Table 1
Destination 2040 Project Status
Table 1 includes projects in the Destination 2040 long-range transportation plan as of Amendment One (endorsed by the Boston Region Metropolitan Planning Organization [MPO] in April 2020). Details about project status and cost reflect information from the Massachusetts Department of Transportation (MassDOT) Project Information system or MassDOT Transportation Improvement Program (TIP) Readiness Days, as appropriate. Not all projects in this table may be required to appear in Destination 2050, based on MPO policies adopted in October 2020 and clarified in January 2023. Some of these projects may appear in other tables in this document based on their source, characteristics, or status.
Municipality |
Proponent/Source |
Project |
MassDOT ID |
Design Status |
Funding Status |
Funding Agency |
Cost Estimate |
MAPC Subregion |
MassDOT Highway District |
Notes |
---|---|---|---|---|---|---|---|---|---|---|
Ashland |
Ashland |
Reconstruction of Pond Street |
604123 |
Under construction |
Funded FFY 2020 |
MPO |
$19,667,628 |
MWRC |
3 |
N/A |
Boston |
MassDOT |
Roadway, Ceiling, Arch, and Wall Reconstruction and Other Control Systems in Sumner Tunnel |
606476 |
Advertised for construction (6/26/2021) |
Funded FFYs 2021–23 |
MPO, MassDOT |
$136,190,450 |
ICC |
6 |
N/A |
Boston |
Massport |
Roadway Reconstruction–Cypher Street, E Street, and Fargo Street |
608807 |
PS&E Received (as of 09/28/2022) |
Funded with non-federal dollars |
Massport |
$20,287,865 |
ICC |
6 |
This project likely does not meet MPO criteria for including this project in Destination 2050. |
Boston |
Boston |
Reconstruction of Rutherford Avenue |
606226 |
25% Package Received – Resubmission (as of 10/05/2020) |
Funded FFYs 2026–27 in FFYs 2023–27 TIP |
MPO |
$176,570,936 |
ICC |
6 |
Listed in Table 2. Baseline readiness scenario for FFYs 2024-28 TIP moves first year to FFY 2028. |
Boston |
MassDOT |
Allston Multimodal Project |
606475 |
PRC Approved (03/30/2018) |
Funded in FFYs 2030–34 time band in Destination 2040 |
MassDOT |
$675,500,000 |
ICC |
6 |
Listed in Table 3. Likely to require elevated NEPA review. |
Cambridge, Somerville, Medford |
MBTA |
Green Line Extension to College Avenue with Union Square Spur |
1570 |
In service |
Funded FFYs 2016–21 |
MPO, MassDOT, MBTA |
$190,000,000 |
ICC |
6 |
N/A |
Everett |
Everett |
Reconstruction of Ferry Street |
607652 |
Under construction |
Funded FFY 2021 |
MPO |
$33,252,903 |
ICC |
4 |
N/A |
Framingham |
Framingham |
Intersection Improvements at Route 126 and Route 135/MBTA and CSX Railroad |
606109 |
PRC Approved (05/13/2010) |
Funded in FFYs 2030–34 and 2035–39 time bands in Destination 2040 |
MPO |
$115,000,000 |
MWRC |
3 |
Listed in Table 3. |
Hopkinton, Westborough |
MassDOT |
Reconstruction of Interstate 495 and Interstate 90 Interchange |
607977 |
Advertised for Construction (10/30/2021) |
Funded in FFYs 2023–27 in FFYs 2023–27 TIP |
MassDOT |
$300,942,836 |
MWRC |
3 |
Listed in Table 2. |
Lexington |
Lexington |
Route 4/225 (Bedford Street) and Hartwell Avenue (Lexington) |
TBD |
Pre-PRC Approval |
