FFYs 2017-21 TIP Target Highway Program: Staff Recommendation
Proponent(s) TIP ID Project Name Investment Category Proposed 1st FFY Advertised Current
FFY 2016
Proposed
FFY 2016
Current
FFY 2017
Proposed
FFY 2017
Current
FFY 2018
Proposed
FFY 2018
Current
FFY 2019
Proposed
FFY 2019
Current
FFY 2020
Proposed
FFY 2020
  Proposed
FFY 2021
Target Funds Proposed in FFYs 2017-21 Other Funds (Non-Target Funds)  Total Project Cost (all FYs) Additional Information
Needham and Wellesley 603711 Rehabilitation/replacement of 6 bridges on I-95/ Route 128 (add-a-lane - Contract V) MI (cont'd.)  $24,197,023  $24,197,023  $13,360,000  $24,539,816  $13,168,183  $1,988,367              $26,528,183     no change in cost; moves $11,179,816 in programming from FFY18 to FFY17
Winchester, Stoneham, and Woburn 604652 Tri-Community Bikeway B/P FFY16  $5,429,110  $5,429,110                      $-      $5,429,110  
Lexington 607409 Reconstruction on Massachusetts Ave. CS FFY16  $5,200,000  $5,200,000                      $-      $5,200,000  
Weymouth 605721 Intersection improvements at Middle St., Libbey Industrial Pkwy and Tara Dr. INT FFY16  $937,326  $937,326                      $-      $937,326  
Boston 606117 Traffic signal improvements at 9 locations INT FFY16  $4,654,920  $4,654,920                      $-      $4,654,920  
Bedford, Billerica, and Burlington 29492 Middlesex Turnpike improvements, phase III MI FFY16  $21,691,442  $21,691,442  $6,604,906  $6,604,906                  $6,604,906  $8,438,700  $36,735,048 MassDOT addresses cost increase of $7,438,700 in FFY 2017; AC over FFYs 2016-17
Weymouth and Abington 601630 Reconstruction and widening on Route 18 (Main St.) MI FFY16  $4,800,000  $4,800,000  $12,850,000  $12,850,000  $21,031,758  $19,591,490  $6,600,000  $8,040,268          $40,481,758  $36,530,510  $81,812,268 MassDOT addresses cost increase of $21.7m in FFYs17-19; moves $1.44m from FFY18 to FFY19
Somerville and Medford N/A Green Line Extension project (phase 2) (or phase 1) MI FFY16  $8,100,000  $8,100,000  $29,900,000  $29,900,000  $40,000,000  $40,000,000  $40,000,000  $40,000,000  $40,000,000  $40,000,000    $32,000,000  $181,900,000    $190,000,000 $190m flexed to transit; adjustments to local match to include municipal contributions
Woburn 604935 Reconstruction of Montvale Ave. MI FFY17      $4,752,838  $4,752,838                  $4,752,838    $4,752,838  
Southborough 604989 Reconstruction of Main St. (Route 30) CS FFY18      $6,862,752  $-      $7,281,248              $7,281,248    $7,281,248 high risk for FFY17: move to FFY 2018;
cost increase of $138,448
Brookline 605110 Intersection and signal improvements at Route 9 and Village Square (Gateway East) CS FFY18      $4,818,649  $-      $5,273,202              $5,273,202  $1,000,000  $6,273,202 high risk for FFY17: move to FFY 2018;
cost increase of $251,738
Marlborough 604810 Reconstruction of Route 85 (Maple St.) CS FFY17      $5,613,636  $5,613,636                  $5,613,636    $5,613,636  
Hingham   607309 Reconstruction and related work on Derby St. CS FFY17      $3,994,287  $4,927,769                  $4,927,769    $4,927,769 cost increase of $933,482
Hingham (MassDOT) 600518 Intersection improvements at Derby St., Whiting St. (Route 53) and Gardner St. INT FFY18          $3,057,735  $3,057,735              $3,057,735    $3,057,735  
Newton and Needham 606635 Reconstruction of Highland Ave., Needham St. and Charles River bridge MI FFY18          $15,464,292  $15,464,292              $15,464,292    $15,464,292  
Hopkinton 606043 Signal and intersection improvements on Route 135 CS FFY19              $8,138,816  $8,501,376          $8,501,376    $8,501,376 cost increase of $362,560
Everett 607652 Reconstruction of Ferry St. CS FFY19              $7,244,124  $7,244,124          $7,244,124    $7,244,124  
Natick 605034 Reconstruction of Route 27 (North Main St.) CS FFY19              $14,725,286  $15,459,553          $15,459,553    $15,459,553 inflation-adjusted cost
