Projects grouped by MAPC subregion and by MPO Investment Program
This table contains unprogrammed projects in the Boston region that may be considered for evaluation in the FFYs 2024-28 TIP cycle. Not all projects listed in this table will be evaluated for funding in the FFYs 2024-8 TIP, as projects must be PRC approved and submit sufficient project documentation prior to scoring. The MPO has also established a policy to prioritize projects that have reached the 25% design submission stage for funding. This list is subject to change as more project information is received.
Key | |
Evaluated for FFYs 2023-27 TIP | |
New project in TIP universe for FFYs 2024-28 TIP | |
In 2023-27 universe, not evaluated |
Municipality | Project Proponent | Project Name | PROJIS | Design Status (as of 10/6/21) | Year Added to Universe | Cost Estimate | Highway District | Notes | Previous Evaluation Score |
Inner Core | |||||||||
Complete Streets | |||||||||
Boston | Boston | Reconstruction of Albany Street | N/A | Pre-PRC | 2021 | N/A | 6 | Pursuing 2022 PRC approval. | N/A |
Boston | MassDOT | Reconstruction on Gallivan Boulevard (Route 203), from Neponset Circle to East of Morton Street Intersection | 606896 | PRC approved (2012) | 2018 | $11,500,000 | 6 | Resulted from FFY 2012 Addressing Priority Corridors MPO Study | N/A |
Boston | MassDOT | Improvements on Morton Street (Route 203), from West of Gallivan Boulevard to Shea Circle | 606897 | PRC approved (2012) | 2018 | $11,500,000 | 6 | Resulted from FFY 2012 Addressing Priority Corridors MPO Study | N/A |
Boston | Boston | Roadway Improvements along Commonwealth Avenue (Route 30), from Alcorn Street to Warren/Kelton Streets (Phase 3 & Phase 4) | 608449 | 25% submitted (9/28/2017) |
2017 or earlier | $31,036,006 | 6 | Last scored for FFYs 2020-24 TIP. | 56 |
Boston | MassDOT | Intersection & Signal Improvements at VFW Parkway and Spring Street | 607759 | 25% Package Received - R1 (3/09/2022) | 2022 | $4,526,907 | 6 | N/A | |
Boston | MassDOT | Gallivan Boulevard (Route 203) Safety Improvements, from Washington Street to Granite Avenue | 610650 | PRC approved (2019) | 2019 | $5,750,000 | 6 | Priority for District 6. Road safety audit being initiated. | N/A |
Brookline | Brookline | Boylston Street (High Street to Brington Road) Complete Streets Improvements | N/A | Pre-PRC | 2022 | $3,500,000 | 6 | Ped crossings, bike lanes, street trees. Design through Toole with some facilitation from MassDOT. Three options were pushed through and endorsed by the Select Board. Town met with District 6 to run through this. Should be in PRC soon. | N/A |
Brookline | Brookline | Davis Street Path Restoration and Reconstruction of the Davis Street Path Bridge over MBTA | N/A | Pre-PRC | 2022 | $12,000,000 | 6 | Conceptual stage. Brookline is investigating avenues to use federal discretionary grant funding to advance this project. Potential for bundling with Boylston Street work above. | N/A |
Chelsea | Chelsea | Reconstruction of Spruce Street, from Everett Avenue to Williams Street | 610675 | PRC approved (2019) | 2019 | $5,408,475 | 6 | N/A | |
Chelsea | Chelsea | Reconstruction of Everett Avenue and 3rd Street, from Broadway to Ash Street | N/A | Pre-PRC | 2020 | N/A | 6 | N/A | |
Chelsea | Chelsea | Reconstruction of Marginal Street | N/A | Pre-PRC | 2019 | N/A | 6 | N/A | |
Lynn, Salem | MassDOT | Reconstruction of Route 107 | 608927 | PRC approved (2017) | 2020 | $38,155,000 | 4 | N/A | |
Malden | Malden | Broadway Corridor Reconstruction | N/A | Pre-PRC | 2022 | N/A | 4 | Malden is currently holding community meetings to discuss this project, with the most recent one being held 10.25.2022. | N/A |
Melrose | Melrose | Reconstruction of Lebanon Street, from Lynde Street to Malden City Line | 612534 | PRC approved (2/10/2022) | 2020 | $3,742,432 | 4 | N/A | |
Newton | Newton | Reconstruction of Washington Street, from Church Street to Chestnut Street | N/A | Pre-PRC | 2020 | N/A | 6 | N/A | |
Revere | Revere | Reconstruction of Ocean Ave, Revere Street, and Revere Beach Boulevard | N/A | Pre-PRC | 2020 | N/A | 4 | Project at conceptual stage with schematics, needs full design - investigating roundabout. Key East/West connection. | N/A |
Winthrop | Winthrop | Reconstruction & Improvements on Route 145 | N/A | PRC approved (2019) | 2019 | $7,565,512 | 6 | N/A | |
Intersection Improvements | |||||||||
Boston, Brookline | Boston, Brookline | Mountfort St. & Commonwealth Ave. Connection | 608956 | PRC approved (2017) | 2018 | $916,883 | 6 | Preliminary design. | N/A |
Medford | Medford | Intersection Improvements at Main Street and South Street | 611974 | PRC approved (2021) | 2019 | $8,498,000 | 4 | Project location studied by CTPS. Priority for municipality. Design is in progress, and eventually the City will work with MassDOT to fund construction. | N/A |
Newton | MassDOT | Route 16 at Quinobequin Road | 612613 | PRC approved (2/10/2022) | 2022 | $4,350,000 | 6 | Reconfiguration of the interchange may result in consideration of this project for the LRTP. | |
Quincy | MassDOT | Intersection Improvements at Route 3A (Southern Artery) and Broad Street | 608569 | PRC approved (2016) | 2020 | $2,900,000 | 6 | Priority for District 6. | N/A |
