MBTA Federal Capital Program

FFY 2023-2027 TIP Amendment One - Project List and Descriptions (80% Federal Share)

 

Funds TIP Program CIP ID# Project Name FFY 2023-2027 Project Description

 

FTA Formula Funds (5307, 5337, 5339)

5307 - Bridge and Tunnel

5307 Bridge and Tunnel P0912 Systemwide Tunnel Flood Mitigation Program                                                 $36,600,000 Planning, training, and infrastructure improvements to make the tunnel network more resilient to flooding exposures due to storm surge, precipitation, and sea level rise.
$36,600,000

 

5307 - Revenue Vehicles

5307 Revenue Vehicles P0369 Green Line Type 10 Vehicle Replacement Program                                             $409,175,956 Procurement of 102 new fully-accessible light rail vehicle (LRV) fleet and related infrastructure improvements to replace the existing Type 7 and Type 8 fleets and support increased system capacity.
5307 Revenue Vehicles P0618 Procurement of 40ft Enhanced Electric Hybrid Buses                                         $117,559,030 Procurement of 460 40ft Enhanced Electric Hybrid (EEH) buses to replace 310 40ft diesel buses purchased in 2006-2008 and support more reliable, efficient, and sustainable operations. Includes vehicle testing, warranty, and inspection.
5307 Revenue Vehicles P0649 Option Order Procurement of New Flyer Hybrid 40ft Buses                                    $6,895,142 Procurement of 194 40ft buses with hybrid propulsion to replace an aging fleet and improve fuel economy.
5307 Revenue Vehicles P0652 Procurement of 100 Bi-Level Commuter Rail Coaches                                          $35,076,265 Procurement of 100 Bi-Level Commuter Rail coaches to replace aging single-level coaches, expand capacity from 120 to 180 passengers per coach, reduce number of coaches required, and mitigate operational bottlenecks.
5307 Revenue Vehicles P0911 Hybrid and CNG Bus Overhaul                                                                $20,800,000 Midlife overhaul of major systems and components of 156 40ft hybrid buses, 175 40ft CNG buses, and 45 60ft hybrid buses to ensure reliable and safe operations that meet FTA requirements.
5307 Revenue Vehicles P0918 Future Rolling Stock Fleet                                                                 $40,000,000 Planning funds to support future procurement of 25 electrified or multi-mode Commuter Rail rolling stock to replace the oldest vehicles in the fleet. 
5307 Revenue Vehicles P1016 Mattapan Trolley Select System Upgrade                                                     $2,771,505 Overhaul of the 75+ year old PCC cars operating on the Mattapan Line to improve reliability of the fleet.  Includes work on the propulsion system, trucks, auxiliary electrical power system, wiring, lighting, doors, car body, and paint.
5307 Revenue Vehicles P1151 Blue Line Vehicle Mid-Life Overhaul                                                        $800,000 Planning for the midelife overhaul of 94 Blue Line heavy rail vehicles built by Siemens. The project will address systems at or nearing the end of their intended service lives, obsolete components and functional improvements.
5307 Revenue Vehicles P1154 CNG Bus Overhaul (New Flyer XN40 - SR 1982)                                                $800,000 Planning for the midlife overhaul of 175 forty-foot New Flyer CNG buses delivered in 2016-2017. These buses require overhaul of major systems and components to ensure continued reliable and safe operations and to meet FTA service life requirements.
5307 Revenue Vehicles P1155 Hybrid Bus Overhaul (New Flyer XDE40 - SR 2011)                                            $800,000 Planning for the midlife overhaul of 44 sixty-foot New Flyer hybrid buses delivered in 2016-2017. These buses require overhaul of major systems and components to ensure continued reliable and safe operations and to meet FTA service life requirements.
5307 Revenue Vehicles P1162 Reliability Centered Maintenance - Blue, Orange and Red Line                               $28,320,000 Improvements to trucks, brakes, motors, current collectors, propulsion and auxiliary fuses on the Blue Line and improvements to propulsion, brakes, HVAC, and doors on the Red and Orange Lines. 
$662,997,897

 

5307 - Signals and Systems

5307 Signals and Systems P0285 Signal Program - Red/Orange Line                                                           $112,762,427 Replacement and upgrade of signal equipment on the Red and Orange Lines. Includes renewal of track circuit modules using latest digital audio frequency technology and replacement of wayside equipment on the Orange Line south of Haymarket.
5307 Signals and Systems P0857 Mattapan HSL Transformation                                                                $91,628,495 State of good repair and accessibility improvements, power upgrades, and other infrastructure investments on the Mattapan Line. 
$204,390,922

