Draft Destination 2050 Universe of Roadway Projects

 

Table 1
Destination 2040 Project Status

 

Table 1 includes projects in the Destination 2040 long-range transportation plan as of Amendment One (endorsed by the Boston Region Metropolitan Planning Organization [MPO] in April 2020). Details about project status and cost reflect information from the Massachusetts Department of Transportation (MassDOT) Project Information system or MassDOT Transportation Improvement Program (TIP) Readiness Days, as appropriate. Not all projects in this table may be required to appear in Destination 2050, based on MPO policies adopted in October 2020 and clarified in January 2023. Some of these projects may appear in other tables in this document based on their source, characteristics, or status.

 

Municipality

Proponent/Source

Project

MassDOT ID

Design Status

Funding Status

Funding Agency

Cost Estimate

MAPC Subregion

MassDOT Highway District

Notes

Ashland

Ashland

Reconstruction of Pond Street

604123

Under construction

Funded FFY 2020

MPO

$19,667,628

MWRC

3

N/A

Boston

MassDOT

Roadway, Ceiling, Arch, and Wall Reconstruction and Other Control Systems in Sumner Tunnel

606476

Advertised for construction (6/26/2021)

Funded FFYs 2021–23

MPO, MassDOT

$136,190,450

ICC

6

N/A

Boston

Massport

Roadway Reconstruction–Cypher Street, E Street, and Fargo Street 

(includes Destination 2040 project named Cypher Street Extension)

608807

PS&E Received (as of 09/28/2022)

Funded with non-federal dollars

Massport

$20,287,865

ICC

6

This project likely does not meet MPO criteria for including this project in Destination 2050.

Boston

Boston

Reconstruction of Rutherford Avenue

606226

25% Package Received – Resubmission (as of 10/05/2020)

Funded FFYs 2026–27 in FFYs 2023–27 TIP

MPO

$176,570,936

ICC

6

Listed in Table 2. Baseline readiness scenario for FFYs 2024-28 TIP moves first year to FFY 2028.

Boston

MassDOT

Allston Multimodal Project

606475

PRC Approved (03/30/2018)

Funded in FFYs 2030–34 time band in Destination 2040

MassDOT

$675,500,000

ICC

6

Listed in Table 3. Likely to require elevated NEPA review.

Cambridge, Somerville, Medford

MBTA

Green Line Extension to College Avenue with Union Square Spur

1570

In service

Funded FFYs 2016–21

MPO, MassDOT, MBTA

$190,000,000
(MPO contribution)

ICC

6

N/A

Everett

Everett

Reconstruction of Ferry Street

607652

Under construction

Funded FFY 2021

MPO

$33,252,903

ICC

4

N/A

Framingham

Framingham

Intersection Improvements at Route 126 and Route 135/MBTA and CSX Railroad

606109

PRC Approved (05/13/2010)

Funded in FFYs 2030–34 and 2035–39 time bands in Destination 2040

MPO

$115,000,000

MWRC

3

Listed in Table 3.

Hopkinton, Westborough

MassDOT

Reconstruction of Interstate 495 and Interstate 90 Interchange

607977

Advertised for Construction (10/30/2021)

Funded in FFYs 2023–27 in FFYs 2023–27 TIP

MassDOT

$300,942,836

MWRC

3

Listed in Table 2.

Lexington

Lexington

Route 4/225 (Bedford Street) and Hartwell Avenue (Lexington)

TBD

Pre-PRC Approval

Funded in FFYs 2030–34 time band in Destination 2040

MPO

TBD

MAGIC

4

Listed in Table 4.

Lynn

Lynn

Reconstruction of Western Avenue

609246

PRC Approved (12/06/2018)

Funded in 2027 in FFYs 2023–27 TIP

MPO

$40,980,000

ICC

4

This project likely does not meet MPO criteria for including this project in Destination 2050.