Quincy | Quincy | Intersection Improvements at Willard Street and Ricciuti Drive | 610823 | 25% Package Received (9/28/2022) | 2020 | $1,544,650 | 6 | 25% design complete. PM is Kathy Dougherty. | N/A |
Quincy | Quincy | Merrymount Parkway Phase II | N/A | Pre-PRC | 2022 | N/A | 6 | December PRC. | N/A |
Bicycle and Pedestrian | |||||||||
Boston | Boston | Fenway Multi-Use Path Phase III | N/A | Pre-PRC | 2021 | N/A | 6 | Project at conceptual stage. | N/A |
Brookline | Brookline | Beacon Street Bridle Pathway | N/A | Pre-PRC | 2022 | N/A | 6 | Project in conceptual design through Toole, receipt of a MassTrails grant in 2020 for feasibility study. Limits would be Audubon Circle to Cleveland Circle. | N/A |
Everett, Somerville | DCR | Mystic River Bicycle and Pedestrian Crossing | 612004 | PRC approved (2021) | 2021 | $38,218,334 | 4 | N/A | |
Lynn, Nahant | Lynn, Nahant | Northern Strand Extension | 610919 | DPH (11/17/2021) | 2020 | $9,363,750 | 4 | N/A | |
Medford | Medford | Wellington Phase 4 Shared Use Path | 613082 | Pre-PRC | 2022 | $1,195,000 | 4 | ID # is not yet in PINFO. Initiated on 11/3/2022. Includes an earmark and Gaming Commission money. | N/A |
Medford | Medford | MacDonald Park Pedestrian Bridge | N/A | Pre-PRC | 2022 | $800,000 | 4 | In DCR park, City is requesting expansion of bridge to 10-12feet in width to coordinate with shared use pathway. | N/A |
Major Infrastructure | |||||||||
Boston, Chelsea | Boston | Bridge Rehabilitation and Fender Pier Replacement, Meridian Street Over Chelsea Creek (Andrew P. McArdle Bridge) | 600637 | PRC Approved (2/10/2022) | 2021 | $97,538,787 | 6 | N/A | |
Cambridge | DCR | Intersection Improvements at Fresh Pond Parkway/Gerry's Landing Road, from Brattle Street to Memorial Drive | 609290 | PRC approved (2018) | 2019 | $7,000,000 | 6 | Short-term improvements being initiated. | N/A |
Revere, Malden | MassDOT | Improvements on Route 1 (NB) Add-A-Lane | 610543 | PRC approved (2019) | 2019 | $7,210,000 | 4 | Project is not programmed in Destination 2040. It is located on a regionally significant roadway. If this work includes capacity-adding elements, and it is programmed in the TIP, it will need to be included in Destination 2050. | N/A |
Newton | MassDOT | Traffic Signal and Safety Improvements at Interchange 127 (Newton Corner) | 609288 | PRC approved (2018) | 2019 | $14,000,000 | 6 | N/A | |
Medford | Medford | Roosevelt Circle Interchange Reconfiguration | N/A | Pre-PRC | 2022 | TBD | 4 | As discussed on 11.4.2022 with the City of Medford, the City is looking to reconfigure the ramps and adjacent local roadways to improve traffic safety following the results of a RSA along this corridor. Includes improvements for bicycle, pedestrian, and transit access. Given the state of repair on the bridges, this may be coordinated with bridge rehabilitation work for these structures over I-93. | N/A |
Boston | Boston | Cambridge Street Bridge Replacement - Charlestown | N/A | Pre-PRC | 2022 | N/A | 6 | City wants this programmed to advertise this before Rutherford Avenue enters construction. This is a difficult bridge under I-93 and next to Sullivan Square. | N/A |
Revere | Revere | Route 1A Improvement and Reconfiguration | N/A | Pre-PRC | 2022 | $9-12,000,000 | 4 | Project is in conceptual design stage. The priority is to reconfigure the loop ramps at the General Edwards Bridge to facilitate redevelopment of the area, for which there are already parcel developments planned. The reconfiguration will entail construction of a new roundabout and improved pedestrian crossings to improve access to the riverfront and Point of Pines area along Revere. Per the City, this reconfiguration is intended to work with the Lynnway Multimodal Corridor improvements, but will also not impact construction for the General Edwards Bridge replacement. | N/A |
Revere, Saugus | Revere, Saugus | Roadway Widening on Route 1 North (Phase 2) | 611999 | PRC approved (2021) | 2021 | $2,397,600 | 4 | Project is not programmed in Destination 2040. It Is on a regionally-significant roadway and would add roadway capacity. If programmed in the TIP, this project will also need to be included in Destination 2050. Robins Road to Route 99 interchange are the limits. |
N/A |
Minuteman Advisory Group on Interlocal Coordination | |||||||||
Complete Streets | |||||||||
Bedford | Bedford | Roadway Reconstruction of Route 4/225 (The Great Road) | 612739 | PRC approved (5/12/2022) | 2022 | $10,899,448 | 4 | Limits appear to go from North Road to match line near Loomis Street. SRTS project completed in the area under 608000. | N/A |
Intersection Improvements | |||||||||
Littleton | Littleton | Intersection Improvements at Route 119/Beaver Brook Road | 610702 | PRC approved (2020) | 2020 | $3,120,110 | 3 | MassDOT agreed to fund design after 25% design approved. As of October 2022, the project remains in preliminary design. | N/A |
Bicycle and Pedestrian | |||||||||
Bedford | Bedford | Minuteman Bikeway Extension, From Loomis Street to Concord Road (Route 62) | 607738 | 47 | 2022 | $11,218,186 | 4 | Local concerns about permitting. Previously programmed in FY23-27, dropped due to public opposition. Failed to achieve 2/3rds majority in town meeting on 11.14.2022. | N/A |
