSTON POST ROAD (ROUTE 20) AT WELLESLEY STREET  6 II MWRC 50.6 2026 25% Received R1 $0 $0 $0   $2,681,330 $2,185,303 $0     $0 $2,681,330 $496,027 $2,185,303
Weston 608954 WESTON- RECONSTRUCTION ON ROUTE 30 6 CS MWRC 49.2 2026 25% DPH $0 $0 $0   $17,028,272 $16,420,119 $0     $0 $17,028,272 $608,153 $16,420,119
Swampscott 610666 SWAMPSCOTT- RAIL TRAIL CONSTRUCTION 4 BP NSTF 66.4 2027 Approved $0 $0 $0   $0   $8,932,000 $0 $8,624,000 $0 $8,932,000 $308,000 $8,624,000
MassDOT 607981 SOMERVILLE- MCGRATH BOULEVARD CONSTRUCTION 4 MI ICC 72.2 2027 Approved $0 $0 $0   $0   $20,000,000 $20,000,000 $30,000,000 $0 $20,000,000 ########### $50,000,000
Lynn 609246 LYNN- REHABILITATION OF WESTERN AVENUE (ROUTE 107) 4 CS ICC 74.9 2027 Approved $0 $0 $0   $0   $15,000,000 $15,000,000 $20,000,000 $0 $15,000,000 ########### $35,000,000
Brookline 610932 BROOKLINE- REHABILITATION OF WASHINGTON STREET 6 CS ICC 62.4 2027 Approved $0 $0 $0   $0   $30,030,812 $28,995,267   $0 $30,030,812 $1,035,545 $28,995,267
Chelsea 611983 CHELSEA- PARK STREET & PEARL STREET RECONSTRUCTION 6 CS ICC 69.9 2027 Approved $0 $0 $0   $0   $12,123,769 $11,705,708   $0 $12,123,769 $418,061 $11,705,708
Newton S12125 NEWTON MICROTRANSIT SERVICE 4 CC ICC 53 2021-2023 N/A $0 $0 $0   $0   $0     $0 $152,000 $0 $152,000
MBTA S12705 LYNN STATION IMPROVEMENTS PHASE II 4 TM ICC N/A 2023-2024 N/A $13,600,000 $13,600,000 $0   $0   $0     $0 $48,100,000 $0 $48,100,000
MWRTA S12701 MWRTA CATCHCONNECT MICROTRANSIT SERVICE EXPANSION 3 CC MWRC 59 2023-2025 N/A $149,425 $149,425 $159,488 $159,488 $0   $0     $0 $450,163 $0 $450,163
MART S12703 MONTACHUSETT RTA MICROTRANSIT SERVICE 3 CC MAGIC 57 2023-2025 N/A $430,354 $430,354 $406,641 $406,641 $0   $0     $0 $1,316,061 $0 $1,316,061
Stoneham S12699 STONEHAM SHUTTLE SERVICE 4 CC NSPC 72 2023-2025 N/A $261,439 $261,439 $205,189 $205,189 $0   $0     $0 $796,817 $0 $796,817
CATA S12700 CATA ON DEMAND MICROTRANSIT SERVICE EXPANSION 4 CC NSTF 61.75 2023-2025 N/A $265,065 $265,065 $214,776 $214,776 $0   $0     $0 $813,291 $0 $813,291
Newton S12694 NEWMO MICROTRANSIT SERVICE EXPANSION 6 CC ICC 87 2023-2025 N/A $268,246 $268,246 $209,663 $209,663 $0   $0     $0 $890,574 $0 $890,574
Watertown S12697 PLEASANT STREET SHUTTLE SERVICE EXPANSION 6 CC ICC 78 2023-2025 N/A $335,434 $335,434 $228,939 $228,939 $0   $0     $0 $1,002,198 $0 $1,002,198
Watertown 607777 WATERTOWN- REHABILITATION OF MOUNT AUBURN STREET (ROUTE 16) 6 CS ICC 75 2023-24 75% Received $2,841,078 $3,494,249 $0 $0 $0   $0     $0 $27,246,174 ($653,171) $27,899,345
Canton S12114 ROYALL STREET SHUTTLE 6 CC TRIC 51 2023-24 N/A $148,542 $148,542 $0 $0 $0   $0     $0 $325,719 $0 $325,719