 

5307 - Stations and Facilities

5307 Stations and Facilities P0075 Elevator Program Multiple Location Design                                                  $43,778,268 Design and some construction work for the replacement of elevators and/or addition of new, redundant elevators and related wayfinding amenities at transit stations.
5307 Stations and Facilities P0078 Hingham Ferry Dock Modification                                                            $6,239,134 Replacement of existing floating dock, access gangway, canopy, and walkways; extension of canopy structure to the Hingham Intermodal Center; and upgraded lighting, safety, and security systems. 
5307 Stations and Facilities P0165 Harvard Square Busway Repairs                                                              $993,026 Rehabilitation of roadway, lighting, signage, drainage, and catenary systems in the Harvard busway and accessibility upgrades to ensure near level boarding for the 71 and 73 buses. 
5307 Stations and Facilities P0671a Quincy Bus Facility Modernization                                                          $60,231,581 Relocation and replacement of the Quincy bus maintenance facility. The new, modernized facility will expand capacity and include the infrastructure necessary to support the MBTA’s first battery-electric bus fleet (BEBs).
5307 Stations and Facilities P0671b Arborway Bus Facility - Design Funding                                                     $28,800,000 Design funding to support the construction of a new Arborway bus facility to accommodate battery electric bus (BEB) infrastructure.
5307 Stations and Facilities P0671c North Cambridge Bus Facility Retrofits                                                     $20,000,000 Renovation of North Cambridge facility to support conversion to battery electric bus (BEB) fleets.
5307 Stations and Facilities P1113 Bus Priority Project Construction                                                          $9,120,001 Funding to support construction of bus priority infrastructure. This may include side or center-running bus lanes, transit signal priority, pavement markings, and stop upgrades. 
5307 Stations and Facilities P1159 Everett Test Equipment Upgrades                                                            $2,400,000 Addition of 2 AC traction motor test cells, 2 tread brake unit test benches, 1 air compressor test unit, and a thermal chamber at the Everett Main Repair Facility.
$171,562,010

 

5337 - Bridge and Tunnel

5337 Bridge and Tunnel P0006 Gloucester Drawbridge Replacement                                                          $12,402,982 Replacement of Gloucester Drawbridge on the Rockport Line. The new bridge will consist of a moveable bascule span with two independent barrels, two spans of precast concrete box beams, a new steel superstructure, and a new micro-pile abutment.
5337 Bridge and Tunnel P0008 Emergency Bridge Design / Inspection & Rating                                              $2,253,902 Funding to support emergency design, inspection, and rating of bridges as needed. 
5337 Bridge and Tunnel P0009 Bridges - Design                                                                           $10,598,672 Design funding to support the repair, rehabilitation, and replacement of bridges across the system. 
5337 Bridge and Tunnel P0018 North Station Draw 1 Bridge Replacement                                                    $165,152,596 Replacement of North Station Draw 1 bridge structure and control tower. Includes expansion of bridge capacity from 4 to 6 tracks, expansion of station platform capacity from 10 to 12 tracks, and a pedestrian path across the Charles River.
5337 Bridge and Tunnel P0037 Emergency Bridge Repair                                                                    $5,014,180 Funding to support emergency bridge repairs on an on-call basis.
5337 Bridge and Tunnel P0182 Tunnel Rehabilitation                                                                      $1,062,973 Construction and professional services relating to tunnel repair and inspection.
5337 Bridge and Tunnel P0495 Bridge Bundling Contract                                                                   $11,200,000 Replacement of six commuter rail bridges at Intervale Rd. in Weston; Bacon St. in Wellesley; High Line Bridge in Somerville; Lynn Fells Parkway in Melrose; Parker St. in Lawrence; and Commercial St. in Lynn.
5337 Bridge and Tunnel P0551 Longfellow Approach                                                                        $133,033,993 Rehabilitation of Longfellow Approach viaduct, Span 1 of the Longfellow Bridge, and station platforms at Charles/MGH Station. Includes new track, power, communication and signal systems, and additional emergency egress and redundant elevators.
5337 Bridge and Tunnel P0627 Systemwide Bridge Inspection and Rating                                                    $29,330,516 Program to support in-depth inspection and load rating of MBTA-owned bridges at regular intervals. Load ratings are used to establish a systemwide priority list of bridge repairs, rehabilitation, and replacement.
5337 Bridge and Tunnel P0892 Saugus Drawbridge Replacement                                                              $8,000,000 Design of Saugus Drawbridge replacement on the Newburyport/Rockport Line. The new bridge would include a widened approach embankment, a new control house, signal upgrades, and relocation of submerged utilities.
5337 Bridge and Tunnel P0907 East Street Bridge Replacement (Dedham)                                                    $14,400,000 Replacement of East Street bridge carrying the Franklin Line in Dedham. The new bridge will feature improved vertical and horizontal clearance, improved roadway features, and improved pedestrian and vehicle access to East Street.
5337 Bridge and Tunnel P1107 Bridge Program Pipeline - Rehabilitation, Repair and Replacement                           $16,000,000 This program uses information provided through the bridge inspection and load rating program to design and construct prioritized bridge rehabilitation, repair, or replacement projects. 
5337 Bridge and Tunnel P1115 South Elm Street Bridge Replacement                                                        $1,800,000 Replacement of South Elm Street bridge on the Haverhill Line serving Commuter Rail, Downeaster, and Pan Am freight trains (costs not funded by FRA discretionary grant.)
5337 Bridge and Tunnel P1116 Systemwide Culvert Inspection and Load Rating                                              $10,000,000 Inventory, inspection, and load rating of the MBTA's approximately 1,300 culverts supporting in-service structures systemwide. The scope of work includes an initial inspection to establish baseline condition, followed by inspection every five years.   
5337 Bridge and Tunnel R0074 Tunnel Inspection Systemwide                                                               $14,890,589 Ongoing inspection and rating of Red Line, Orange Line, Green Line, and Blue Line tunnels. 
$435,140,402