Concord | Concord | Assabet River Multi-Use Trail and Bridge Construction | 612870 | PRC approved (8/29/2022) | 2020 | $8,280,000 | 4 | Project was originally a new Pedestrian Bridge with a $2-3.6M price range. Scope has increased to include improvements for a multi-use trail alongside the bridge. Cost has increased accordingly, and is now in preliminary design. Project location runs between the West Concord MBTA Station and the Concord Meadows Corporate Center with a hookup to the Southern Terminus of the Bruce Freeman. |
N/A |
Major Infrastructure | |||||||||
Acton | MassDOT | Intersection Improvements at Route 2 and Route 27 Ramps | 610553 | PRC approved (2019) | 2020 | $3,480,000 | 3 | Project not programmed in LRTP (meets MPO roadway classification requirement). Priority for District 3 and Town of Acton. Project has had surveying and MSA design contracts opened for it. MassDOT appears to be tracking as a Traffic Safety improvement. |
N/A |
Concord | Concord | Reconstruction & Widening on Route 2, from Sandy Pond Road to Bridge over MBTA/B&M Railroad | 608015 | PRC approved (2014) | 2019 | $8,000,000 | 4 | Project is not programmed in Destination 2040. It is on a regionally significant roadway and includes roadway widening elements. If programmed in the TIP, this project should also be included in Destination 2050. | N/A |
Lexington | Lexington | Route 4/225 (Bedford Street) and Hartwell Avenue | N/A | Pre-PRC | 2019 | $30,557,000 | 4 | Project is programmed in Destination 2040 (FFYs 2030-34). The project is expected to include work on the I-95 Interchange with Route 4/225. If this work includes capacity-adding elements, it will need to be included in Destination 2050. | N/A |
MetroWest Regional Collaborative | |||||||||
Complete Streets | |||||||||
Wellesley | Wellesley | Route 135 Reconstruction (Natick Town Line to Weston Road) | N/A | Pre-PRC | N/A | TBD | 6 | N/A | |
Holliston | Holliston | Reconstruction of Concord Street (Route 126) | N/A | Pre-PRC | 2021 | N/A | 3 | Added through subregional outreach. Project is municipal priority, as it's tied to necessary below-grade sewer work. 10/12/22: MaPIT is showing that a project was initiated back on 7.14.2020 for this stretch for resurfacing and related work, assuming $600K in total cost (likely lowball). |
N/A |
Intersection Improvements | |||||||||
Framingham | MassDOT | Roundabout Construction at Salem End Road, Badger Road and Gates Street | 609280 | PRC approved (2018) | 2019 | $2,520,000 | 3 | N/A | |
Weston | Weston | Intersection Improvements - Signalization of Route 20 at Highland Street | N/A | Pre-PRC | 2021 | N/A | 6 | Added through subregional outreach. | N/A |
Bicycle and Pedestrian | |||||||||
Weston | MassDOT | Weston - Shared Use Path Construction on Route 30 | 612602 | PRC Approved (2/10/2022) | 2022 | $1,050,000 | 6 | Meant to connect into Project 608954. District 6 priority to ensure that the shared-use-path there ties in to the rest of the bicycle network and concludes at a logical terminus. | N/A |
Natick | Natick | Cochituate Rail Trail Extension, from MBTA Station to Mechanic Street | 610691 | PRC approved (4/30/2020) | 2020 | $5,778,069 | 3 | Final section of Cochituate Rail Trail Extension. Imminent 25% design submittal. |
N/A |
Major Infrastructure | |||||||||
Framingham | Framingham | Intersection Improvements at Route 126/135/MBTA and CSX Railroad | 606109 | PRC approved (2010) | 2019 | $115,000,000 | 3 | Project is programmed in Destination 2040 (FFYs 2030-34). May need to be pushed back with LRTP rewrite. Consultant said that depressing Route 135 may be the solution. |
N/A |
North Suburban Planning Council | |||||||||
Complete Streets | |||||||||
Burlington | Burlington | Town Center Complete Streets Improvements | N/A | Pre-PRC | 2021 | N/A | 4 | Complete Streets upgrades along Route 3A from Bedford Street to Arthur Woods Avenue. The scope of work would be additive to existing resurfacing planned under 610704, and would focus mostly on paint. There is potential for widening if the town's design includes a multimodal path while maintaining the current number and width of vehicle lanes. | N/A |
Lynnfield | Lynnfield | Reconstruction of Summer Street | 609381 | PRC approved (2019) | 2019 | $21,521,921 | 4 | N/A | |
Reading | Reading | Reading Downtown Improvement Project | N/A | Pre-PRC | 2020 | $7-$8 million | 4 | Project at conceptual stage. | N/A |
Stoneham | Stoneham | Reconstruction of South Main Street, from Town Center to South Street | N/A | Pre-PRC | 2021 | N/A | 4 | N/A | |
Wakefield | Wakefield | Main Street Reconstruction | 610545 | PRC approved (2019) | 2020 | $26,382,000 | 4 | 41.8 | |
Winchester | Winchester | Town Center Complete Streets Improvements | N/A | Pre-PRC | 2021 | N/A | 4 | N/A | |
Intersection Improvements | |||||||||
Stoneham | Stoneham | Intersection Improvements at Main Street (Route 28), Franklin Street, and Central Street | N/A | Pre-PRC | 2020 | N/A | 4 | Project at conceptual stage. | N/A |
Bicycle and Pedestrian | |||||||||