Regionwide S12124 COMMUNITY CONNECTIONS PROGRAM Regionwide CC Regionwide N/A 2025-28 N/A $641,495 $0 $1,075,304 $1,075,304 $2,500,000 $2,500,000 $2,500,000 $2,500,000 $2,500,000 $0 $6,716,799 ($1,858,505) $8,575,304
MWRTA TBD CatchConnect MicroTransit Expansion Phase 2 Regionwide CC MWRC 90 2024-27 N/A $0 $140,000   $132,500   $107,977       $0 $0 ($380,477) $380,477
Lynn TBD Broad Street Corridor TSP 4 CC ICC 88 2024 N/A $0 $297,800               $0 $0 ($297,800) $297,800
Medford TBD Medford Bicycle Parking (Tier 1) 4 CC ICC 84 2024 N/A $0 $29,600               $0 $0 ($29,600) $29,600
Medford TBD Medford BlueBikes Expansion 4 CC ICC 78 2024 N/A $0 $118,643               $0 $0 ($118,643) $118,643
Canton TBD Canton Center Bicycle Racks 6 CC TRIC 72 2024 N/A $0 $10,000               $0 $0 ($10,000) $10,000
Canton TBD Canton Public Schools Bike Program 6 CC TRIC 38 2024 N/A $0 $22,500               $0 $0 ($22,500) $22,500
Boston 606226 BOSTON- RECONSTRUCTION OF RUTHERFORD AVENUE, FROM CITY SQUARE TO SULLIVAN SQUARE 6 MI ICC 59 2028 25% Received R1 $0   $32,783,959 $0 $33,500,000 $0 $33,500,000 $0 $33,500,000 $0 $99,783,959 $66,283,959 $33,500,000
MassDOT 608051 WILMINGTON- RECONSTRUCTION ON ROUTE 38 (MAIN STREET), FROM ROUTE 62 TO THE WOBURN C.L. 4 CS NSPC 59 2025-26 75% Comments $0   $24,644,177 $23,731,429 $0 $0 $0 $0   $0 $24,644,177 $912,748 $23,731,429
Norwood 605857 NORWOOD- INTERSECTION IMPROVEMENTS @ ROUTE 1 & UNIVERSITY AVENUE/EVERETT STREET  5 II TRIC 55 2026 25% Received R1 $0   $9,000,000 $0 $15,837,870 $9,000,000 $0 $15,837,870   $0 $24,837,870 $0 $24,837,870
Regionwide S12113 TRANSIT MODERNIZATION PROGRAM Regionwide TM Regionwide N/A 2025-2028 Administrative $0   $6,500,000 $6,500,000 $6,500,000 $6,500,000 $6,500,000 $6,500,000 $6,500,000 $0 $19,500,000 ($6,500,000) $26,000,000
MBTA S12706 FOREST HILLS IMPROVEMENT PROJECT 6 TM ICC N/A 2024 N/A $6,400,000 $6,400,000 $0   $0   $0     $0 $6,400,000 $0 $6,400,000
Natick 610691 Cochituate Rail Trail Extension (MBTA Station to Mechanic Street) - Natick Center Connection 3 BP MWRC 67 2028 25% Received $0   $0   $0   $0   $6,690,043 $0 $0 ($6,690,043) $6,690,043
Wakefield 613145 WAKEFIELD- COMPRHENSIVE DOWNTOWN TRANSPORTATION IMPROVEMENT PROJECT 4 CS NSPC 61.8 2028 Approved $0   $0   $0   $0   $16,581,200 $0 $0 ########### $16,581,200
Malden 613088 Spot Pond Brook Greenway 4 BP ICC 73 2027 Approved $0   $0   $0   $0 $3,250,000 $0 $0 $0 ($3,250,000) $3,250,000
Westwood 608158 WESTWOOD- NORWOOD- RECONSTRUCTION OF CANTON STREET TO UNIVERSITY DRIVE, INCLUDING REHAB OF N-25-032=W-31-018 6 CS TRIC 53.3 2028 25% Received $0   $0   $0   $0   $19,047,306 $0 $0 ########### $19,047,306
Boston 612989 BOSTON- BRIDGE PRESERVATION, B-16-066 (38D), CAMBRIDGE STREET OVER MBTA 6 CS ICC 53.1 2026 Approved $0   $0   $0 $15,400,000 $0     $0 $0 ########### $15,400,000