 

5337 - Revenue Vehicles

5337 Revenue Vehicles P0239 F40 Commuter Rail Locomotive Overhaul                                                      $33,670,671 Overhaul of 37 F40 Commuter Rail locomotives to improve reliability and reduce risk of unplanned maintenance.
5337 Revenue Vehicles P0370 Green Line Train Protection                                                                $73,406,175 Procurement and installation of on-board and wayside equipment for a train protection and information system on the Green Line to mitigate red signal violations, train-to-train collisions, derailments, and intrusions into work zones.
5337 Revenue Vehicles P0927 Rolling Stock - Locomotive and Coach State of Good Repair and Resiliency                   $56,800,000 Upgrades to improve system reliability, correct deficiencies, standardize procedures, and increase equipment availability for Commuter Rail rolling stock. Includes vehicle procurement, testing support, service life enhancement, and overhauls.
$163,876,846

 

5337 - Signals and Systems

5337 Signals and Systems P0146 SCADA Upgrades                                                                             $1,600,000 Upgrades to the Power Supervisory Control and Data Acquisition (SCADA) communication network from leased lines to the Security Wide Area Network (SWAN) to provide high-speed ethernet connection at traction power substations and unit substations.
5337 Signals and Systems P0261 Worcester Line Track and Station Accessibility Improvements                                $25,885,742 New third track and realignment of existing tracks on the Framingham and Worcester Commuter Rail lines between Weston and Framingham. Includes upgrades to Wellesley Farms, Wellesley Hills, Wellesley Square, and West Natick Stations.
5337 Signals and Systems P0283 Green Line Central Tunnel Signal - 25 Cycle                                                $4,000,000 Replacement of 25Hz track circuits with 100Hz track circuits in the Green Line central tunnel. Includes replacement of track circuit cable, trough, messenger, cases, relays, rectifiers, and signal power equipment.
5337 Signals and Systems P0301 Systemwide Radio                                                                           $60,333,510 Upgrade of the MBTA’s existing two-way radio system used by MBTA Transit Police and operations personnel. This project includes mobile radios for heavy rail, light rail, and bus vehicles.
5337 Signals and Systems P0591 Green Line Central Tunnel Track and Signal Replacement                                     $96,000,000 Rehabilitation and upgrades to signal and track infrastructure within the Green Line Central Tunnel. Includes central instrumentation houses and signal, track, and power systems at Copley, Park Street, and Government Center.
5337 Signals and Systems P0675 Orange Line Southwest Corridor Track Replacement                                           $12,500,806 Reconstruction of track and support systems on the Southwest Corridor of the Orange Line between Chinatown and Forest Hills Stations.
5337 Signals and Systems P0705 Power Systems Resiliency Program                                                           $3,348,562 Replacement of damaged power cable duct banks that energize areas of the Red, Orange, Blue, and Green Line. Includes excavation, demolition, conduit replacement, manhole replacement, surface restoration, and power cable installation.
5337 Signals and Systems P0904 Systemwide Asset Management Program Phase 3                                                $7,600,000 Implementation of the Asset Management Program in accordance with FTA requirements. Includes professional services, audit, inventory, condition assessments, updates to the National Transit Database (NTD), and Transit Asset Management Plan (TAMP).
5337 Signals and Systems P1104 Traction Power Substation Upgrades                                                         $5,760,000 Complete replacement of electrical systems and strucural, mechanical, and plumbing improvements at nine aging traction power substations (TPSS). This scope also includes a TPSS Design Guide to standardize future improvements.
5337 Signals and Systems P1114 South Boston to Forest Hills Duct Bank Replacement                                         $12,946,281 Replacement of duct banks and cables which carry AC power from the South Boston power complex to Forest Hills.
5337 Signals and Systems P1132 Ashmont Branch Track Replacement                                                           $4,000,000 Design and construction for partial reconstruction of track and track support systems on the Ashmont Branch of the Red Line.This is part of a series of Red Line track replacement projects.
5337 Signals and Systems P1133 Braintree Line Track Replacement                                                           $1,200,000 Design and construction for partial reconstruction of track and track support systems on the Braintree Branch of the Red Line. This is part of a series of Red Line track replacement projects.
5337 Signals and Systems P1139 Systemwide Asset Management Program Phase 4                                                $9,600,000 Implementation of the Asset Management Program in accordance with FTA requirements. Includes professional services; audit, inventory, condition assessments, updates to the National Transit Database (NTD), and Transit Asset Management Plan (TAMP).
5337 Signals and Systems P1149 Unit Substation Replacement Project                                                        $1,851,360 Development of unit substation (USS) Design Guide and replacement of existing power and electrical equipment at unit substation locations (USS), including AC feeder disconnect switches.
$246,626,262

 