Funded in FFYs 2030–34 time band in Destination 2040 |
MPO |
TBD |
MAGIC |
4 |
Listed in Table 4. |
Lynn |
Lynn |
Reconstruction of Western Avenue |
609246 |
PRC Approved (12/06/2018) |
Funded in 2027 in FFYs 2023–27 TIP |
MPO |
$40,980,000 |
ICC |
4 |
This project likely does not meet MPO criteria for including this project in Destination 2050. |
Natick |
MassDOT |
Bridge Replacement, Route 27 (North Main Street) over Route 9 (Worcester Street), and Interchange Improvements |
605313 |
25% Package Received – Resubmission (05/16/2022) |
Funded in FFY 2024 in FFYS 2023–27 TIP |
MassDOT |
$75,677,350 |
MWRC |
3 |
Listed in Table 2. Funded with CRRSAA Funds. |
Newton, Needham |
Newton, Needham |
Reconstruction of Highland Avenue, Needham Street, and Charles River Bridge |
606635 |
Under construction |
Funded FFYs 2019–20 |
MPO |
$26,205,992 |
ICC |
6 |
N/A |
Quincy |
MassDOT |
New connection from Burgin Parkway over the MBTA |
606518 |
Construction complete |
Funded with non-federal dollars |
MassDOT |
$9,156,557 |
ICC |
6 |
N/A |
Somerville |
Somerville |
McGrath Boulevard Construction |
607981 |
PRC Approved (05/19/2014) |
Funded in 2027 in FFYs 2023–27 TIP |
MPO |
$88,250,000 |
ICC |
4 |
Listed in Table 2. |
Walpole |
Walpole |
Reconstruction on Route 1A (Main Street) |
602261 |
Under construction |
Funded in FFY 2020 |
MPO |
$19,790,904 |
TRIC |
5 |
N/A |
Watertown |
Watertown |
Rehabilitation of Mount Auburn Street (Route 16) |
607777 |
75% Package Received (as of 10/18/2022) |
Funded in 2027 in FFYs 2023–27 TIP |
MPO |
$27,899,345 |
ICC |
6 |
This project likely does not meet MPO criteria for including this project in Destination 2050. |
Woburn |
Woburn |
Bridge Replacement, New Boston Street over MBTA |
604996 |
Under construction |
Funded in FFY 2021 |
MPO |
$23,549,743 |
NSPC |
4 |
N/A |
Note: Destination 2040 references two other projects that are funded in other MPOs' LRTPs: the Southborough and Westborough—Interstate 495 and Route 9 project in Southborough and Westborough and the South Coast Rail project.
CRRSAA = Coronavirus Response and Relief Supplemental Appropriations Act. FFY = federal fiscal year. ICC = Inner Core Committee. MAGIC = Minuteman Advisory Group on Interlocal Coordination. MAPC = Metropolitan Area Planning Council. MassDOT = Massachusetts Department of Transportation. MBTA = Massachusetts Bay Transportation Authority. MPO = metropolitan planning organization. MWRC = MetroWest Regional Collaborative. N/A = not applicable. NSPC = North Suburban Planning Council. PRC = Project Review Committee. PS&E = Plans, Specifications, and Estimates. TBD = to be determined. TIP = Transportation Improvement Program. TRIC = Three Rivers Interlocal Council.
Source: Boston Region MPO staff.
Table 2
LRTP-Relevant Roadway Projects in FFYs 2023–27 TIP
Table 2 shows projects in the active (FFYs 2023–27) TIP that may meet criteria for being included in the LRTP based on MPO policies adopted in October 2020 and clarified in January 2023. Details about project status and cost reflect information from the MassDOT Project Information System or MassDOT TIP Readiness Days, as appropriate.