CTPS TBD BikeShare State of Good Repair Set-Aside Regionwide CC Regionwide N/A 2025-2028 Administrative $0   $0 $1,000,000 $0 $1,000,000 $0 $1,000,000 $1,000,000 $0 $0 ($4,000,000) $4,000,000
CTPS TBD Project Design Support Pilot (FFY 2025) Regionwide CS Regionwide N/A 2025 Administrative $0   $0 $1,500,000 $0 $0 $0     $0 $0 ($1,500,000) $1,500,000
Projects in red text were identified as being high risk for not meeting their advertisement date at February 2023 TIP readiness meeting.   2024 2025 2026 2027 2028 2024-28 Total
*Projects with an asterisk were identified as candidates to remain in current year if near-term issue resolution occurs. Total Available Regional Highway Target Funds (2024-28 TIP): $130,647,095 $128,427,689 $125,285,687 $155,132,142 ########### ###########
Indicates an increase in project cost (> $500,000 or 20% of project cost)
Indicates a project was recommended to move out to a later TIP year   Current Proposed Current Proposed Current Proposed Current Proposed Proposed Proposed
Indicates a project was recommended to move into an earlier TIP year Draft Total Programmed Regional Highway Target Funds: $117,059,590 $97,823,796 $124,612,902 $97,753,338 $123,179,070 $118,212,981 $128,586,581 $104,788,845 $144,442,549 $563,021,509
Indicates a project is proposed to be newly added to the TIP Regional Highway Target Funds Remaining (Unprogrammed): $13,587,505 $32,823,299 $3,814,787 $30,674,351 $2,106,617 $7,072,706 $26,545,561 $50,343,297 $13,609,626 $134,523,279
Indicates a project that is proposed to be newly added to the TIP and for which a project application was received by the MPO. Percent Unprogrammed 10.4% 25.1% 3.0% 23.9% 1.7% 5.6% 17.1% 32.5% 8.6% 19.3%
                           
                           
                           
Abbreviations                            
TIP Investment programs: BP = Bicycle and Pedestrian.  CC = Community Connections.  CS = Complete Streets.  II = Intersection Improvements.  MI = Major Infrastructure. 
TM = Transit Modernization
                       
                           
Metropolitan Area Planning Council (MAPC) subregions: ICC = Inner Core Committee.  MAGIC = Minuteman Advisory Group on Interlocal Coordination.  MWRC = MetroWest Regional Collaborative.  NSPC = North Suburban Planning Council.  NSTF = North Shore Task Force.  SSC = South Shore Coalition.  SWAP = SouthWest Advisory Planning Committee.  TRIC = Three Rivers Interlocal Council.                        
                           
Other abbreviations: DPH = design public hearing.  FFY = federal fiscal year.  N/A = not applicable.  PRC = MassDOT's Project Review Committee.  PS&E = Plans, Specifications, and EStimates.  R1 = resubmission.  TRD = TIP Readiness Days.                        