Stoneham, Wakefield | Stoneham, Wakefield | Mystic Highlands Greenway Project | N/A | Pre-PRC | 2021 | N/A | 4 | N/A | |
North Shore Task Force | |||||||||
Complete Streets | |||||||||
Beverly, Manchester-by-the-Sea | MassDOT | Resurfacing and Related Work on Route 127 | 607707 | PRC approved (2013) | 2018 | $2,300,000 | 4 | Still in preliminary design. | N/A |
Danvers | Danvers | Reconstruction on Collins Street, from Sylvan Street to Centre and Holten Streets | 602310 | 75% submitted (3/5/2010) | 2017 or earlier | $5,183,121 | 4 | Updated 75% design submission needed for project to move forward. Last scored for FFYs 2020-24 TIP. | 46 |
Ipswich | Ipswich | Reconstruction of County Road, from South Main Street to East Street | 611975 | PRC approved (2021) | 2020 | $5,653,500 | 4 | On 10/7/2022, Frank Ventimiglia mentioned that a bridge within the project limits has had a lane closed by MassDOT. Structure IDs are I01005, main concern is Ipswich - 2PN which is an 1861-built historic stone arch mill bridge. | 45.4 |
Ipswich | Ipswich | Argilla Roadway Reconstruction and Adaptation | 612738 | PRC Approved (5/12/2022) | 2021 | $4,628,419 | 4 | Municipal priority for funding. On 10/7/2022, Frank Ventimiglia at Ipswich DPW expressed an interest in pursuing MDP funding to support this project. | N/A |
Marblehead | Marblehead | Bridge Replacement, M-04-001, Village Street over Marblehead Rail Trail (Harold B. Breare Bridge) | 612947 | PRC approved (9/15/2022) | 2019 | N/A | 4 | Per 10.11 email with C Quigley, the project received a PRC and a PROJIS ID in September 2022 after a PNF was submitted 8/2022. |
N/A |
Manchester-by-the-Sea | Manchester-by-the-Sea | Pine Street - Central Street (Route 127) to Rockwood Heights Road | N/A | Pre-PRC; PNF submitted (12/27/16) | 2017 or earlier | N/A | 4 | N/A | |
Manchester-by-the-Sea | Manchester-by-the-Sea | Bridge Replacement, M-02-001 (8AM), Central Street (route 127) over Saw Mill Brook | 610671 | PRC approved (2019) | 2019 | $4,350,000 | 4 | 34.8 | |
Salem | MassDOT | Reconstruction of Bridge Street, from Flint Street to Washington Street | 5399 | 25% submitted (8/20/2004) | 2017 or earlier | $24,810,211 | 4 | Project is not programmed in Destination 2040. It is on a regionally significant roadway and would add roadway capacity. If it is programmed in the TIP, it will need to be programmed in Destination 2050. | N/A |
Wenham | Wenham | Safety Improvements on Route 1A | 609388 | 25% Approved (9/10/2021) | 2019 | $3,629,036 | 4 | N/A | |
Wenham | Wenham | Roadway Reconstruction on Larch Row and Dodges Row | N/A | Pre-PRC | 2019 | $800,000 | 4 | Project at conceptual stage. | N/A |
Intersection Improvements | |||||||||
Essex | Essex | Targeted Safety Improvements on Route 133 (John Wise Avenue) | 609315 | PRC approved (2019) | 2019 | $2,135,440 | 4 | N/A | |
Bicycle and Pedestrian | |||||||||
Peabody, Salem | Peabody, Salem | Riverwalk Project | N/A | Pre-PRC | 2021 | N/A | 4 | MVP grant issued for project design. | N/A |
Major Infrastructure | |||||||||
Beverly | Beverly | Interchange Reconstruction at Route 128/Exit 19 at Brimbal Avenue (Phase II) | 607727 | PRC Approved (2014) | 2021 | N/A | 4 | Project is not programmed in Destination 2040. Is on a regionally-significant roadway, and would expand the interchange. If this project is programmed in the TIP and adds roadway capacity, this project will need to be included in Destination 2050. | N/A |
South Shore Coalition | |||||||||
Complete Streets | |||||||||
Holbrook | Holbrook | Corridor Improvements and Related Work on South Franklin Street (Route 37) from Snell Street to King Road | 608543 | PRC approved (2017) | 2018 | $4,000,200 | 5 | N/A | |
Rockland | Rockland | Corridor Improvements on VFW Drive/Weymouth Street | 612605 | PRC approved (2/10/2022) | 2021 | $13,047,281 | 5 | PNF entered in Jan 2022 | N/A |
Weymouth | MassDOT | Reconstruction on Route 3A, Including Pedestrian and Traffic Signal Improvements | 608231 | PRC approved (2016) | 2017 or earlier | $10,780,100 | 6 | Pre-25% package submitted in July 2021. | N/A |
Weymouth | MassDOT | Resurfacing and Related Work on Route 3A | 608483 | PRC approved (2016) | 2018 | $2,400,000 | 6 | N/A | |
Intersection Improvements | |||||||||
Cohasset | Cohasset | Intersection Improvements at Route 3A and King Street | N/A | Pre-PRC | 2021 | N/A | 5 | Added through subregional outreach. | N/A |
Hull | Hull | Intersection Improvements at George Washington Boulevard and Barnstable Road/ Logan Avenue | N/A | Pre-PRC | 2021 | N/A | 5 | Added through subregional outreach. | N/A |
South West Advisory Planning Committee | |||||||||
Complete Streets | |||||||||
Bellingham | Bellingham | South Main Street (Route 126) - Elm Street to Douglas Drive Reconstruction | N/A | Pre-PRC; PNF submitted (3/13/17) | 2017 or earlier | N/A | 3 | Project would dovetail ongoing project 608887, rehab on Route 126 from Douglas Drive to Route 140. | N/A |
Franklin | MassDOT | Resurfacing and Intersection Improvements on Route 140, from Beaver Street to I-495 Ramps | 607774 | PRC approved (2014) | 2018 | $4,025,000 | 3 | N/A | |
Medway | Medway | Improvements on Route 109 West of Highland Street | N/A | Pre-PRC | 2021 | N/A | 3 | Project at conceptual stage. | N/A |