Natick

MassDOT

Bridge Replacement, Route 27 (North Main Street) over Route 9 (Worcester Street), and Interchange Improvements

605313

25% Package Received – Resubmission (05/16/2022)

Funded in FFY 2024 in FFYS 2023–27 TIP

MassDOT

$75,677,350

MWRC

3

Listed in Table 2. Funded with CRRSAA Funds.

Newton, Needham

Newton, Needham

Reconstruction of Highland Avenue, Needham Street, and Charles River Bridge

606635

Under construction

Funded FFYs 2019–20

MPO

$26,205,992

ICC

6

N/A

Quincy

MassDOT

New connection from Burgin Parkway over the MBTA

606518

Construction complete

Funded with non-federal dollars

MassDOT

$9,156,557

ICC

6

N/A

Somerville

Somerville

McGrath Boulevard Construction

607981

PRC Approved (05/19/2014)

Funded in 2027 in FFYs 2023–27 TIP

MPO

$88,250,000

ICC

4

Listed in Table 2.

Walpole

Walpole

Reconstruction on Route 1A (Main Street)

602261

Under construction

Funded in FFY 2020

MPO

$19,790,904

TRIC

5

N/A

Watertown

Watertown

Rehabilitation of Mount Auburn Street (Route 16)

607777

75% Package Received (as of 10/18/2022)

Funded in 2027 in FFYs 2023–27 TIP

MPO

$27,899,345

ICC

6

This project likely does not meet MPO criteria for including this project in Destination 2050.

Woburn

Woburn

Bridge Replacement, New Boston Street over MBTA

604996

Under construction

Funded in FFY 2021

MPO

$23,549,743

NSPC

4

N/A

Note: Destination 2040 references two other projects that are funded in other MPOs' LRTPs: the Southborough and Westborough—Interstate 495 and Route 9 project in Southborough and Westborough and the South Coast Rail project.

CRRSAA = Coronavirus Response and Relief Supplemental Appropriations Act. FFY = federal fiscal year. ICC = Inner Core Committee. MAGIC = Minuteman Advisory Group on Interlocal Coordination. MAPC = Metropolitan Area Planning Council. MassDOT = Massachusetts Department of Transportation. MBTA = Massachusetts Bay Transportation Authority. MPO = metropolitan planning organization. MWRC = MetroWest Regional Collaborative. N/A = not applicable. NSPC = North Suburban Planning Council. PRC = Project Review Committee. PS&E = Plans, Specifications, and Estimates. TBD = to be determined. TIP = Transportation Improvement Program. TRIC = Three Rivers Interlocal Council.

Source: Boston Region MPO staff.

 


 

Table 2
LRTP-Relevant Roadway Projects in FFYs 2023–27 TIP

 

Table 2 shows projects in the active (FFYs 202327) TIP that may meet criteria for being included in the LRTP based on MPO policies adopted in October 2020 and clarified in January 2023. Details about project status and cost reflect information from the MassDOT Project Information System or MassDOT TIP Readiness Days, as appropriate.

 

Municipality

Proponent/
Source

Project

Roadway (Federal) Functional Classification*

MassDOT ID

Design Status

MPO Investment Program

Current Program Year (in FFYs 2023–27 TIP)

Cost Estimate

MAPC Subregion

MassDOT Highway District

LRTP Status

Notes

Boston

Boston

Reconstruction of Rutherford Avenue

Principal Arterial – Other

606226

25% Package Received –  Resubmission 1 (as of 10/05/2020)

Major Infrastructure

2025–27

$176,570,937

ICC

6

In Destination 2040 (in FFYs 2020–24 and 2025–29 time bands)

Proposed for funding in FFYs 2027–30 per TIP Readiness Days.

Hopkinton, Westborough

MassDOT

Reconstruction of Interstate 495 and Interstate 90 Interchange

Interstate

607977

Advertised for construction (10/30/2021)

N/A

2023–27

$300,942,837

MWRC

3

In Destination 2040 (in FFYs 2020–24 time band)

Funded by MassDOT. Funded FFYs 2023–27 in FFYs 2023–27 TIP.