 

Scenario 3 - Cost Effectiveness (backup)

Proponent(s) TIP ID Project Name MassDOT District MAPC
Subregion
Evaluation Score Programmed Year(s) Design Status Current
 FFY 2024
Proposed
 FFY 2024
Current
FFY 2025
Proposed
 FFY 2025
Current
FFY 2026
Proposed  FFY 2026 Current
FFY 2027
Proposed
FFY 2027
Proposed
FFY 2028
Other Non-Target Funds Current Program Cost (FFY23-28) Cost Change Proposed Total Cost (all FYs)
Boston 606453 BOSTON- IMPROVEMENTS ON BOYLSTON STREET, FROM INTERSECTION OF BROOKLINE AVENUE & PARK DRIVE TO IPSWICH STREET 6 ICC 60 2023 25% Received R1 $8,665,052 $0 $0 $9,011,654 $0   $0     $0 $8,665,052 ($346,602) $9,011,654
Littleton 609054 LITTLETON- RECONSTRUCTION OF FOSTER STREET 3 MAGIC 38 2024 100% Received $3,992,645 $5,370,950 $0   $0   $0     $0 $3,992,645 ($1,378,305) $5,370,950
Ashland 608436 ASHLAND- REHABILITATION AND RAIL CROSSING IMPROVEMENTS ON CHERRY STREET 3 MWRC 38 2024 25% Comments $1,222,315 $0 $0 $1,271,207 $0   $0     $0 $1,222,315 ($48,892) $1,271,207
Ipswich 605743 IPSWICH- RESURFACING & RELATED WORK ON CENTRAL & SOUTH MAIN STREETS 4 NSTF 48 2024 25% Received $5,490,888 $0 $0 $0 $0 $5,930,159 $0     $0 $5,490,888 ($439,271) $5,930,159
Peabody 609211 PEABODY- INDEPENDENCE GREENWAY EXTENSION 4 NSTF 34 2024 75% Received $3,922,122 $5,221,550 $0 $0 $0   $0     $0 $3,922,122 ($1,299,428) $5,221,550
Lynn 609252 LYNN- REHABILITATION OF ESSEX STREET 4 ICC 66 2024 Approved $17,602,000 $0 $0 $19,698,640 $0   $0     $0 $17,602,000 ($2,096,640) $19,698,640
MassDOT 608007 COHASSET- SCITUATE- CORRIDOR IMPROVEMENTS AND RELATED WORK ON JUSTICE CUSHING HIGHWAY (ROUTE 3A), FROM BEECHWOOD STREET TO HENRY TURNER BAILEY ROAD 5 SSC 37 2024 100% Complete $12,509,786 $17,611,835 $0   $0   $0     $0 $12,509,786 ($5,102,049) $17,611,835
MassDOT 603739 WRENTHAM- CONSTRUCTION OF ROUTE I-495/ROUTE 1A RAMPS 5 SWAP 55 2024 75% Comments $15,587,884 $20,922,344 $0   $0   $0     $0 $15,587,884 ($5,334,460) $20,922,344
MassDOT 110980 NEWTON- WESTON- BRIDGE REHABILITATION, N-12-010=W-29-005, COMMONWEALTH AVENUE (ROUTE 30) OVER THE CHARLES RIVER 6 ICC N/A 2024 25% Received $22,725,820 $22,725,820 $0   $0   $0     $0 $22,725,820 $0 $22,725,820
MassDOT 608067 WOBURN- INTERSECTION RECONSTRUCTION AT ROUTE 3 (CAMBRIDGE ROAD) & BEDFORD ROAD AND SOUTH BEDFORD STREET 4 NSPC 52 2025 Approved $0   $1,555,200 $1,497,600 $0   $0     $0 $1,555,200 $57,600 $1,497,600
Peabody 610544 PEABODY- MULTI-USE PATH CONSTRUCTION OF INDEPENDENCE GREENWAY AT I-95 AND ROUTE 1 4 NSTF 53 2025 25% Received $0   $6,334,200 $6,099,600 $0   $0     $0 $6,334,200 $234,600 $6,099,600
Woburn 610662 WOBURN- ROADWAY AND INTERSECTION IMPROVEMENTS AT WOBURN COMMON, ROUTE 38 (MAIN STREET), WINN STREET, PLEASANT STREET AND MONTVALE AVENUE 4 NSPC 75 2025 Approved $0   $15,530,400 $0 $0 $14,955,200 $0     $0 $15,530,400 $575,200 $14,955,200
Everett 609257 EVERETT- RECONSTRUCTION OF BEACHAM STREET 4 ICC 54 2025 Approved $0   $10,168,416 $9,791,808 $0   $0     $0 $10,168,416 $376,608 $9,791,808