Milford | MassDOT | Resurfacing and Related Work on Route 16 | 612091 | PRC approved (2021) | 2021 | $4,192,500 | 3 | N/A | |
Millis | Millis | Town Center Improvements | N/A | Pre-PRC | 2020 | N/A | 3 | Project at conceptual stage. | N/A |
Wrentham | Wrentham | Resurfacing and Related Work on Route 1 | 608497 | PRC approved (2016) | 2020 | N/A | 5 | 25% design anticipated July 2022. | N/A |
Intersection Improvements | |||||||||
Medway | Medway | Traffic Signalization at Trotter Drive and Route 109 | N/A | Pre-PRC | 2021 | N/A | 3 | Project at conceptual stage. | N/A |
Sherborn | Sherborn | Intersection Improvements at Route 16 and Maple Street | N/A | Pre-PRC | 2021 | N/A | 3 | Project at conceptual stage. | N/A |
Wrentham | Wrentham | Intersection Improvements on Route 1A at North and Winter Street | 610676 | PRC Approved (12/19/2019) | 2020 | $2,649,000 | 5 | N/A | |
Wrentham | Wrentham | Intersection Improvements at Randall Road and Route 1A | N/A | Pre-PRC | 2020 | $2,649,000 | 5 | Project at conceptual stage. | N/A |
Wrentham | Wrentham | Intersection Improvements at Route 1A and Route 140 | N/A | Pre-PRC | 2020 | N/A | 5 | Project at conceptual stage. | N/A |
Bicycle and Pedestrian | |||||||||
Franklin | Franklin | Southern New England Trunk Trail (SNETT) Extension, from Grove Street to Franklin Town Center | N/A | Pre-PRC | 2021 | N/A | 3 | Project at conceptual stage. | |
Hopkinton | Hopkinton | Campus Trail Connector, Shared Use Trail Construction | 611932 | PRC approved (2020) | 2020 | $1,750,700 | 3 | N/A | |
Norfolk, Walpole, and Wrentham | Norfolk | Metacomet Greenway | N/A | Pre-PRC | 2021 | N/A | 5 | Project at conceptual stage. | N/A |
Sherborn | Sherborn | Upper Charles River Trail Extension to Framingham City Line | N/A | Pre-PRC | 2021 | N/A | 3 | Project at conceptual stage. | N/A |
Major Infrastructure | |||||||||
Bellingham | MassDOT | Ramp Construction & Relocation, I-495 at Route 126 (Hartford Avenue) | 604862 | PRC approved (2006) | 2017 or earlier | $13,543,400 | 3 | High priority for District 3 | N/A |
Three Rivers Interlocal Council | |||||||||
Complete Streets | |||||||||
Canton, Milton | MassDOT | Roadway Improvements on Route 138 | 608484 | PRC approved (2016) | 2020 | $18,467,500 | 6 | Milton also in ICC subregion. Project a high priority for the TRIC subregion. District is working to refine scope. . |
N/A |
Medfield | Medfield | Reconstruction of Route 109 | N/A | Pre-PRC | 2021 | N/A | 3 | Added through subregional outreach. | N/A |
Milton | MassDOT | Reconstruction on Granite Avenue, from Neponset River to Squantum Street | 608406 | 25% submitted (2/10/2017) | 2017 or earlier | $3,665,146 | 6 | Milton also in ICC subregion. | N/A |
Milton | Milton | Adams Street Improvements, from Randolph Avenue to Eliot Street | 610820 | PRC approved (4/30/2020) | 2020 | $1,799,330 | 6 | Milton also in ICC subregion. | N/A |
Needham | Needham | Reconstruction of Highland Avenue, from Webster Street to Great Plains Avenue | 612536 | PRC approved (10/21/2021) | 2021 | $10,402,402 | 6 | Needham also in ICC subregion. | N/A |
Dover, Needham | Dover, Needham | Centre Street Bridge Replacement | N/A | Pre-PRC | 2022 | N/A | 6 | Historic-eligible, needs replacement as it is 1850's era. | N/A |
Westwood | Westwood | Reconstruction of Canton Street | 608158 | 25% Package Received (2/18/2022) | 2017 or earlier | $19,047,306 | 6 | Priority for municipality. MassDOT expresses concerns regarding project readiness due to scope fluctuations. New shapefile is in development for MapIT, there is not one available right now. |
N/A |
Intersection Improvements | |||||||||
Foxborough | Foxborough | Intersection Signalization at Route 140/Walnut Street and Route 140/I-95 (SB Ramp) | 612740 | PRC Approved (5/12/2022) | 2021 | $11,902,600 | 5 | Added through subregional outreach. Town has advanced design outside of TIP process. District supports project. Budget has increased from original $5M estimate in 2021. | N/A |
Medfield | Medfield | Intersection Improvements at Route 27 and West Street | 612807 | PRC Approved (5/12/2022) | 2021 | $3,987,500 | 3 | Added through subregional outreach. | N/A |
Bicycle and Pedestrian | |||||||||
Canton | Canton | Warner Trail Extension, from Sharon to Blue Hills Reservation | N/A | Pre-PRC | 2021 | N/A | 6 | Added through subregional outreach. Feasibility study currently underway. | N/A |
Major Infrastructure | |||||||||
Canton, Westwood | MassDOT | Interchange Improvements at I-95 / I-93 / University Avenue / I-95 Widening | 87790 | 25% submitted (7/25/14) | 2017 or earlier | $202,205,994 | 6 | Project not programmed in Destination 2040. IIt is on a regionally-significant roadway and adds roadway capacity. If programmed in the TIP, this project would also need to be included in Destination 2050. Last scored for FFYs 2020-24 TIP. Regional priority, potential discretionary grant project via MassDOT for State Highway funding. |
47 |
Projects grouped by MAPC subregion and by MPO Investment Program
This table contains projects that were funded using MPO Regional Target funds in the FFYs 2023-27 TIP. This is the active TIP as of 10/1/2022.