5337 - Stations and Facilities

5337 Stations and Facilities P0003 Green Line B Branch Consolidation                                                          $1,570,079 Consolidation of four Green Line B-Branch stops into two new, fully accessible stations: Babcock Street and Amory Street. Features include accessible boarding and exits, security and lighting upgrades, and longer platforms to accommodate Type 10s.
5337 Stations and Facilities P0066 Elevator Program                                                                           $1,597,474 This program funds design and construction for elevator improvements on the rapid transit system. Individual elevator projects are separated into child projects once they reach the construction stage. 
5337 Stations and Facilities P0066a Quincy Adams Accessibility Improvements                                                    $126,634 Replacement of 3 existing elevators and addition of a new elevator at Quincy Adams in order to meet ADA and BCIL requirements. This project also includes upgrades to mechanical, communication and safety systems, and wayfinding signage.
5337 Stations and Facilities P0074 Downtown Crossing Vertical Transportation Improvements Phase 2                             $62,208,880 Design and construction of 3 new elevators to provide vertical transfers from the Red Line northbound to the Orange Line southbound platform, and from the Orange Line northbound to the Red Line southbound platform at Downtown Crossing.
5337 Stations and Facilities P0076 Oak Grove Station Vertical Transportation Improvements                                     $800,000 Accessibility upgrades at Oak Grove station including 3 new elevators, replacement of one existing elevator, sidewalk repairs, and wayfinding and station brightening improvements. 
5337 Stations and Facilities P0078 Hingham Ferry Dock Modification                                                            $400,000 Replacement of existing floating dock, access gangway, canopy, and walkways; extension of canopy structure to the Hingham Intermodal Center; and upgraded lighting, safety, and security systems. 
5337 Stations and Facilities P0087 Braintree and Quincy Adams Garage Rehabilitation                                           $3,396,000 Repairs to existing Braintree and Quincy Adams station garages. Includes upgrades to mechanical, electrical, plumbing, life safety systems, wayfinding, traffic circulation and parking layout. Also includes two new elevators at the Braintree garage.
5337 Stations and Facilities P0129 Newton Highlands Green Line Station Accessibility Project                                  $25,642,762 Accessibility improvements at Newton Highlands on the Green Line D Branch. Includes 3 ramps with canopies, 2 staggered 4-car 300' raised platforms, 2 at-grade pedestrian crossings, site lighting, heated platform shelters, and covered bike racks.  
5337 Stations and Facilities P0163 Forest Hills Improvement Project                                                           $26,089,763 Accessibility and state of good repair improvements at Forest Hills Station. Includes elevator replacement, new elevator/stair tower to connect upper and lower busway, accessibility upgrades, station brightening, wayfinding, and platform repairs. 
5337 Stations and Facilities P0168 Symphony Station Improvements                                                              $35,665,778 Upgrade Symphony Station to a modern and fully accessible passenger facility. Includes construction of four new elevators, raised platforms, accessible restrooms, installation of egress stairs, and upgraded fire alarm systems.
5337 Stations and Facilities P0169 Wollaston Station / Quincy Center Garage Demolition                                        $4,807,477 Complete modernization of Wollaston Station, demolition of the top 3 levels of the Quincy Center parking garage, replacement of one elevator at Quincy Center, and construction of an accessible walkway to Quincy Center.
5337 Stations and Facilities P0174 Natick Center Station Accessibility Project                                                $4,691,266 Improvements to make Natick Center Station fully accessible and connected to the new Cochituate Rail Trail. Includes new stairs, ramps, elevator access, bike shelters, lights, cameras, wayfinding, PTC/ATC upgrades, and streetscape improvements.