Hingham 605168 HINGHAM- IMPROVEMENTS ON ROUTE 3A FROM OTIS STREET/COLE ROAD  INCLUDING SUMMER STREET AND ROTARY; ROCKLAND STREET TO GEORGE WASHINGTON BOULEVARD.   5 SSC 57 2025 25% DPH $0   $15,596,550 $15,018,900 $0   $0     $0 $15,596,550 $577,650 $15,018,900
MassDOT 608045 MILFORD- REHABILITATION ON ROUTE 16, FROM ROUTE 109 TO BEAVER STREET 3 SWAP 50 2026 25% Comments $0   $0   $10,119,616 $9,758,201 $0     $0 $10,119,616 $361,415 $9,758,201
Belmont 609204 BELMONT- COMMUNITY PATH, BELMONT COMPONENT OF THE MCRT (PHASE I) 4 ICC 64.6 2026 25% Received $0   $0   $21,034,382 $20,283,154 $0     $0 $21,034,382 $751,228 $20,283,154
Salem 609437 SALEM- PEABODY- BOSTON STREET IMPROVEMENTS 4 NSTF 67.8 2026 25% DPH $0   $0   $13,977,600 $14,172,868 $0     $0 $13,977,600 ($195,268) $14,172,868
Weston 608940 WESTON- INTERSECTION IMPROVEMENTS BOSTON POST ROAD (ROUTE 20) AT WELLESLEY STREET  6 MWRC 50.6 2026 25% Received R1 $0   $0   $2,681,330 $2,185,303 $0     $0 $2,681,330 $496,027 $2,185,303
Weston 608954 WESTON- RECONSTRUCTION ON ROUTE 30 6 MWRC 49.2 2026 25% DPH $0   $0   $17,028,272 $16,420,119 $0     $0 $17,028,272 $608,153 $16,420,119
Swampscott 610666 SWAMPSCOTT- RAIL TRAIL CONSTRUCTION 4 NSTF 66.4 2027 Approved $0   $0   $0   $8,932,000 $0 $8,624,000 $0 $8,932,000 $308,000 $8,624,000
MassDOT 607981 SOMERVILLE- MCGRATH BOULEVARD CONSTRUCTION 4 ICC 72.2 2027 Approved $0   $0   $0   $20,000,000 $20,000,000 $30,000,000 $0 $20,000,000 ########### $50,000,000
Lynn 609246 LYNN- REHABILITATION OF WESTERN AVENUE (ROUTE 107) 4 ICC 74.9 2027 Approved $0   $0   $0   $15,000,000 $15,000,000 $20,000,000 $0 $15,000,000 ########### $35,000,000
Brookline 610932 BROOKLINE- REHABILITATION OF WASHINGTON STREET 6 ICC 62.4 2027 Approved $0   $0   $0   $30,030,812 $28,995,267   $0 $30,030,812 $1,035,545 $28,995,267
Chelsea 611983 CHELSEA- PARK STREET & PEARL STREET RECONSTRUCTION 6 ICC 69.9 2027 Approved $0   $0   $0   $12,123,769 $11,705,708   $0 $12,123,769 $418,061 $11,705,708
Newton S12125 NEWTON MICROTRANSIT SERVICE 4 ICC 53 2021-2023 N/A $0   $0   $0   $0     $0 $152,000 $0 $152,000
MBTA S12705 LYNN STATION IMPROVEMENTS PHASE II 4 ICC N/A 2023-2024 N/A $13,600,000 $13,600,000 $0   $0   $0     $0 $48,100,000 $0 $48,100,000
MWRTA S12701 MWRTA CATCHCONNECT MICROTRANSIT SERVICE EXPANSION 3 MWRC 59 2023-2025 N/A $149,425 $149,425 $159,488 $159,488 $0   $0     $0 $450,163 $0 $450,163
MART S12703 MONTACHUSETT RTA MICROTRANSIT SERVICE 3 MAGIC 57 2023-2025 N/A $430,354 $430,354 $406,641 $406,641 $0   $0     $0 $1,316,061 $0 $1,316,061
Stoneham S12699 STONEHAM SHUTTLE SERVICE 4 NSPC 72 2023-2025 N/A $261,439 $261,439 $205,189 $205,189 $0   $0     $0 $796,817 $0 $796,817
CATA S12700 CATA ON DEMAND MICROTRANSIT SERVICE EXPANSION 4 NSTF 61.75 2023-2025 N/A $265,065 $265,065 $214,776 $214,776 $0   $0     $0 $813,291 $0 $813,291
Newton S12694 NEWMO MICROTRANSIT SERVICE EXPANSION 6 ICC 87 2023-2025 N/A $268,246 $268,246 $209,663 $209,663 $0   $0     $0 $890,574 $0 $890,574