Municipality |
Proponent/ |
Project |
Roadway (Federal) Functional Classification* |
MassDOT ID |
Design Status |
MPO Investment Program |
Current Program Year (in FFYs 2023–27 TIP) |
Cost Estimate |
MAPC Subregion |
MassDOT Highway District |
LRTP Status |
Notes |
Boston |
Boston |
Reconstruction of Rutherford Avenue |
Principal Arterial – Other |
606226 |
25% Package Received – Resubmission 1 (as of 10/05/2020) |
Major Infrastructure |
2025–27 |
$176,570,937 |
ICC |
6 |
In Destination 2040 (in FFYs 2020–24 and 2025–29 time bands) |
Proposed for funding in FFYs 2027–30 per TIP Readiness Days. |
Hopkinton, Westborough |
MassDOT |
Reconstruction of Interstate 495 and Interstate 90 Interchange |
Interstate |
607977 |
Advertised for construction (10/30/2021) |
N/A |
2023–27 |
$300,942,837 |
MWRC |
3 |
In Destination 2040 (in FFYs 2020–24 time band) |
Funded by MassDOT. Funded FFYs 2023–27 in FFYs 2023–27 TIP. |
Natick |
MassDOT |
Bridge Replacement, Route 27 (North Main Street) over Route 9 |
Principal Arterial – Other |
605313 |
25% Package Received – Resubmission 1 (as of 05/16/2022) |
Major Infrastructure |
2024 |
$75,677,350 |
MWRC |
3 |
In Destination 2040 (in FFYs 2025–29 time band) |
Funded with CRRSAA funds. Proposed Auxiliary lanes may affect roadway capacity. |
Norwood |
Norwood |
Intersection Improvements at Route 1 and University Avenue/Everett Street |
Principal Arterial – Other |
605857 |
25% Package Received – Resubmission 1 (as of 01/05/2021) |
Intersection Improvements |
2025–26 |
$26,573,400 |
TRIC |
5 |
N/A |
Project changes capacity through the addition of travel lanes. |
Somerville |
Somerville |
McGrath Boulevard Construction |
Principal Arterial – Expressway |
607981 |
PRC Approved (05/19/2014) |
Complete Streets |
2027 |
$88,250,000 |
ICC |
4 |
In Destination 2040 (in FFYs 2025–29 and 2030–34 time bands) |
Proposed for funding in FFYs 2027–30 per TIP Readiness Days. |
Wrentham |
Wrentham |
Construction of Interstate 495/Route 1A Ramps |
Interstate |
603739 |
75% Package Comments to design engineer (as of 08/02/2022) |
Major Infrastructure |
2024 |
$20,117,638 |
SWAP |
5 |
N/A |
Proposed for funding in FFY 2024 per TIP Readiness Days. |
* The federal functional classification listed above reflects the highest classification associated with roadways included in the project.
CRRSAA = Coronavirus Response and Relief Supplemental Appropriations Act. FFY = federal fiscal year. ICC = Inner Core Committee. LRTP = Long-Range Transportation Plan. MAPC = Metropolitan Area Planning Council. MassDOT = Massachusetts Department of Transportation. MBTA = Massachusetts Bay Transportation Authority. MPO = metropolitan planning organization. MWRC = MetroWest Regional Collaborative. N/A = not applicable. NSPC = North Suburban Planning Council. PRC = Project Review Committee. SWAP = Southwest Advisory Planning Committee. TIP = Transportation Improvement Program. TRIC = Three Rivers Interlocal Council.
Source: Boston Region MPO Staff.
Table 3
LRTP-Relevant MassDOT PRC-Approved Roadway Projects
Table 3 shows projects that are not in the active (FFYs 2023-27) TIP, but (1) that have been approved by MassDOT's Project Review Committee (PRC); and (2) that may meet criteria for being included in the LRTP based on MPO policies adopted in October 2020 and clarified in January 2023. Details about project status and cost reflect information from the MassDOT Project Information system or MassDOT TIP Readiness Days, as appropriate.
Municipality |
Proponent/Source |
Project |
Roadway (Federal) Functional Classification* |
MassDOT ID |
Design Status |
Potential MPO Investment Program |
Proposed Program Year |
Cost Estimate |
MAPC Subregion |
MassDOT Highway District |
LRTP Status |
Notes |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Bellingham |
Bellingham |
Roadway Rehabilitation of Route 126 (Hartford Road), from 800 North of Interstate 495 NB off ramp to the Medway town line, including B-06-017 |
Principal Arterial/Other |
612963 |
PRC Approved (9/15/2022) |
Complete Streets |
2027 |
$10,950,000 |
SWAP |
3 |
N/A |
Project impacts on roadway capacity to be determined. |
Beverly |
Beverly |