Natick

MassDOT

Bridge Replacement, Route 27 (North Main Street) over Route 9

Principal Arterial – Other

605313

25% Package Received – Resubmission 1 (as of 05/16/2022)

Major Infrastructure

2024

$75,677,350

MWRC

3

In Destination 2040 (in FFYs 2025–29 time band)

Funded with CRRSAA funds. Proposed Auxiliary lanes may affect roadway capacity.

Norwood

Norwood

Intersection Improvements at Route 1 and University Avenue/Everett Street

Principal Arterial – Other

605857

25% Package Received – Resubmission 1 (as of 01/05/2021)

Intersection Improvements

2025–26

$26,573,400

TRIC

5

N/A

Project changes capacity through the addition of travel lanes.

Somerville

Somerville

McGrath Boulevard Construction

Principal Arterial – Expressway

607981

PRC Approved (05/19/2014)

Complete Streets

2027

$88,250,000

ICC

4

In Destination 2040 (in FFYs 2025–29 and 2030–34 time bands)

Proposed for funding in FFYs 2027–30 per TIP Readiness Days.

Wrentham

Wrentham

Construction of Interstate 495/Route 1A Ramps

Interstate

603739

75% Package Comments to design engineer (as of 08/02/2022)

Major Infrastructure

2024

$20,117,638

SWAP

5

N/A

Proposed for funding in FFY 2024 per TIP Readiness Days.

* The federal functional classification listed above reflects the highest classification associated with roadways included in the project.

CRRSAA = Coronavirus Response and Relief Supplemental Appropriations Act. FFY = federal fiscal year. ICC = Inner Core Committee. LRTP = Long-Range Transportation Plan. MAPC = Metropolitan Area Planning Council. MassDOT = Massachusetts Department of Transportation. MBTA = Massachusetts Bay Transportation Authority. MPO = metropolitan planning organization. MWRC = MetroWest Regional Collaborative. N/A = not applicable. NSPC = North Suburban Planning Council. PRC = Project Review Committee. SWAP = Southwest Advisory Planning Committee. TIP = Transportation Improvement Program. TRIC = Three Rivers Interlocal Council.

Source: Boston Region MPO Staff.


 

 

Table 3
LRTP-Relevant MassDOT PRC-Approved Roadway Projects

 

Table 3 shows projects that are not in the active (FFYs 2023-27) TIP, but (1) that have been approved by MassDOT's Project Review Committee (PRC); and (2) that may meet criteria for being included in the LRTP based on MPO policies adopted in October 2020 and clarified in January 2023. Details about project status and cost reflect information from the MassDOT Project Information system or MassDOT TIP Readiness Days, as appropriate.

 

Municipality

Proponent/Source

Project

Roadway (Federal) Functional Classification*

MassDOT ID

Design Status

Potential MPO Investment Program

Proposed Program Year

Cost Estimate

MAPC Subregion

MassDOT Highway District

LRTP Status

Notes

Bellingham

Bellingham

Roadway Rehabilitation of Route 126 (Hartford Road), from 800 North of Interstate 495 NB off ramp to the Medway town line, including B-06-017

Principal Arterial/Other

612963

PRC Approved (9/15/2022)

Complete Streets

2027

$10,950,000

SWAP

3

N/A

Project impacts on roadway capacity to be determined.

Beverly

Beverly

Interchange Reconstruction at Route 128/Exit 19 at Brimbal Avenue (Phase II)

Principal Arterial – Expressway

607727

PRC Approved (2014)

Major Infrastructure

TBD

$23,000,000

NSTF

4

In Destination 2040 Project Universe (Active Highway Projects)

Project would expand the interchange and add ramps.

Boston

MassDOT

Allston Multimodal Project

Interstate

606475

PRC Approved (03/30/2018)

N/A

TBD

$675,500,000

ICC

6

Funded in FFYs 2030–34 time band in Destination 2040 (MassDOT-funded)

NEPA Review: Environmental Impact Statement. Advertising date depends on availability of funding and completion of permitting. Earliest construction likely FFYs 2026–33.