Watertown S12697 PLEASANT STREET SHUTTLE SERVICE EXPANSION 6 ICC 78 2023-2025 N/A $335,434 $335,434 $228,939 $228,939 $0   $0     $0 $1,002,198 $0 $1,002,198
Watertown 607777 WATERTOWN- REHABILITATION OF MOUNT AUBURN STREET (ROUTE 16) 6 ICC 75 2023-24 75% Received $2,841,078 $3,494,249 $0 $0 $0   $0     $0 $27,246,174 ($653,171) $27,899,345
Canton S12114 ROYALL STREET SHUTTLE 6 TRIC 51 2023-24 N/A $148,542 $148,542 $0 $0 $0   $0     $0 $325,719 $0 $325,719
Regionwide S12124 COMMUNITY CONNECTIONS PROGRAM Regionwide Regionwide N/A 2025-28 N/A $641,495 $0 $1,075,304 $1,075,304 $2,500,000 $2,500,000 $2,500,000 $2,500,000 $2,500,000 $0 $6,716,799 ($1,858,505) $8,575,304
MWRTA TBD CatchConnect MicroTransit Expansion Phase 2 Regionwide MWRC 90 2024-27 N/A $0 $140,000   $132,500   $107,977       $0 $0 ($380,477) $380,477
Lynn TBD Broad Street Corridor TSP 4 ICC 88 2024 N/A $0 $297,800               $0 $0 ($297,800) $297,800
Medford TBD Medford Bicycle Parking (Tier 1) 4 ICC 84 2024 N/A $0 $29,600               $0 $0 ($29,600) $29,600
Medford TBD Medford BlueBikes Expansion 4 ICC 78 2024 N/A $0 $118,643               $0 $0 ($118,643) $118,643
Canton TBD Canton Center Bicycle Racks 6 TRIC 72 2024 N/A $0 $10,000               $0 $0 ($10,000) $10,000
Canton TBD Canton Public Schools Bike Program 6 TRIC 38 2024 N/A $0 $22,500               $0 $0 ($22,500) $22,500
Boston 606226 BOSTON- RECONSTRUCTION OF RUTHERFORD AVENUE, FROM CITY SQUARE TO SULLIVAN SQUARE 6 ICC 59 2028 25% Received R1 $0 $0 $32,783,959 $0 $33,500,000 $0 $33,500,000 $0 $33,500,000 $0 $99,783,959 $66,283,959 $33,500,000
MassDOT 608051 WILMINGTON- RECONSTRUCTION ON ROUTE 38 (MAIN STREET), FROM ROUTE 62 TO THE WOBURN C.L. 4 NSPC 59 2025-26 75% Comments $0 $0 $24,644,177 $23,731,429 $0 $0 $0 $0   $0 $24,644,177 $912,748 $23,731,429
Norwood 605857 NORWOOD- INTERSECTION IMPROVEMENTS @ ROUTE 1 & UNIVERSITY AVENUE/EVERETT STREET  5 TRIC 55 2026 25% Received R1 $0 $0 $9,000,000 $0 $15,837,870 $9,000,000 $0 $15,837,870   $0 $24,837,870 $0 $24,837,870
Regionwide S12113 TRANSIT MODERNIZATION PROGRAM Regionwide Regionwide N/A 2025-2028 Administrative $0 $0 $6,500,000 $6,500,000 $6,500,000 $6,500,000 $6,500,000 $6,500,000 $6,500,000 $0 $19,500,000 ($6,500,000) $26,000,000
MBTA S12706 FOREST HILLS IMPROVEMENT PROJECT 6 ICC N/A 2024 N/A $6,400,000 $6,400,000 $0   $0   $0     $0 $6,400,000 $0 $6,400,000
Natick 610691 Cochituate Rail Trail Extension (MBTA Station to Mechanic Street) - Natick Center Connection 3 MWRC 67 2028 25% Received $0 $0 $0   $0   $0   $6,690,043 $0 $0 ($6,690,043) $6,690,043
Bellingham 612963 Bellingham - Roadway Rehabilitation of Route 126 (Hartford Road), from 800 North of the I-495 NB off ramp to Medway T/L, including B-06-017 3 SWAP 51.8 2028 Approved $0 $0 $0   $0   $0   $10,950,000 $0 $0 ########### $10,950,000
Wakefield 613145 WAKEFIELD- COMPRHENSIVE DOWNTOWN TRANSPORTATION IMPROVEMENT PROJECT 4 NSPC 61.8 2028 Approved $0 $0 $0   $0   $0   $16,581,200 $0 $0 ########### $16,581,200