Municipality | Project Proponent | Project Name | PROJIS | MPO Evaluation Score | Programmed Year | Design Status (10/6/22) | Programmed Cost (in FFYs 2023-27 TIP) | Highway District | Notes |
Inner Core | |||||||||
Complete Streets | |||||||||
Boston | Boston | Improvements on Boylston Street | 606453 | 60 | 2023 | 25% resubmitted (1/29/2021) | $8,665,052 | 6 | Construction target is now Spring 2024. |
Quincy | Quincy | Reconstruction of Sea Street | 608707 | 40 | 2023 | 75% Package Comments to DE (as of 12/13/2021) | $12,166,638 | 6 | |
Winthrop | Winthrop | Reconstruction and Related Work Along Winthrop Street and Revere Street Corridor | 607244 | 54 | 2023 | 100% Package Received (10/24/2022) | $6,779,797 | 6 | |
Watertown | Watertown | Rehabilitation of Mount Auburn Street (Route 16) | 607777 | 75 | 2023-24 | DPH (11/04/2021) | $27,250,087 | 6 | Project programmed in Destination 2040 (FFYs 2020–24). Construction target Winter 2023/24. |
Lynn | Lynn | Rehabilitation of Essex Street | 609252 | 66 | 2024 | PRC approved (12/6/2018) | $18,279,000 | 4 | |
Everett | Everett | Rehabilitation of Beacham Street, from Route 99 to Chelsea City Line | 609257 | 54 | 2025 | PRC approved (12/6/2018) | $10,545,024 | 4 | |
Brookline | Brookline | Rehabilitation of Washington Street | 610932 | 62.4 | 2027 | PRC approved (2020) | $30,030,812 | 6 | |
Chelsea | Chelsea | Park Street & Pearl Street Reconstruction | 611983 | 69.9 | 2027 | PRC approved (2021) | $12,123,769 | 6 | |
Lynn | Lynn | Reconstruction of Western Avenue (Route 107) | 609246 | 74.9 | 2027 | PRC approved (2018) | $15,000,000 | 4 | Project programmed in Destination 2040 (FFYs 2025–29). |
Bicycle and Pedestrian | |||||||||
Belmont | Belmont | Community Path, Belmont Component of the MCRT (Phase 1) | 609204 | 64.6 | 2026 | 25% submitted (11/3/2021) | $21,034,382 | 4 | |
Major Infrastructure | |||||||||
Boston | Boston | Reconstruction of Rutherford Avenue | 606226 | 59 | 2025-2027 | 25% resubmitted (May 2021) | $190,696,612 | 6 | Project programmed in Destination 2040 (FFYs 2020–24, 2025–29). Anticipated fifth and final year of TIP funding in FFY 2027. Total cost of $183,633,774, with $25,000,000 in anticipated funding from City of Boston. |
Newton, Weston | MassDOT | Bridge Rehabilitation, Commonwealth Avenue (Route 30) over the Charles River | 110980 | N/A | 2024 | 75% Package Received (2/3/2022) | $21,851,750 | 6 | |
Somerville | Somerville | McGrath Boulevard Construction | 607981 | 72.2 | 2027 | PRC approved (2014) | $102,370,000 | 4 | Project programmed in Destination 2040 (FFYs 2025–29, 2030–34). NOTE: Anticipate $30M for FY28 for this. Currently only has its first year of funding. |
Community Connections | |||||||||
Belmont | Belmont | Chenery Middle School Bicycle Parking | S12704 | 49.75 | 2023 | N/A | $4,376 | 4 | |
Newton | Newton | Newton Microtransit Service | S10784 | 53 | 2021-2023 | N/A | $427,000 | 4 | Year 1 of funding in 2021 ($300,000) |
Newton | Newton | NewMo Microtransit Service Expansion | S12694 | 87 | 2023-2025 | N/A | $890,574 | 6 | |
Watertown | Watertown | Pleasant Street Shuttle Service Expansion | S12697 | 78 | 2023-2025 | N/A | $1,002,198 | 6 | |
Cambridge | Cambridge | Bluebikes Station Replacement and System Expansion | S12695 | 78 | 2023 | N/A | $349,608 | 6 | |
Malden, Medford | Medford, Malden | Bluebikes Expansion | S12696 | 78 | 2023 | N/A | $145,821 | 4 | |
Transit Modernization Program | |||||||||
Lynn | MBTA | Lynn Station Improvements Phase II | S12705 | N/A | 2023-2024 | N/A | $48,100,000 | 4 | |
Boston | MBTA | Forest Hills Improvement Project | S12706 | N/A | 2024 | N/A | $6,400,000 | 6 | Total cost of $68,000,000 |
MetroWest Regional Collaborative | |||||||||
Complete Streets | |||||||||
Weston | Weston | Reconstruction on Route 30 | 608954 | 49.2 | 2026 | DPH (9/22/2022) | $17,028,272 | 6 | |
Intersection Improvements | |||||||||
Framingham | Framingham | Traffic Signal Installation at Edgell Road and Central Street | 608889 | 41 | 2023 | PS&E Received (08/08/2022) | $2,484,704 | 3 | |
Ashland | Ashland | Rehabilitation and Rail Crossing Improvements on Cherry Street | 608436 | 38 | 2024 | 25% submitted (2/4/2020) | $1,269,327 | 3 | |
Weston | Weston | Intersection Improvements - Boston Post Road (Route 20) at Wellesley Street | 608940 | 50.6 | 2026 | 25% Package Received - Resub 1 (5/18/2021) | $2,681,330 | 6 | |
Major Infrastructure | |||||||||
Natick | Natick | Bridge Replacement, Route 27 (North Main Street) over Route 9 (Worcester Street) and Interchange Improvements | 605313 | 57.7 | 2024 | 25% Package Received - Resub 1 (5/16/2022) | $46,901,224 | 3 | Project programmed in Destination 2040 (FFYs 2025–29). High priority for District 3. |
Community Connections | |||||||||
Wellesley | Wellesley | Bicycle Infrastructure | S12120 | 42.75 | 2022 | N/A | $85,054 | 6 | |
Marlborough, Hudson | MWRTA | CatchConnect Microtransit Service Expansion | S12701 | 59 | 2023-2025 | N/A | $450,163 | 3 | Hudson is in MAGIC. |
Minuteman Advisory Group on Interlocal Coordination | |||||||||