Boston 606453 Improvements on Boylston St. CS FFY20              $7,373,484  $-      $8,214,319      $8,214,319    $8,214,319 move to FFY20;
cost increase of $524,900
Milford 607428 Resurfacing and intersection improvements on Route 16 (Main St.) CS FFY19              $3,149,619  $3,149,619          $3,149,619    $3,149,619  
Lynn 602077 Reconstruction on Route 129 (Lynnfield St.) CS FFY20              $3,889,305  $-      $4,953,270      $4,953,270    $4,953,270 move to FFY20; cost increase of $873,454
Woburn 604996 Bridge replacement, New Boston St. over MBTA MI FFY21                  $11,355,289  $-      $17,784,392  $17,784,392    $17,784,392 move to FFY 2021
address cost increase of $6 million
Boston 606226 Reconstruction of Rutherford Ave. MI FFY20                  $7,000,000  $7,000,000    $21,832,529  $28,832,529  $8,578,930  $128,645,836 Cost reflects LRTP estimate; use earmarks in FFY21; assumed AC over 5 years (FFY20-24)
Ashland 604123 Reconstruction on Route 126 (Pond St.) CS FFY20                  $15,532,405  $15,532,405      $15,532,405    $15,532,405  
Walpole (MassDOT) 602261 Reconstruction on Route 1A (Main St.) CS FFY20                  $18,584,373  $18,584,373      $18,584,373    $18,584,373  
Boston 605789 Reconstruction of Melnea Cass Boulevard MI FFY19                $7,853,499          $7,853,499  $17,444,339  $25,297,839 Previously programmed entirely with non-target funds. List in LRTP as Major Infrastructure.
Salem 608352 Canal St. Rail Trail construction (phase 2) B/P FFY19                $2,595,840          $2,595,840    $2,595,840 B/P Investment Program
Framingham 608228 Reconstruction of Union Ave. CS FFY21                        $10,063,912  $10,063,912    $10,063,912 CS Investment Program;
project score: 60 (tied 2nd highest CS roadway)
Holbrook 606501 Reconstruction of Union St. (Route 139) CS FFY21                        $1,363,630  $1,363,630  $1,527,250  $2,890,880 CS Investment Program;
project score: 46 (5th highest CS roadway)
Beverly 608347 Intersection improvements at three locations INT FFY21                        $3,509,576  $3,509,576    $3,509,576 INT Investment Program;
project score: 63 (highest ranked intersx.)
Norwood 605857 Intersection improvements at Route 1 and University Ave./Everett St. INT FFY21                        $6,317,236  $6,317,236    $6,317,236 INT Investment Program;
project score: 55 (2nd highest intersx.)
Regionwide   Community Transportation  CT FFY21                        $1,750,000  $1,750,000    $1,750,000 (Keep minimum of $1.5m)
Note: Projects in bold type are listed in the current Long-Range Transportation Plan (LRTP),  Charting Progresss to 2040. Costs in FFYs 2018-2021 reflect an additional annual 4% inflation increase over current construction cost estimate. AC = Advanced Construction (multiple funding years)
  DRAFT Total AVAILABLE Regional Highway Target Funds:    $75,009,821  $75,009,821  $88,759,294  $89,188,965  $92,626,333  $92,656,334  $92,626,333  $92,626,333  $92,626,333  $94,819,913    $94,819,913  $464,111,458
  DRAFT Total PROGRAMMED Regional Highway Target Funds:    $75,009,821  $75,009,821  $88,757,069  $89,188,965  $92,721,968  $92,656,334  $91,120,634  $92,844,280  $92,472,067  $94,284,367    $94,621,275  $463,595,221
  Regional Highway Target Funds Remaining (UNPROGRAMMED):    $0  $0  $2,225  $(0)  $(95,635)  $0  $1,505,699  $(217,947)  $154,266  $535,546    $198,638  $516,237
0.0% 0.0% 0.0% -0.2% 0.6% 0.2% over/underprogrammed
Indicates a change in project cost     B/P = bicycle and/or pedestrian
Indicates a project moved in to an earlier TIP element CS = complete streets roadway reconstruction
Indicates a project moved out to a later TIP element     CT = community transportation / parking / clean air mobility
Indicates a new addition to the TIP   INT = intersection improvement
Indicates removed from the TIP     MI = major infrastructure