Boston

Boston

Bridge Preservation, Cambridge Street over MBTA

Principal Arterial – Other

612989

PRC Approved

(12/21/2022)

Complete Streets

2026

$15,400,000

ICC

6

N/A

Project may add roadway capacity.

Canton, Dedham, Norwood

MassDOT

Interchange Improvements at Interstate 95 / Interstate 93 / University Avenue / Interstate 95 Widening

Interstate

87790

25% submitted (7/25/2014)

Major Infrastructure

TBD

$202,205,994

TRIC

6

In Destination 2040 Project Universe (Active Highway Projects)

Project may add roadway capacity.

Concord

Concord

Reconstruction and Widening on Route 2, from Sandy Pond Road to Bridge over MBTA/B&M Railroad

Principal Arterial Other

608015

PRC approved (2014)

Major Infrastructure

TBD

$8,000,000

MAGIC

4

In Destination 2040 Project Universe (Active Highway Projects)

N/A

Concord

Concord

Improvements and Upgrades to Concord Rotary (Routes 2/2A/119)

Principal Arterial Other

602091

PRC Approved (02/25/1997)

Major Infrastructure

TBD

$103,931,250

MAGIC

4

In Destination 2040 Project Universe (Active Highway Projects)

N/A

Framingham

Framingham

Intersection Improvements at Route 126/Route 135/MBTA and CSX Railroad

Principal Arterial/Other

606109

PRC Approved 05/13/2010

Major Infrastructure

TBD

$115,000,000

MWRC

3

Funded in FFYs 2030–34 and 2035–39 time bands in Destination 2040 (MPO-funded)

Project impacts on roadway capacity to be determined.

Malden Revere,

MassDOT

Improvements at Route 1
NB (In Destination 2040, Improvements on Route 1 NB Add-A-Lane)

Principal Arterial – Expressway

610543

PRC approved (2019)

Major Infrastructure

2027

$7,210,000

ICC

4

In Destination 2040 Project Universe (Active Highway Projects)

N/A

Malden, Revere, Saugus

MassDOT

Reconstruction and Widening on Route 1, from Route 60 to Route 99

Principal Arterial – Expressway

605012

PRC Approved (09/10/2007)

Major Infrastructure

TBD

$172,500,000

ICC

4

In Destination 2040 Project Universe (Active Highway Projects)

N/A

Randolph

Randolph

Interstate 93/Route 24 Interchange

Interstate

610540

PRC Approved (08/15/2019)

Major Infrastructure

TBD

$14,420,700

TRIC

6

N/A

Project may include capacity adding elements. However, per District 6, This specific project has not seen any advancement since initiation. Some elements of the scope have been implemented through interim improvements. Project may be deactivated.

Revere, Saugus

Revere, Saugus

Roadway Widening on Route 1 North (Phase 2)

Principal Arterial – Expressway

611999

PRC approved (2021)

Major Infrastructure

TBD

$2,397,600

ICC

4

In Destination 2040 Project Universe (Active Highway Projects)

N/A

Salem

MassDOT

Reconstruction of Bridge Street, from Flint Street to Washington Street

Principal Arterial Other

5399

25% submitted (8/20/2004)

Complete Streets

TBD

$24,810,211

NSTF

4

In Destination 2040 Project Universe (Active Highway Projects)

Project would widen Bridge Street from two to four lanes.

Woburn, Reading, Stoneham, Wakefield

MassDOT

Interchange Improvements to Interstate 93/Interstate 95

Interstate

605605

PRC-Approved 05/14/2009

Major Infrastructure

TBD

$276,708,768

NSPC

4

In Destination 2040 Project Universe (Active Highway Projects)

Project may add roadway capacity.

* The federal functional classification listed above reflects the highest classification associated with roadways included in the project.

FFY = federal fiscal year. ICC = Inner Core Committee. LRTP = Long-Range Transportation Plan. MAGIC = Minuteman Advisory Group on Interlocal Coordination. MAPC = Metropolitan Area Planning Council. MassDOT = Massachusetts Department of Transportation. MBTA = Massachusetts Bay Transportation Authority. MPO = metropolitan planning organization. MWRC = MetroWest Regional Collaborative. N/A = not applicable. NEPA = National Environmental Policy Act. NSPC = North Suburban Planning Council. PRC = Project Review Committee. SWAP = Southwest Advisory Planning Committee. TBD = to be determined.