Complete Streets | |||||||||
Littleton | Littleton | Reconstruction of Foster Street | 609054 | 38 | 2024 | 75% submitted (3/1/2021) | $4,126,209 | 3 | |
Intersection Improvements | |||||||||
Littleton, Ayer | MassDOT | Intersection Improvements on Route 2A at Willow Road | 608443 | 36 | 2022 | 75% submitted (7/12/2021) | $3,226,285 | 3 | Targeted advertisement date of 8/27/22. |
Major Infrastructure | |||||||||
Lexington | MassDOT | Bridge Replacement, L-10-010, Route 2A (Marrett Road) over Interstate 95/Route 128 | 603722 | N/A | 2023 | 100% received (6/30/2022) | $20,456,262 | 4 | Monitoring to ensure advertisement is on time. |
Community Connections | |||||||||
Acton | Acton | Parking Management System | S12122 | 29 | 2022 | N/A | $20,000 | 3 | |
Acton | Acton | Bicycle Parking along the Bruce Freeman Rail Trail | S12702 | 58 | 2023 | N/A | $8,017 | 3 | |
Bolton, Boxborough, Littleton, Stow | Montachusett RTA | Montachusett RTA Microtransit Service | S12703 | 57 | 2023-2025 | N/A | $1,316,061 | 3 | |
North Suburban Planning Council | |||||||||
Complete Streets | |||||||||
Woburn | Woburn | Roadway and Intersection Improvements at Woburn Common, Route 38 (Main Street), Winn Street, Pleasant Street, and Montvale Avenue | 610662 | 75 | 2025 | PRC approved (12/19/2019) | $16,105,600 | 4 | |
Wilmington | Wilmington | Reconstruction of Route 38 (Main Street), from Route 62 to the Woburn City Line | 608051 | 59 | 2025-26 | 75% submitted (1/18/2021) | $25,473,225 | 4 | |
Intersection Improvements | |||||||||
Wilmington | Wilmington | Intersection Improvements at Lowell Street (Route 129) and Woburn Street | 609253 | 53 | 2023 | 100% Package Comments to DE (9/9/2022) | $6,441,358 | 4 | Cost increase to $6,441,358. |
Burlington, Woburn | Woburn | Intersection Reconstruction at Route 3 (Cambridge Road) & Bedford Road and South Bedford Street | 608067 | 52 | 2025 | PRC approved (11/6/2014) | $1,612,800 | 4 | |
Community Connections | |||||||||
Stoneham | Stoneham | Stoneham Shuttle Service | S12699 | 72 | 2023-2025 | N/A | $716,897 | 4 | |
North Shore Task Force | |||||||||
Complete Streets | |||||||||
Beverly | Beverly | Reconstruction of Bridge Street | 608348 | 66 | 2023 | 75% Approved (12/16/2021) | $12,594,932 | 4 | Cost increase to $12,594,932. Targeted advertisement date of 2/11/23. |
Peabody | Peabody | Rehabilitation of Central Street | 608933 | 61 | 2023 | 25% submitted (DPH 6/23/2021) | $15,219,860 | 4 | |
Salem | Salem | Boston Street Improvements | 609437 | 67.8 | 2026 | 25% submitted (DPH 9/27/2022) | $13,977,600 | 4 | |
Ipswich | Ipswich | Resurfacing and Related Work on Central and South Main Streets | 605743 | 48 | 2024 | 25% resubmitted (8/19/2020) | $5,702,076 | 4 | |
Bicycle and Pedestrian | |||||||||
Peabody | Peabody | Independence Greenway Extension | 609211 | 34 | 2024 | DPH (6/22/2022) | $3,248,370 | 4 | Adjusting design from sharrows to off-street path at Essex Center Drive, based on MassDOT 25% design comments. Targeting December/January for DPH. |
Peabody | Peabody | Multi-Use Path Construction of Independence Greenway at I-95 and Route 1 | 610544 | 53 | 2025 | PRC approved (12/19/2019) | $6,568,800 | 4 | Adjusting design at I-95 in advance of 25% design submission. |
Swampscott | Swampscott | Rail Trail Construction | 610666 | 66.4 | 2027 | 25% submitted (1/27/2021) | $8,932,000 | 4 | |
Community Connections | |||||||||
Salem | Salem | Bluebikes System Expansion | S12698 | 77 | 2023 | N/A | $119,629 | 4 | |
Gloucester, Rockport | CATA | CATA On Demand Microtransit Service Expansion | S12700 | 61.75 | 2023-2025 | N/A | $813,291 | 4 | |
South Shore Coalition | |||||||||
Complete Streets | |||||||||
Cohasset, Scituate | MassDOT | Corridor Improvements and Related Work on Justice Cushing Highway (Route 3A) from Beechwood Street to Henry Turner Bailey Road | 608007 | 37 | 2024 | 100% Design Complete (9/22/2022) | $12,990,931 | 5 | As of 10/12/2022, MassDOT pursuing an aggressive alternatives analysis. Project needs to resolve Right of Way issues before moving on to FHWA. Construction of a new culvert (36') is required under 3A. Will be added on to the existing culvert there. Adv on track. |
Hingham | Hingham | Intersection Improvements at Route 3A/Summer Street Rotary | 605168 | 57 | 2025 | DPH (1/11/2022) | $15,474,200 | 5 | |
South West Advisory Planning Committee | |||||||||
Intersection Improvements | |||||||||
Wrentham | MassDOT | Construction of I-495/Route 1A Ramps | 603739 | 55 | 2024 | 75% Package Comments to DE (as of 8/02/2022) | $15,587,884 | 5 | |
Milford | MassDOT | Rehabilitation of Route 16, from Route 109 to Beaver Street | 608045 | 50 | 2026 | 25% Package Comments to DE (7/30/2022) | $10,481,030 | 3 | |
Three Rivers Interlocal Council | |||||||||
Complete Streets | |||||||||
Dedham | Dedham | Pedestrian Improvements along Bussey Street | 607899 | 35 | 2023 | 100% Package Comments to DE (as of 8/17/2022) | $6,314,855 | 6 | Targeted advertisement date of Spring 2023 |
Intersection Improvements | |||||||||