Interchange Reconstruction at Route 128/Exit 19 at Brimbal Avenue (Phase II) |
Principal Arterial – Expressway |
607727 |
PRC Approved (2014) |
Major Infrastructure |
TBD |
$23,000,000 |
NSTF |
4 |
In Destination 2040 Project Universe (Active Highway Projects) |
Project would expand the interchange and add ramps. |
Boston |
MassDOT |
Allston Multimodal Project |
Interstate |
606475 |
PRC Approved (03/30/2018) |
N/A |
TBD |
$675,500,000 |
ICC |
6 |
Funded in FFYs 2030–34 time band in Destination 2040 (MassDOT-funded) |
NEPA Review: Environmental Impact Statement. Advertising date depends on availability of funding and completion of permitting. Earliest construction likely FFYs 2026–33. |
Boston |
Boston |
Bridge Preservation, Cambridge Street over MBTA |
Principal Arterial – Other |
612989 |
PRC Approved (12/21/2022) |
Complete Streets |
2026 |
$15,400,000 |
ICC |
6 |
N/A |
Project may add roadway capacity. |
Canton, Dedham, Norwood |
MassDOT |
Interchange Improvements at Interstate 95 / Interstate 93 / University Avenue / Interstate 95 Widening |
Interstate |
87790 |
25% submitted (7/25/2014) |
Major Infrastructure |
TBD |
$202,205,994 |
TRIC |
6 |
In Destination 2040 Project Universe (Active Highway Projects) |
Project may add roadway capacity. |
Concord |
Concord |
Reconstruction and Widening on Route 2, from Sandy Pond Road to Bridge over MBTA/B&M Railroad |
Principal Arterial Other |
608015 |
PRC approved (2014) |
Major Infrastructure |
TBD |
$8,000,000 |
MAGIC |
4 |
In Destination 2040 Project Universe (Active Highway Projects) |
N/A |
Concord |
Concord |
Improvements and Upgrades to Concord Rotary (Routes 2/2A/119) |
Principal Arterial Other |
602091 |
PRC Approved (02/25/1997) |
Major Infrastructure |
TBD |
$103,931,250 |
MAGIC |
4 |
In Destination 2040 Project Universe (Active Highway Projects) |
N/A |
Framingham |
Framingham |
Intersection Improvements at Route 126/Route 135/MBTA and CSX Railroad |
Principal Arterial/Other |
606109 |
PRC Approved 05/13/2010 |
Major Infrastructure |
TBD |
$115,000,000 |
MWRC |
3 |
Funded in FFYs 2030–34 and 2035–39 time bands in Destination 2040 (MPO-funded) |
Project impacts on roadway capacity to be determined. |
Malden Revere, |
MassDOT |
Improvements at Route 1 |
Principal Arterial – Expressway |
610543 |
PRC approved (2019) |
Major Infrastructure |
2027 |
$7,210,000 |
ICC |
4 |
In Destination 2040 Project Universe (Active Highway Projects) |
N/A |
Malden, Revere, Saugus |
MassDOT |
Reconstruction and Widening on Route 1, from Route 60 to Route 99 |
Principal Arterial – Expressway |
605012 |
PRC Approved (09/10/2007) |
Major Infrastructure |
TBD |
$172,500,000 |
ICC |
4 |
In Destination 2040 Project Universe (Active Highway Projects) |
N/A |
Randolph |
Randolph |
Interstate 93/Route 24 Interchange |
Interstate |
610540 |
PRC Approved (08/15/2019) |
Major Infrastructure |
TBD |
$14,420,700 |
TRIC |
6 |
N/A |
Project may include capacity adding elements. However, per District 6, This specific project has not seen any advancement since initiation. Some elements of the scope have been implemented through interim improvements. Project may be deactivated. |
Revere, Saugus |
Revere, Saugus |
Roadway Widening on Route 1 North (Phase 2) |
Principal Arterial – Expressway |
611999 |
PRC approved (2021) |
Major Infrastructure |
TBD |
$2,397,600 |
ICC |
4 |
In Destination 2040 Project Universe (Active Highway Projects) |
N/A |
Salem |
MassDOT |
Reconstruction of Bridge Street, from Flint Street to Washington Street |
Principal Arterial Other |
5399 |
25% submitted (8/20/2004) |
Complete Streets |
TBD |
$24,810,211 |
NSTF |
4 |
In Destination 2040 Project Universe (Active Highway Projects) |
Project would widen Bridge Street from two to four lanes. |
Woburn, Reading, Stoneham, Wakefield |
MassDOT |
Interchange Improvements to Interstate 93/Interstate 95 |
Interstate |
605605 |
PRC-Approved 05/14/2009 |
Major Infrastructure |
TBD |
$276,708,768 |
NSPC |
4 |
In Destination 2040 Project Universe (Active Highway Projects) |
Project may add roadway capacity. |
* The federal functional classification listed above reflects the highest classification associated with roadways included in the project.