 


 

 

Table 4
LRTP-Relevant Conceptual Roadway Projects

Table 4 shows projects that may meet criteria for being included in the LRTP (based on MPO policies adopted in October 2020 and clarified in January 2023) that have not yet been submitted to MassDOT's Project Review Committee (PRC) or are otherwise in a conceptual stage.

Municipality

Proponent/Source

Project

Roadway Classification

Potential MPO Investment Program

Design Status

Program Year

Cost Estimate

MAPC Subregion

MassDOT Highway District

LRTP Status

Notes

Boston

TBD

Charlestown Haul Road

Minor arterial, but proximate to the Tobin Bridge

TBD

Pre-PRC Approval

N/A

TBD

ICC

6

In Destination 2040 Project Universe (Conceptual Highway Projects)

Project would construct an off-road truck route on the alignment of a freight spur that leads to Massport's Moran Terminal on the Mystic River near the Tobin Bridge.

Braintree

MassDOT

I-93/Route 3 Interchange (Braintree Split)

Interstate

Major Infrastructure

Pre-PRC Approval

N/A

$53,289,000

(estimate from 2019 Destination 2040  Universe)

SSC

6

In Destination 2040 Project Universe (Conceptual Highway Projects)

Proposed improvements include the addition of a travel lane, a pair of auxiliary lanes, and associated acceleration lanes. A new entrance ramp is proposed along with restricting the use of an existing ramp.

District 6 notes that this project has not advanced.

Braintree, Weymouth, Norwell

MassDOT

Route 3 South Widening (Braintree to Weymouth)

Principal Arterial – Expressway

Major Infrastructure

Pre-PRC Approval

N/A

$800,000,000

(estimate from 2019 Destination 2040  Universe)

SSC

6

In Destination 2040 Project Universe (Conceptual Highway Projects)

District 6 notes that this project has not advanced.

Lexington

Lexington

Route 4/225 (Bedford Street) and Hartwell Avenue (Bedford/Hartwell Complete Streets Project)

Principal Arterial – Other

Major Infrastructure

Pre-PRC Approval

N/A

TBD

MAGIC

4

In Destination 2040 (in FFYs 2030–34 time band)

Specific nature of capacity impacts to be determined.

Lynnfield, Reading

TBD

I-95 Capacity Improvements

Interstate

Major Infrastructure

Pre-PRC Approval

N/A

$198,443,000

(estimate from 2019 Destination 2040  Universe)

NSPC

4

In Destination 2040 Project Universe (Conceptual Highway Projects)

Specific nature of capacity impacts to be determined.

Newton

Newton

New Route 128 Ramp to Riverside Station

Interstate

Major Infrastructure

Pre-PRC Approval

N/A

$10,000,055

(estimate from 2019 Destination 2040  Universe)

ICC

6

In Destination 2040 Project Universe (Conceptual Highway Projects)

Project status to be determined.

Wilmington

Wilmington

I-93/Route 125/Ballardvale Street

Interstate

Major Infrastructure

Pre-PRC Approval

N/A

TBD

NSPC

4

In Destination 2040 Project Universe (Conceptual Highway Projects)

Specific nature of capacity impacts to be determined.

Note: The federal functional classification listed above reflects the highest classification associated with roadways included in the project.

FFY = federal fiscal year. ICC = Inner Core Committee. MAGIC = Minuteman Advisory Group on Interlocal Coordination. MAPC = Metropolitan Area Planning Council. MassDOT = Massachusetts Department of Transportation. Massport = Massachusetts Port Authority. MWRC = MetroWest Regional Collaborative. NSPC = North Suburban Planning Council. PRC = Project Review Committee. SSC = South Shore Committee. SWAP = Southwest Advisory Planning Committee. Transportation Improvement Program.