5337 Stations and Facilities P0179 Winchester Center Station                                                                  $5,145,827 Renovation of Winchester Station on the Lowell Line to provide code compliant new level-boarding height, fiber resin platforms, lighting system, accessibility ramps, elevators, walkways, variable message signs, public address system and CCTV. 
5337 Stations and Facilities P0395 Worcester Union Station Accessibility and Infrastructure Improvements                      $6,000,610 Includes high-level center platform with elevators, ramps, and stairs, replacement and realignment of station tracks, and construction of a new rail crossover to improve accessibility, operations, and service capacity at Worcester Union Station.
5337 Stations and Facilities P0496 Silver Line Gateway - Phase 2                                                              $366,663 Construction of new Chelsea Commuter Rail station with a direct connection to the Silver Line. Includes new platforms, canopies, foundation systems, signage, track infrastructure, train signals, power cable duct banks, and BRT grade crossings.
5337 Stations and Facilities P0631b Blue Line Communications Room SGR Improvements                                             $16,374,166 Rehabilitation of communication rooms along the Blue Line to bring them into a state of good repair. 
5337 Stations and Facilities P0679 Codman Yard Expansion and Improvements                                                     $48,118,356 Improvements to Codman Yard including in-kind replacement of existing infrastructure and expansion of storage capacity to support the new Red Line fleet.
5337 Stations and Facilities P0856 Ruggles Station Improvements Phase 2                                                       $79,545,355 Continuation of improvements under P0175 focused on travel paths, alternate egress of Orange Line subway and Commuter Rail platforms, accessible restrooms, public address systems, electrical and fire protection upgrades, and roof replacement. 
5337 Stations and Facilities P0923 E Branch Accessibility & Capacity Improvements                                             $44,000,000 Improvements to surface track and stations on the E-Branch of the Green Line, extending from the Northeastern Station portal to Heath Street Station.
5337 Stations and Facilities P0924 B Branch Accessibility & Capacity Improvements                                             $79,649,691 Track realignments, accessibility improvements, potential consolidation, and station and traction power upgrades along the Green Line B Branch, between Blandford St and Warren St stations.
5337 Stations and Facilities P1010 Riverside Vehicle Maintenance Facility Modifications & Upgrades                            $39,480,004 Upgrades to existing hoists, pits, and mezzanines at the Riverside Vehicle Maintenance Facility to accommodate the future Type 10 fleet. 
5337 Stations and Facilities P1011 Green Line Extension Vehicle Maintenance Facility Modifications & Upgrades                 $9,943,730 Design and installation of a new hoist at the Green Line Extension (GLX) Vehicle Maintenance Facility to accommodate the future Type 10 fleet.
5337 Stations and Facilities P1101 Lake Street Complex Demolition and Reconfiguration                                         $23,446,916 Demolition of the Lake Street facility and reconfiguration into an expanded yard. The site will be designed to maximize train storage, streamline yard operations, and eliminate a sharp curve in anticipation of the larger Type 10 light rail fleet.
5337 Stations and Facilities P1103 Reservoir Yard and Non-Revenue Track Optimization and Reconfiguration                      $11,590,284 Reconfiguration of various track elements at Reservoir including: the lower west yard, East/West Wye, Chestnut Hill Avenue connection, B-Branch connection, and non-revenue track around Cleveland Circle. 
5337 Stations and Facilities P1144 Commuter Rail Facilities State of Good Repair                                              $62,960,000 Funding to support Commuter Rail facilities improvements including design support contracts, roof and roof equipment replacement, WiFi and IT infrastructure, fluid systems, and maintenance of way facilities. 
5337 Stations and Facilities R0071 Lynn Station and Parking Garage Improvements Phase II                                      $13,225,910 Design funding for new elevators, stairs, platform, canopy, and architectural improvements to the station and the intent to acquire and demolish structures under station's viaduct. Existing parking garage will also be replaced by surface parking.
$606,843,624