Malden 613088 Spot Pond Brook Greenway 4 ICC 73 2027 Approved $0 $0 $0   $0   $0 $3,250,000 $0 $0 $0 ($3,250,000) $3,250,000
Boston 612989 BOSTON- BRIDGE PRESERVATION, B-16-066 (38D), CAMBRIDGE STREET OVER MBTA 6 ICC 53.1 2026 Approved $0 $0 $0   $0 $15,400,000 $0     $0 $0 ########### $15,400,000
CTPS TBD BikeShare State of Good Repair Set-Aside Regionwide Regionwide N/A 2025-2028 Administrative $0 $0 $0 $1,000,000 $0 $1,000,000 $0 $1,000,000 $1,000,000 $0 $0 ($4,000,000) $4,000,000
CTPS TBD Project Design Support Pilot (FFY 2025) Regionwide Regionwide N/A 2025 Administrative $0 $0 $0 $1,500,000 $0 $0 $0     $0 $0 ($1,500,000) $1,500,000
Projects in red text were identified as being high risk for not meeting their advertisement date at February 2023 TIP readiness meeting.   2024 2025 2026 2027 2028 2024-28 Total
*Projects with an asterisk were identified as candidates to remain in current year if near-term issue resolution occurs. Total Available Regional Highway Target Funds (2024-28 TIP): $130,647,095 $128,427,689 $125,285,687 $155,132,142 ########### ###########
Indicates an increase in project cost (> $500,000 or 20% of project cost)
Indicates a project was recommended to move out to a later TIP year   Current Proposed Current Proposed Current Proposed Current Proposed Proposed Proposed
Indicates a project was recommended to move into an earlier TIP year Draft Total Programmed Regional Highway Target Funds: $117,059,590 $97,823,796 $124,612,902 $97,753,338 $123,179,070 $118,212,981 $128,586,581 $104,788,845 $136,345,243 $554,924,203
Indicates a project is proposed to be newly added to the TIP Regional Highway Target Funds Remaining (Unprogrammed): $13,587,505 $32,823,299 $3,814,787 $30,674,351 $2,106,617 $7,072,706 $26,545,561 $50,343,297 $21,706,932 $142,620,585
Indicates a project that is proposed to be newly added to the TIP and for which a project application was received by the MPO. Percent Unprogrammed 10.4% 25.1% 3.0% 23.9% 1.7% 5.6% 17.1% 32.5% 13.7% 20.4%
                           
                           
                           
Abbreviations                            
TIP Investment programs: BP = Bicycle and Pedestrian.  CC = Community Connections.  CS = Complete Streets.  II = Intersection Improvements.  MI = Major Infrastructure. 
TM = Transit Modernization
                       
                           
Metropolitan Area Planning Council (MAPC) subregions: ICC = Inner Core Committee.  MAGIC = Minuteman Advisory Group on Interlocal Coordination.  MWRC = MetroWest Regional Collaborative.  NSPC = North Suburban Planning Council.  NSTF = North Shore Task Force.  SSC = South Shore Coalition.  SWAP = SouthWest Advisory Planning Committee.  TRIC = Three Rivers Interlocal Council.                        
                           
Other abbreviations: DPH = design public hearing.  FFY = federal fiscal year.  N/A = not applicable.  PRC = MassDOT's Project Review Committee.  PS&E = Plans, Specifications, and EStimates.  R1 = resubmission.  TRD = TIP Readiness Days.