Norwood | Norwood | Intersection Improvements at Route 1A and Upland Road/Washington Street and Prospect Street/Fulton Street | 606130 | 47 | 2023 | 100% Package Comments to DE (as of 7/06/2022) | $7,952,280 | 5 | |
Milton | Milton | Intersection Improvements - Squantum Street at Adams Street | 608955 | 34.4 | 2024 | 25% submitted (11/19/2020) | $2,403,651 | 6 | Milton also in ICC subregion. Target Spring 2024 construction. |
Norwood | Norwood | Intersection Improvements at Route 1 and University Avenue/Everett Street | 605857 | 55 | 2025-26 | 25% resubmitted (1/5/2021) | $25,757,791 | 5 | |
Community Connections | |||||||||
Canton | Canton | Royall Street Shuttle | S12114 | 51 | 2023-24 | N/A | $325,791 | 6 | |
Regionwide | |||||||||
Community Connections | |||||||||
Regionwide | Regionwide | Community Connections Program | S12124 | N/A | 2024-27 | N/A | $6,716,799 | Regionwide | |
Transit Modernization | |||||||||
Regionwide | Regionwide | Transit Modernization Program | S12113 | N/A | 2025-27 | N/A | $19,500,000 | Regionwide |
Projects grouped by MAPC subregion and by MPO Investment Program
This table contains projects that were funded using MPO Regional Target funds and were advertised for construction bids in FFY 2022. Community Connections projects and projects advanced by the MBTA with MPO Regional Target funds programmed in FFY 2022 are also listed here, although those projects are not advertised through the same process as other TIP projects.
Municipality | Project Proponent | Project Name | PROJIS | MPO Evaluation Score | Programmed Year | Design Status (FY23) | Final Programmed Cost (MPO Funds) | Highway District |
Inner Core | ||||||||
Complete Streets | ||||||||
Chelsea | Chelsea | Reconstruction on Broadway (Route 107), from City Hall Avenue to the Revere City Line | 608078 | 61 | 2022 | In construction | $11,301,176 | 6 |
Lynn | Lynn | Reconstruction on Route 129 (Lynnfield Street) | 602077 | 41 | 2022 | In construction | $6,643,384 | 4 |
Major Infrastructure | ||||||||
Somerville, Medford | Somerville, Medford | Green Line Extension to College Avenue with the Union Square Spur | 1570 | N/A | 2016-2022 | In construction | $190,079,465 | 4 |
MetroWest Regional Collaborative | ||||||||
Complete Streets | ||||||||
Minuteman Advisory Group on Interlocal Coordination | ||||||||
Intersection Improvements | ||||||||
Acton | Acton | Intersection Improvements at Massachusetts Avenue (Route 111) and Main Street (Route 27) (Kelley's Corner) | 608229 | 45 | 2022 | In construction (NTP 8/1/2022) | $15,311,125 | 3 |
South Shore Coalition | ||||||||
Complete Streets | ||||||||
Holbrook | Holbrook | Reconstruction of Union Street (Route 139) | 606501 | 46 | 2021 | Advertised (10/31/21) In construction |
$3,036,628 | 5 |
Hull | Hull | Reconstruction of Atlantic Avenue and Related Work | 601607 | 36 | 2021 | Advertised (9/18/21) In construction |
$8,223,422 | 5 |
South West Advisory Planning Committee | ||||||||
Complete Streets | ||||||||
Bellingham | Bellingham | South Main Street (Route 126) - Douglas Drive to Mechanic Street Reconstruction (Route 140) | 608887 | 45 | 2022 | Advertised 02/12/2022 NTP 4/27/2022 |
$6,398,158 | 3 |
Projects grouped by MAPC subregion and by MPO Investment Program
This table contains projects that were removed from the TIP universe during the FFYs 2024-28 TIP cycle. The reason for removing each project is listed in the Notes column.
Municipality | Project Proponent | Project Name | PROJIS | Design Status | Year Added to Universe | Cost Estimate | Highway District | Notes | Previous Evaluation Score |
Inner Core | |||||||||
Complete Streets | |||||||||
Everett | MassDOT | Intersection Improvements on Route 16 | 611969 | PRC approved (2021) | 2021 | $15,300,000 | 4 | This project is being removed from the universe as it was programmed in the FFY 2023-2027 TIP using State Highway Funds. | N/A |
Bicycle and Pedestrian | |||||||||
Medford | Medford | Shared Use Path Connection at the Route 28/ Wellington Underpass | 611982 | 25% submitted (8/8/2022) - Resub 1 | 2021 | $4,385,416 | 4 | This project is being removed from the universe as it was programmed in the FFY 2023-2027 TIP using State Highway Funds. | N/A |
North Suburban Planning Council | |||||||||
Complete Streets | |||||||||
Burlington, Billerica | MassDOT | Resurfacing and Related Work on Route 3A | 610704 | 100% Package Comments to DE (7/14/2022) | 2020 | $6,243,272 | 4 | This project is being removed from the universe as it was programmed in the FFY 2023-2027 STIP as a Statewide project. | N/A |
Major Infrastructure | |||||||||
Burlington | MassDOT | Improvements at I-95 (Route 128)/Route 3 Interchange | 609516 | PRC approved (2019) | 2019 | $3,001,500 | 4 | This project is being removed from the universe as it was programmed in the FFY 2023-2027 TIP using State Highway Funds. | N/A |
Reading | MassDOT | Improvements on I-95 | 609527 | PRC approved (2019) | 2019 | $14,980,000 | 4 | This project is being removed from the universe as it was programmed in the FFY 2023-2027 TIP using State Highway Funds. | N/A |