 

5339 - Bus and Bus Facility

5339 Bus and Bus Facilities P0618 Procurement of 40ft Enhanced Electric Hybrid Buses                                         $32,334,607 Procurement of 460 40ft Enhanced Electric Hybrid (EEH) buses to replace 310 40ft diesel buses purchased in 2006-2008 and support more reliable, efficient, and sustainable operations. Includes vehicle testing, warranty, and inspection. (5339 portion only.)
$32,334,607

 

Note: Project descriptions and dollar amounts are preliminary only and are provided for informational purposes. In many cases, the scopes of work and project budgets will become more fully developed as the design process proceeds and is completed. The MBTA may also opt to fund a project from a different FTA funding source based on the timing of projects and the availability of FTA funds.

 

RRIF/TIFIA Financing Program

Projects Potentially Funded by Federal RRIF/TIFIA Loans

RRIF/TIFIA Financing P0671a Bus Facility Modernization Program - Quincy Bus Facility Potential Loan Amount TBD Relocation and replacement of the Quincy bus maintenance facility. The new, modernized facility will expand capacity and include the infrastructure necessary to support the MBTA’s first battery-electric bus fleet (BEBs).
RRIF/TIFIA Financing P0952 Future Regional Rail Layover Planning Potential Loan Amount TBD Planning, design, environmental and real estate due diligence, and construction work for a new Commuter Rail layover facility. Includes operational and space needs assessment, design alternatives, and property prospection.
RRIF/TIFIA Financing P0018 North Station Draw 1 Bridge Replacement  Potential Loan Amount TBD Replacement of North Station Draw 1 bridge structure and control tower. Includes expansion of bridge capacity from 4 to 6 tracks, expansion of station platform capacity from 10 to 12 tracks, and a pedestrian path across the Charles River.
RRIF/TIFIA Financing P0170 Newton Commuter Rail Stations Potential Loan Amount TBD Design of double-side, high level, fully accessible platforms at Auburndale, West Newton, and Newtonville Stations. Additional improvements include bike shelters, pick-up/drop-off locations, accessible parking, and connection to The Ride.
RRIF/TIFIA Financing P0178 South Attleboro Station Improvements   Potential Loan Amount TBD Design for the construction of a new South Attleboro Station to include 800-foot high-level platforms, 3 elevators, platform access ramps, a bus bay, egress to Newport Avenue, additional parking, improved vehicular circulation, and updated lighting.
RRIF/TIFIA Financing P0863 South-Side Commuter Rail Maintenance Facility Potential Loan Amount TBD Assessment and design for a new Commuter Rail maintenance and layover facility at Readville. Includes design for future construction of multiple maintenance bays within Yard 1 and Upper Yard 2. 

Note: The MBTA is exploring the use of federal loans through the Build America Bureau to finance certain capital projects at a lower interest rate than traditional tax-exempt bonds. This includes loans under the Railroad Rehabilitation & Improvement Financing (RRIF) and Transportation Infrastructure Finance and Innovation Act (TIFIA) programs. The projects listed above are being considered for this program, subject to the approval of funding through the CIP process. Additional project and funding information will be provided through a future TIP/Amendment if federal grant funds or loans are utilized. The MBTA may also opt to fund a project from FTA formula funds or another source, depending on project timing and funding availability.