FFY = federal fiscal year. ICC = Inner Core Committee. LRTP = Long-Range Transportation Plan. MAGIC = Minuteman Advisory Group on Interlocal Coordination. MAPC = Metropolitan Area Planning Council. MassDOT = Massachusetts Department of Transportation. MBTA = Massachusetts Bay Transportation Authority. MPO = metropolitan planning organization. MWRC = MetroWest Regional Collaborative. N/A = not applicable. NEPA = National Environmental Policy Act. NSPC = North Suburban Planning Council. PRC = Project Review Committee. SWAP = Southwest Advisory Planning Committee. TBD = to be determined.
Table 4
LRTP-Relevant Conceptual Roadway Projects
Table 4 shows projects that may meet criteria for being included in the LRTP (based on MPO policies adopted in October 2020 and clarified in January 2023) that have not yet been submitted to MassDOT's Project Review Committee (PRC) or are otherwise in a conceptual stage.
Municipality |
Proponent/Source |
Project |
Roadway Classification |
Potential MPO Investment Program |
Design Status |
Program Year |
Cost Estimate |
MAPC Subregion |
MassDOT Highway District |
LRTP Status |
Notes |
---|---|---|---|---|---|---|---|---|---|---|---|
Boston |
TBD |
Charlestown Haul Road |
Minor arterial, but proximate to the Tobin Bridge |
TBD |
Pre-PRC Approval |
N/A |
TBD |
ICC |
6 |
In Destination 2040 Project Universe (Conceptual Highway Projects) |
Project would construct an off-road truck route on the alignment of a freight spur that leads to Massport's Moran Terminal on the Mystic River near the Tobin Bridge. |
Braintree |
MassDOT |
I-93/Route 3 Interchange (Braintree Split) |
Interstate |
Major Infrastructure |
Pre-PRC Approval |
N/A |
$53,289,000 |
SSC |
6 |
In Destination 2040 Project Universe (Conceptual Highway Projects) |
Proposed improvements include the addition of a travel lane, a pair of auxiliary lanes, and associated acceleration lanes. A new entrance ramp is proposed along with restricting the use of an existing ramp. |
Braintree, Weymouth, Norwell |
MassDOT |
Route 3 South Widening (Braintree to Weymouth) |
Principal Arterial – Expressway |
Major Infrastructure |
Pre-PRC Approval |
N/A |
$800,000,000 |
SSC |
6 |
In Destination 2040 Project Universe (Conceptual Highway Projects) |
District 6 notes that this project has not advanced. |
Lexington |
Lexington |
Route 4/225 (Bedford Street) and Hartwell Avenue (Bedford/Hartwell Complete Streets Project) |
Principal Arterial – Other |
Major Infrastructure |
Pre-PRC Approval |
N/A |
TBD |
MAGIC |
4 |
In Destination 2040 (in FFYs 2030–34 time band) |
Specific nature of capacity impacts to be determined. |
Lynnfield, Reading |
TBD |
I-95 Capacity Improvements |
Interstate |
Major Infrastructure |
Pre-PRC Approval |
N/A |
$198,443,000 |
NSPC |
4 |
In Destination 2040 Project Universe (Conceptual Highway Projects) |
Specific nature of capacity impacts to be determined. |
Newton |
Newton |
New Route 128 Ramp to Riverside Station |
Interstate |
Major Infrastructure |
Pre-PRC Approval |
N/A |
$10,000,055 |
ICC |
6 |
In Destination 2040 Project Universe (Conceptual Highway Projects) |
Project status to be determined. |
Wilmington |
Wilmington |
I-93/Route 125/Ballardvale Street |
Interstate |
Major Infrastructure |
Pre-PRC Approval |
N/A |
TBD |
NSPC |
4 |
In Destination 2040 Project Universe (Conceptual Highway Projects) |
Specific nature of capacity impacts to be determined. |
Note: The federal functional classification listed above reflects the highest classification associated with roadways included in the project.
FFY = federal fiscal year. ICC = Inner Core Committee. MAGIC = Minuteman Advisory Group on Interlocal Coordination. MAPC = Metropolitan Area Planning Council. MassDOT = Massachusetts Department of Transportation. Massport = Massachusetts Port Authority. MWRC = MetroWest Regional Collaborative. NSPC = North Suburban Planning Council. PRC = Project Review Committee. SSC = South Shore Committee. SWAP = Southwest Advisory Planning Committee. Transportation Improvement Program.